HomeMy WebLinkAbout2011-00236- addn/remodel/repair CITY OF ORONO PERMIT NO.: 2011-00236
2750 KELLEY PARKWAY
ORONO, MN 55356- �ATE Iss[1ED: 07/12/2011
952 249-4600 FAX: 952 249-4616
ADDRESS : 1265 BRACKETTS POINT RD
PIN : 11-117-23-32-0010
LEGAL DESC : RGT ORONO POINT
: LOT 000 BLOCK 000
PERMIT TYPE : ADDITION/REMODEL/REPAIR
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ADDN/REMODEL/REPA[R
ACTI V ITY : 434-RESIDENTIAL
VALUATION : $ 250,000.00
NOTE: SEPERATF PERMITS REQUIRED: PLUMBING,MECHANICAL,ELECTRICAL(STATE)
ADVANCED PLAN REVIEW$1,271.89 PD WITH CHECK#081252
PERMIT FOR A TRELLIS
APPLICANT PERMIT FEE SCHEDULE 1,956.75
STREETER&ASSOC[ATES STATE SURCHARGE(VALUATION) 125.00
18312 M[NNETONKA BLVD
WAYZATA, MN 55391 TOTAL 2,081.75
(612)449-9448
Minnesota State License#: 1380
OWNER
O'SHAUGHNESSY, ROGER
1265 BRACKETTS POINT RD.
WAYZATA, MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the �
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and oid if construction authorized is not
commenced within 180 of the date of issuance,or if construction is
suspended,�r a period f 80 days at any time after wark has commenced.
The appli t is respo le for assuring all required inspections are
requested n conform e with the State Building Code.This permit may be
revoked any time due cause.
/ �� / �� /�� �
Appl' ant rmrtee Signature Date Iss d By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
�� �) ��►Z �1
City of Orono
l
Building Permit Application
for New Structures or Additions �a�8� - 7�
Mailing Address: Permit number:
���,�,� PO Box 66
,\ � Crystal Bay, MN 55323-0066 Date received: //
�'k '�
�I �-. . Received by:
`� }y {,�,� , �,� Sf�eet Address: �/• Q
\�.�c, �����,�t� G�� 2750 Kelley Parkway Plan review fee: l /
�.tR �<�"� � Orono, MN 55356 �D!�—OO�
�?fEsxos''
--___ ' Total Fee:
Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us
This application form must be completed in full and all required information must be submitted.
Incomplete applications will be returned. (P/ease print)
GENERAL INFORMATION:
Job Site Address: 2,(p,, � �''� ��j�,
Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes No
If yes, a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus servic will be
required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed.
CONTRACTOR/APPLICANT INFORMATIpN:
Name: � � �((� � "�c�Cl,'�-'f'�C J��
State License# Expiration Date: 3 3( �2
Phone: G.�72-�-l.��j - (office) S'%� ��f(✓` ?`{�j (cell)t�/z-���-
Mailing Address: I���Z M�rv�-�'o+-3� �J�� �Cit ZIP: 5��3`�l yL�'
Y� `l,?�}`'l�r�r�4
Contact Person: ^�,�� EZ,,����� Applicant is: ontrac� / Homeowner (Circle One)
Email and/or Fax: rvd�aic.�,�� 57f�'�,�- q.�,src��q�s • C��
PROPERTY OWNER INFORMATION:
Name: �E;�,�2 C� ��69vbr�������
Phone (day): �($�Z.-�ZZ"t - Z�,pl
Address: �Zb�} '��a:r--,5 �,;�T 2v� City: (�2,C� ZIP: !��3`t/
Email and/or Fax LTp./�Gv� � (�,4(Li�j��r�i, L�,�.�'.('��.�
ARCHITECT/ENGI ER INFORMATION:
Name: �9�,4t-�►�1M �� F!'RP.�tI r'6F;�'tG�.-
Phone (daY)� Zpl.,- ��Z.�-�"l�'1�Z.
