HomeMy WebLinkAbout2014-00844 - tree removal � ' � CITY OF ORONO
2750 KELLEY PARKWAY * � 0 1 4 - 0 0 8 4 4 *
DATE ISSUED: 08/06/2014
ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 1400 BRACKETTS POINT RD
PIN : I 1-1 17-23-32-0020 �f��
LEGAL DESC : RGT ORONO POINT � �
: LOT 000 BLOCK 000
PERMIT TYPE : ZONING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : TREE REMOVAL WI'I'HIN 0-75
APPLICANT
�OTAL
JUNDT, JAMES& MARY Payment(s)
P.O. BOX 1
CRYSTAL BAY, MN �5323-
OWIVER
JUNDT,JAMES& MARY
P.O. BOX l
CRYSTAL BAY, MN 55323-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be perfornicd according to
the approved plans and specifications,applicable City approvals,and thc
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and beeome null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsiblc for assuring all required inspections are
requested in conformance with the State[3uilding Code.'This permit may be
revoked aC any time for due cause.
��. � i � i��
Applicant Permitee Signature Date Issu� By Signature Date
� City of Orono
Zoning Permit Application
/-- Permit number: �� —
�O� Mailing Address: Q _
PO Box 66 Date received: O
� Crystal Bay,MN 55323-Q066
Escrow#and
IStreet Address: amount:
� a ` 2750 Kelley Parkway Permit Fee:
� � Orono, MN 55356
�! �' Approved by:
�KEst►O�� Fax: 952-249-4616 Notes:
Main: 952-249-4600
This application form must be completed in full and all required information must be submitted. (Please print.)
Job Site Address: J�{ �p Q�-a`1(��-}-,r }�j��t�- '�(�0.�,
,
CONTRACTOR/APPLICANT INFORMATION:
Name: N�ic,1.,,ae j �e�,ti.;b�✓'.�n
Phone: Z- z Z- z. o �— Fax:
Address: j�o� ��acke.�-1-S Po��c3-- City: tt�'YZt�t� ZIP: �535'/
Contact Person: S�,z�c r,�,r �0,.e ContacYs phone number y3�� Z�jz� z�)o5
Email �;a ,,,��y�s;,��,,yApplicant is: ontractor �. Homeowner �c+rc�ooe�
�___ _�
PROPERTY OWNER INFORMATION:
Name: ,,�r^� ��T1 vi .��,t v1 -�—.
Phone(day): �Z- Z �C
Mailing Address: ��pp (��U��c�+����„t� � ZIP: ,�"'�'�q/
Email and/or Fax
Overall ProjectDescription: �e� � �� rQea�yQ �,n,t �}�-f�e. �v� 75' Z on�--
�BoXk TYPE OF PERMIT COST*
Dock, Residential-Permanent dock on any lake or initial seasonal dock not on $50+engineering review costs
Lake Minnetonka ermanent dock re uires CUP
Dock, Commercial $50+engineering review costs
Escrow for erosion control and en ineerin review costs $2,000
Hardcover Permit: Driveway, Patio, Sidewalk, Etc.(New or Replacement) No charge
Also re uired is a Minor or Ma�or Land Atteration Permit
Land Alteration,Major(grading,filling, or excavating) more 500 cubic yards or $50
more than 10 cubic yards in lakeshore setback (also requires CUP)
Escrow for erosion control and en ineerin review costs As determined b CUP
Land Alteration,Minor(grading,filling or excavating)-500 or less cubic yards $50+engineering review costs
outside of lakeshore setback or less than 10 yards in lakeshore setback
Escrow for erosion control and en ineerin review costs $2,000
Retaining Wall measuring under four feet require a zoning permit. $50+engineering review costs
Retaining walls measuring more than four feet(from bottom of footings to top of
wall)require a building permit. (Tiered retaining walls are considered one wall
unless the walls are separated by twice the height of the lower wall.)
Escrow for erosion control and en ineerin review costs $2,500
Stairvvay to Lake(New or Replacement) $50+engineering review costs
Escrow for erosion control and engineering review costs $2,000
Structure Permit for other stn�ctures not requiring a building permit but $50+engineering review costs
regulated by the zoning code(including, but not limited to accessory building of
less than 120 square feet, detached deck or platform and sport court)
Escrow for erosion control and en ineerin review costs $2,500
Tree Removal or other ve etation removal in 0 to 75 foot zone No char e.
Tem ora Construction OfticelTrailer associated with buildin ermit $30
(over)
*Permit fee will be cotlected when the permit is issued.
Updated: November 30,2012
, APPLICANT/OWNER ACKNOWLEDGEMENT:
• Applicant/Owner agrees to provide all information required or requested by the Planning Department;
• Owner agrees to pay the City of Orono for engineering consultant review costs where applicable;
• Applicant/Owner certifies that the information supplied is true and correct to the best of his/her knowledge. The
applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure
to do so, the staff has no alternative but to reject it until it is complete;
• Applicant acknowledges the attached Escrow Agreement is completed and signed by Owner;
• ApplicanUOwner understands their project may require an initial and as-built survey per City Code Section 86-68.