Address: �4�g /Z ry ��� City: �(�E �lU� ZIP: ���Z Z
Email and/or Fax: 2�.-iT l� (o24E�1/a�i�G}P�•C'.��
PROJECT INFORMATION:
1. Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal&
Water Supply
❑ New Construction ❑ Single Family with ❑ Residence
❑Addition attached garage ❑ Garage/Accessory Bldg. ❑ Public Sewer
❑Accessory Building ❑ Single Family with ❑ Deck
❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer
��her: (specify) �'S ❑ Multiple Family/Condo ❑Warehouse
❑ Public ❑ Storage ❑ Public Water
""Any earth movement may require ❑ Commercial �Other(specify)
MCWD review 8�permits. ❑ ndustrial ���5 ❑ Private Well
Minnehaha Creek Watershed District(MCWD) ther: (SpeCify)
18202 Minnetonka Blvd �J�r�,q}-��
Deephaven, MN 55391
Phone: 952-471-0590
Fax: 952-471-0682
www.minnehahacreek.or
Estimated Construction Valuation (excluding land) $ ��
CUSTOM HOMES • RENOVATION • DESIGN
BEN DUNLAP,Senior Project Manager
Neu�Nome Division
� Dicect 952.4495746 z 1��R
Streeter�Associates,Inc■ 18312 Minne[onka Btcd.,Wayzata,MN 55391-32 3 2
952.449.9448■Cell 612.801.4002■Fa�952.449.4987■MN Lic.�1380
E-inail I�unlap�StreetervA.sociares.com�wwwSereeter-Associatescoin
I
STRUCTURE INFORMATION:
1. Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction
a. Length(ft.)= Number of bedrooms= �I Wood/Frame
❑ Masonry
b.Width (ft.)= Number of garage stalls: �,Metal
Attached= ❑ Pole Bldg.
Areas in square feet Detached= ❑ ICF
❑ On-site Prefab
c. Basement= ❑ Off-site Prefab
d. 15`Story = ❑Other(please specify):
e. 2nd Story=
f. YZ Story =
g. Total Area=
REQUIRED SUBMITTALS:
All of the information must be submitted in order for your application to be processed:
Not
Enclosed A licable
❑ Permit A lication
❑ Pro osed Buildin Plans
O MN State Ener Code Calculations and Mechanical Code Re uirements Form
❑ Surve meetin all re uirements
❑ G� Stormwater Pollution Prevention Plan
❑ Hardcover Calculation s
❑ � Se tic S stem Site Evaluation Re ort
❑ ,� Access Permit
❑ � Wetland Buffer Im rovement Plan
� ❑ En ineered Plans for Retainin Walls 4 feet or above
� ❑ Plan Review Fee
❑ ❑ Other
APPLICANT ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative
but to reject it until it is complete;
• Acknowledges the Escrow Agreement is completed and signed;
• Understands some or ail of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject
of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our
purpose and intended use of this information is to annually update our records and records of other governmental agencies
required by law. If you refuse to supply the information,the application may not be issued.
• Agrees that in the event that weather or other co �ditions prevent the completion of an as-built survey at the time the
Certificate of Occupancy is requested a tempo ertificate of Occupancy may be issued upon receipt of a $10,000
escrow to ensure completion of the a -built su nd all site improvements.
ApplicanYs Signature: Date: � — ` �—` �
;c :v D O 70 �� p ❑ L; � 0 � �0 Cl m
� � � � � � O � D � `n � '� �v -n = cn o �
� Q y �, -, � �' �n m � v o 0 o m o � n; N nWi
�' cn D � p� � c � �- c c o Q m � v G�
.-t a N
v o � m � � � W � 3 o Q cu �� � o Q °' m
-r� T
� f� x' < � tn ,� O cQ � p' �<- c� � y C7 � p O tD
m ; ;!;. <D� ; � � O G � O � -, �
N�N � � � � n C n � � � f�D � �
� o o (� �' -.; 7C' � _ .Z) � V)
3 co �7 O � � W f/a � •'*, �
C�i � ❑ < � � Q' Z � � '��'
� Z � � � � � N � �
' a � � c�D � c�u < C � O f� 'V S� N N � fn "O '�
r � Rl G � Lll N � r► ti' N fD � 6 '* tD
x o a � _ � � a� � c� `D � � � C� � t`-�D � 3
O p `� � `° � � �' 9 � -n � � � �: � r,:
Z C" C C W N '3 N � n Z � C L
Z 0 � � � A O C � -�
m p o � O � � � � � � �. c�
�
� 0 ❑ L\�� (V , fD �o v�a '� � � ,t°.�., � -n cr3 � m
-I O 0 0 T (n � � � � "� v A p O � � N
Z m � � -�Da � �- 3 � X X X X y � � cn o
p -' c� � n� n N a: � o
Z � o � � � p G n �
� � � �
� C � � �
D �; � � r:
'� ° � y �
rr- � � a
W � � �'n
� � v 0 � O ❑ � � o
m -� ly �— At O
�1 m � v � � � � o� d
O � � � � � � °: � �D
Z
� cfl c�
'O ❑ 'g �• � p � �
r Z � �'. � � � 3 n u n n -<
� (D — VJ � tTl
�' O O. � � rt �' fn
Z � � � � �
� o, o.
�
m
�
� 3 � � - Z
� � � O
� .-' c
-,
�, �. �.
n� �
a
�
�
d
�
�
�
y �
�
�
�.:
N
�'±;'
- c� �
} � o a o � �
' � } rn � s � rn Z o
� R� L f6 � 3 4- t Z
���� � N � N ca O N d
�'� ,p �' N .'�-� (6 .�.. � � O Y C c�.'� �
$"' v+ � � �' � O O � � 'O 'a O � ��
,... �c c rn � c •-
� � y � � �o � � � @� m �
0 v� m '� o � � '= m � � �t
' ..� � N -a c.� d cn
�' `�'� � o ` n� � -� � � �6 � o } � � �
� � .� s M � O � � uf0i a � o w � � � V } in
�,' � c� C� � w- m c� � m � c r cn C7 �
� � N � = o Q � o � c � a� a�is 'a� a
� a (V, � � 'a �k Z � a � � � � w. L �
i .«' .� � a� o o � c°�i o a� 3 c Y Q
�: ca O � a� o c o n a� -- c� �
� LL �p Z
N � m m U "'�.S n in in c� � '� �
� 0 d Q c Y — o � a� c .a � .� 0
�. � 'G 'C 'C 'a +_' � -� � � cY.� � � t � � o G1 -a o
L > > > 9 O � Q -o �-� a� ,� � L a '� c y � Z
� � O O O O � a� z � o � a o m c � 'X � O p �
� }+ Q. Q Q. �. � C� r O 7 � L CO .w+ N �
� Q Q Q � o >, � � � � �
� G> �i N G9 ++ � � F- � ��J�E. d
�/'� � � 0 0 a. � W Ci m � � Q � � •� } .
�
ro � .
� � N N � Q � m � � ` N R �
3 'o � t o � > (� Q ° ; '' ' a Q
� o Z �a' " Q o �
.' Z �.�, v = �
�.` i- � -� � a Q
� � .� � � d � o c m 3s � Z y o
�"'' � V � � o 0 0 � "3 > ❑ o O
�F+ � � Q W .� � ` a� @ �6 -� � a� vi 'v �YO
� � . p � � c p � a� p
■� c ea li � � � p o 0 3 o cLa N � d `.
� O Q. � a0 jij � � N ... � � rn�- (n � o a 'l�
�
� � � •(� Q � a�i �e �o r .� c � � = Z �
(,� � � 0 4� O Z a � a�c a �o � . �
� � '_ � � Z e„ N � o a�i i� r ° � .X cLi � � �
C jL J y O a O � -p tA Q. �
/� � "„"� � � ?, (0 � � � � N � t ..
i
Q 1] � � L .p � 3 0 �
Q. ` � Z
U (� � V .'�.. �O Q O N � �L-.. p�� � (� � � � �
3 � � � � � � � } � �' �p�..
� �/ � Z � .L...� "' N � Y � � O L � � � 1
•/w, � y+ y� � � W � m O � U � N � � C N
�yW \" � Q� W N C � 0 U �"- � � .O "O
� � '�' ,F„ ' � � Q c � � n � � oco-oa �.. o � �
�" Li , .. .� ` ` � � v Z .
3 m
� d C! .` � L m N � � �p N � � � � � � i (A . in
(U G> � •� �� �r+ Q .� a �p U U � ,«t„ w � �p U O �` G� "� • .