• Some or all of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the
subject of the data. Confidential data is information which generally cannot be given to either the public or the subject
of the data. Our purpose and intended use of this information is to annually update our records and records of other
ovemmental a encies re uired b law. tf ou refuse to su I the information,the a lication ma not be issued.
The undersigned certify that the information supplied is true and correct to the best of their knowledge.
Applicant's Signature: Date: �- z 3 '/�
/
Property Owner's Signature: y Date: � -Z3 � /�
�
TYPE OF PERMIT: SUBMISSION REQUIREMENTS: Except for tree removal permits, all permits
require a completed application form, escrow agreement(signed by the property
owner) and escrow check from owner, two copies of all plans, and three copies
of all grading plans or surveys/site plans
Dock, Residential Seasonal Dock—survey showing proposed dock
Permanent Dock—plans as approved by CUP and copy of LMCD permit(if applicable)
Dock,Commercial 1. Structural plans for the dock
2. Survey showing the proposed location of the dock
3. Copy of LMCD permit
Hardcover Permit 1. All Minor or Major Land Alteration Permit requirements apply as appropriate
2. Hardcover calculations, existing and proposed
3. Plans
Land Alteration,Major 1. Plans as approved by Conditional Use Permit
2. Erosion control plan or copy of MCWD Erosion Control Permit
Land Alteration,Minor 1. Survey/grading plan including existing and proposed contours
(Less than 10 cu.yds. within 75'of 2. Amount of fill to be imported and/or exported and haul route
lake or less than 501 cu.yds 3. Amount of earth to be moved around on site
elsewhere.) 4. Erosion control plan or copy of MCWD Erosion Control Permit
Retaining Wall 1. Plans for wall(s)
2. Unless repair or exact replacement of existing wall, submit an updated survey with
grading plan including existing and proposed contours
3. Hardcover calculation worksheets if in shoreland district
4. Erosion control lan or co of MCWD Erosion Control Permit
Stairway to Lake 1. Construction plans for stairway, including footings
2. Topographical survey of property with proposed stairs shown
3. Erosion control plan or copy of MCWD Erosion Control Permit
Structure Pertnit 1. Construction plans.
2. Survey of property with proposed structure shown and with setbacks to property
lines, other structures on property and the septic system indicated. The general
location of any sewer and water services should be shown if applicable.
3. Grading plan if grading is proposed.
4. Hardcover calculation worksheets
5. Erosion control lan or co of MCWD Erosion Control Permit
Tree RemOval Call: 952-249-4600 to schedule a single tree removal inspection. A re-planting plan/
mana ement lan re uired for clear cuttin , buckthom or other intensive ve etation removal.
Updated: November 30,2012
ZONING PERMIT ESCROW ACREEMENT
Pertnit#
AGREEMENT made this day of , 20_, by and between the CITY OF ORONO,
a Minnesota municipal corporation ("City")and ("Owners").
Recitals
1. A building permit application has been filed for a zoning permit for a property located at
the ("Subject Property"), legally described as
Hennepin County Minnesota.
2. Owner requests the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensu�e reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
7. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit $ with the City. All accrued interest, if any, shall be paid to the
City to reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering or legal consultant review) or will
incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible
for under a zoning permit application. The escrow will also guarantee reimbursement to the City for all out-of-
pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater
Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be
used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to
public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant
review) associated with permit # if compliance with the approved zoning permit is not
accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be retumed to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred by the City exceed the amount in escrow, the City shaA have the right to certify the unpaid balance to the
subject property pursuant to Minn. Stat.§§415.01 and 366.012.
CITY: CITY OF ORONO OWNER:
By:
tts
Internal Use Only: C Original to Planning Departrnent �Copy to Street File
Updated: November 30,2012
DATF, ,/ TIME �
CITY OF ORONO CALLED IN �f- ���'
INSPECTION NOTICE CHEDULED �� _.Q�
PERMIT NO. ��y"'����OMPLETED
ADDRESS ���� ����� � �
OWNER O h�f TELEPHONE NO.�-s�"o�5't�a��S
CONTRACTOR �G aG�- �eLl� /�'
�; DESCRIPTION �' � �-� �e����
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL O MECHANICAL RI ❑ LAKESHORFJWETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP Q COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
Z OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
� ,v�-e,�-�--� v�o�1n-GM�� � ���
� -
�
O � -(G `� ��')`i`'�`i'�
�
O
�
W
�
Q
�
2
W
�
W
�
�
J
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
� ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECWERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call forthe next inspection 24 hours in advance. (952� 249-46�0
OwnerfContract�n sit
Inspector. �
White Copyllnspector's Ffle Canary CopylSfte Notice