'� L m ;L '� •> ` C1 N +-� iIi � _ � � N N � �- L � (0 � c� t!J � C � v
� J O d �. O .Y = � � at m ._ � a� � Q O � t
g � � �- p� � � -� � U � ... u� .- E O .c L .- u� ... 0 N � p o p � �
�; a � 3 � o> c � � � a� a�i ca c � in �n � o -� 0 3
0 �' � � +� Y d I� N � r �
�` O Q •� � � � •� � � � � Z 2 N � y � � � � •� N'�
; n- � � p � L. N p � � J � � ~ U U � i N V o � � p r' �
� � a eA N m U' ji N cn � C a� m � � � � a� ._ } � N `n Y o m
� •� � � � ° o � a ¢ m m � � � = Q �g
U €
- Q � N N (A � LL m I�i � � � W� o W a�
� � N
y-� r �j,
' �Q�f^^.F� kJR � �,�SaJ�f{v�k"�c`�•'. �'1.2-�� KFAd21��kNT t1�
OROr►G+ �4�+*�ET
HARDCOVER CALC�I.LL�TION WORKSHEET
SETBACK ZONE: (CiRCLE ONE} 0-75' S-250' 250-500' 500-1000' t `'� ��j � €�
EXfSTING HARDCOVER IN ZONE
A. House x = �b� S.F.-�fl�SC
Length Width
x = 6�t� s.F.- +3�r4Drt��
x = 96� S.F. -OOOV
B. G�age x __ = i'i�� S.F.-P40L (��sT�t7
C. Driveway x = b6�S S,F.-Q��GK����'��`'�'°`'Y
x = 4�43 S.F.- STONc' w.4UG
D. Sidewalk x = 2$I S.F.-FZo�T fNTf2�1�e�
x = i S� S.F.-�'��ppt��e;- �`•:���'S
�.
E. Patio/Deck x = �3 S S.F. `W�'Up �N�:uC
x = 30�3 S.F.-�pT -rvf; pEcr<
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Retaining x = 1L}-��j S.F.- ������p"���"
Walls S
.41G�f3 �LrC-
H. Other x = �2.{� S:F.- T;aGr»� l;�„Q,i
TOTAL HARDCOVER IN ZONE - 2i,��61 S.F. A
TOTAL PROPERTY ARE;4 IN ZONE - 45,,42D S.F. B
A 2►{f,b1 = B 4�42� x100 = 2?,7D %
PROPOSED HARDCOVER IN ZONE �vEr G�.N�r
-- p�2o P�S��
A, HOUse x = �' I25 S.F. `"��r?F vvE,2 P��T�O
Lengtn Width
= S.F. '
u� ❑ � � . = S.F.
a� —
,°'�, m v � -o �.�
B. Garage 'D 'D �' � .+ = S.F.
�
-*
C. Driveway 0 O O x� � � = S.F.
rn x< p� -e - S.F.
� � � � 3
D. Sidewalk xp �° n = S.F.
�' S.F.
x� � �
E, Patio/Deck � X I� _ s�F� LL1 0 0
_ X � - S.F. ) `�' �
z ' ' rr O
F. Landscape �' x � = S.F. U �, �
Underlain x = S.F. W � 0
By Plastic x � = S.F. � ,Q �
G. Retaining x = S.F, U
UValis
� 21� G� �
H. Oth2r x = * � �� 5.�.
TOTAL HARDCOVER 1N ZONE - �� , 7�� S.F. A
TOTAL PROPERTY AREA IN ZONE - q�,42 D S.F. B
q = B x 100 = 22,$3 °�
� • � -
K.C>c�Ei', �. �!,�r.�1�a �;��r'
J�"x+�n� �='�"'� ��.!�2A N6,�I�•�h r.{�" 4'�'
4_'].tj -ND G�-lqr+�e'�
HARDC ER CALCULATION WORKSHEET '����~� ���"��
SETBACK ZONE: {CIRCLE ONE) 0-75' 75-250' 250-500' 500-1000' �N �-aT �(�
EXISTING HARDCOVER IN ZONE
A. House x = S.F.
Length Width
X = S.F.
x - S.F.
B. Garage x - S,F.
C. Driveway x = S,F,
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = 3�Z S.F.-,������ ���a�L
7;� ''u f` _
x = S.F. '
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Retaining x = S.F.
W alls
H. Other x = S.F.
TOTAL HARDCOVER IN ZONE - 343Z S.F. A
TOTALPROPERTYAREAINZONE ;"'_'� '� ��'��-_= �? ��"- ������"•,� - 5?.44o S.F. B
A 3$2 ;. g S?.'�4 p x 100 = ��.67 %
PROPOSED HARDCOVER IN ZONE
A. House x = S.F.
Length Width
x = S.F.
x = S.F.
V`
B. Garage � -J � ��—, n = S.F.
C. Driveway z � � � �� _
S.F.
n p x� �° ... = S.F.
m m m N r
D. Sidewalk. � � �• � = S.F, �
� � = S.F. � Z
_ � W = O
E. Patio/Deck x = S.F. � N �
rr x �. = S.F. U � 0
�
F. Landscape x = S.F. � 0
Underlain x = S.F. W Q }-
By Plastic x = S.F. � �
_ � �
G. Retaining � Dc = S.F.
Walls I
H. Other � v x = S,F.
TOTAL HARDCOVER IN ZONE - S.F, A
TOTAL PROPERTY AREA IN ZONE - S.F. B
A = B x 100 = %
��
�' � �] DATE TIME ✓
CITY OF ORONO CALLED IN / �
INSPECTION NOZI�E ��� CHEDULED 7 _���
PERMIT NO. �� �l�(/v�/�OMPLETED
ADDRESS d
OWNER TELEPHO E NO. l —� � �C�
CONTRACTOR ��-�� ' �� �
>; DESCRIPTION
�
t� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
� ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
Q ❑ FRAMING ❑ MECHANICAL�FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
C
�
�
O
� �, � `�1`���� �..t �`-
0
�
W
�
Q
�
z
W
�
W
�
�
�
d �y���
W Y�wORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑ CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WlLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� 249-460�
OwnerlContractor on site:
. �
Inspector. o� ' =� --
White Copyllnspector's File Canary CopylSite Notice
Planning • Zoning
Department
Memo
To: Finance Department
From: Christine Mattson, Planning Assistant
CC: Street File
Date: 5/21/2012
G/L: 101-22205
Re: Building Permit Escrow Refund
Building Permit #2011-00236 pertaining to 1265 Bracketts Point Road is complete. The
Applicant, Streeter & Associates, on behalf of the property owner, Roger O'Shaughnessy,
has requested a refund of his $2,500 escrow.
The following is attached:
• Escrow Refund Request
• Email from Bonestroo indicating no unbilled WIP on this project
• Email from Campbell Knutson indicating no unbilled WIP on this project
• Original signed escrow agreement
• Copy of cash register receipt showing escrow amount received
Mail to: Roger O'Shaughnessy
1265 Bracketts Point Road
Wayzata, MN 55391
wAstreet files\wakefield road\220\escrow refund memo 2011-00339.doc
Christine Mattson
From: Darren Amundsen
Sent: Wednesday,May 16, 2012 9:17 AM
To: Christine Mattson
Subject: RE: Unbilled WIP
None for us
From: Christine Mattson fmailto:CMattsonCalci.orono.mn.usl
Sent: Monday, May 14, 2012 4:26 PM
To: Amundsen, Darren; 'Sherry Charboneau'
Subject: Unbilled WIP
Hello,
Any unbilled WIP for the following?
Zoning Application Address WIP
11-3533 3980 Dahl"Road NO
Building Permit
2011-00236 1265 Bracketts Point Road O
2011-00339 220 Wakefield Road O
2011-00417 1255 DickensonStreet O
2011-00448 2940 Fox Street O
2011-00010 f/k/a/155 MacKinnon, now 155 Kintyre O
Lane
Christine Mattson
Planning Assistant
City of Orono
2750 Kelly Parkway Orono I MN 155356(physical address)
PO Box 66 1 Crystal Bay I MN 155323-0066(mailing address)
2 952.249.4620 1 8 952.249.4616
®cmattson@ci.orono.mn.us 1 -16 www.ci.orono.mn.us
Office Hours: Monday-Friday 8 am to 4:30 pm
Summer Office Hours begin Monday,May 21,2012
Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday, May 28,2012(Memorial Day)
1
Christine Mattson
From: Sherry Charboneau [SCharboneau@ck-law.com]
Sent: Tuesday, May 15, 2012 10:53 AM
To: Christine Mattson
Subject: RE: Unbilled WIP
Christine:
No unbilled WIP on any of these for Campbell Knutson.
Have a good day.
Sherry
Sherry L Charboneau
Legal AWstant
CAMPBELL KNUTSON P.A.
1380 Corporate Center Curve•Suite 317•Eagan,MN 55121
Iff(651)2346230•Fax:(651)452-5550
®scharboneauOck-law.com•www.ck-law.com
From: Christine Mattson [mailto:CMattsonlalci.orono.mn.usl
Sent: Monday, May 14, 2012 4:26 PM
To: Darren Amundsen (darren.Amundsen(&bonestroo.com); Sherry Charboneau
Subject: Unbilled WIP
Hello,
Any unbilled WIP for the following?
ZoningApplication Address
11-3533 3980 Dahl Road
Building Permit
2011-00236 1265 Bracketts Point Road
2011-00339 220 Wakefield Road
2011-00417 1255 Dickenson Street
2011-00448 2940 Fox Street
2011-00010 f/k/a/155 MacKinnon, now 155 Kintyre Lane
Christine Mattson
Planning Assistant
City of Orono
2750 Kelly Parkway I Orono I MN 155356(physical address)
PO Box 66 1 Crystal Bay I MN ( 55323-0066(mailing address)
9 952.249.4620 1 A 952.249.4616
®cmattson@ci.orono.mn.us I -t www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
i
Checklist for Refunding Building Permit Escrows
Building Permit # I-M53q
Street Address: = Watd "K&d_..
Applicant Name: -- 1�
Escrow request received Date:
Permit Type: l on
Are all completed?inspections es No
P
If not, list what is outstanding:
Was there a Temporary Certificate of Occupancy issued? Yes No Date:
Was there a Final Certificate of Occupancy issued? Yes No Date:
❑ As-built survey required? Yes, approved on NO DNA
❑ Email CK & Bonestroo to see if there is any unbilled WIP. Date email sent:
❑ Prepare memo for Finance Department
z:\fonns\zoning standard forms\checklist for refunding building permit escrows.doc
Last Updated: 10-31-2011
BUILDING PERMIT ESCROW AGREEMENT
Orono Building Permit#2011-00339
AGREEMENT made this 7 day of , 2k0 &/ , y d between the CITY OF ORONO,
a Minnesota municipal corporation ("City")and al A.il/.f AV'(5 ("Owners").
Recitals
1. A building permit application has been filed for an addition located at 220 Wakefield Road the
('Subject Property"), legally described as Lot 1, Block 1, Wakefield Farms 2nd Addition , Hennepin County
Minnesota.
2. Owners request the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW.The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall ,be consistent with expenses the
Owners would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the work (including planning,
engineering, or legal consultant review) associated with building permit #2011-00339 if compliance with the
approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred b the City exceed the amount in escrow,the City shall have the right to certify the unpaid balance to the
subj ct'pirio5pypu uant to Minn. Stat. §§415.01 and 366.012.
CITY: OWNER:
By:
Its: `" �► \
4 i
cit of of
Kelley Parkway 92-249-40
Sm
Receipt !b: 3.004927 Jul 08, 2011
Beth # Rick Davis
pla"* and Zcnin 2 500.00
201101 20D Wakefield ,
Rd
101-2m elo r Deposit
Deferred Rev-Dev Pe
Total: 2,500.00
Cfieck k too: 1026 2,500.00
Payor:
Betfi & Rick Davis 2�5g0.00
Total Applied:
Change Tendered: .00
07/08/11 07:47PA
CITY OF ORONO PERMIT NO.: 2011-00601
2750 KELLEY PARKWAY
ORONO,MN 55356- DATE ISSUED: 07/08/2011
952 249-4600 FAX: 952 249-4616
ADDRESS 220 WAKEFIELD RD
PIN 36-118-23-31-0010
LEGAL DESC WAKEFIELD FARMS 2ND ADDN
LOT 001 BLOCK 001
PERMIT TYPE ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: THIS$2500 ESCROW IS TIED TO BUILDING PERMIT 2011-00339
APPLICANT ESCROW FEE-BUILDING 2,500.00
DAVIS,RICHARD&BETH TOTAL 2,500.00
220 WAKEFIELD RD
WAYZATA,MN 55391-
OWNER
DAVIS,RICHARD&BETH
220 WAKEFIELD RD
WAYZATA,MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grantpermission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
Applicant Permitee Signature Date Issued By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
. �.
#I- PervitWorks
File Transaction Maintain Reports
i� Geobase Property Record
* Permit
Permit#: 20114MM Update Address
Permit Address: 1220 WakefieW Ind r' Main PIN Address
r Additional PIN Address
General I Fees WsPectioos X41 I Nates I Appicant Detai I CO Defarl I
Seq InspecOon Type Inspector Date Status tHFee Rec2 Franc ng WGtD 9fi=11 P 3 Insulation SOMA 9V20I2011 P 4 Final WGIB 12H62011 P
I
Ml
Add New Dalale