Loading...
HomeMy WebLinkAbout2014-00148 - mechanical ' " ' CITY OF ORONO * 2 0 1 4 — 0 0 1 4 8 * 2750 KELLEY PARKWAY DATE ISSUED: 09/16/2014 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 1645 BOHNS POINT RD PIN : 17-117-23-11-0007 LEGAL DESC : REG. LAND SURVEY NO. 0565 : LOT 000 BLOCK 000 PERMIT TYPE : MECHANICAL(> $500) PROPERTY TYPE : RES[DENTIAL CONSTRUCTION TYPE : MECHANICAL- MULTIPLE VALUATION : $ 61,083.00 NOTE: GGOTHERMAL SYSTEM I BOSC1 i SPLI"I'SYSTEM TA049 1 BOSGi SPLI�I'SYSTGM TA061 2 BRYANT NAT UAS rURNACES 1 BURNHAM NA"I�GAS FURNACE 1 RE7,NOR NAT GAS FURNACE 3 GAS FP 1 KITCHEN F,XHAUST 1 1 BATH EX}-IAUST & GAS LINES FOR 3 FP,2 DRYER, BBQ&RANGF, APPLICANT MECHANICAL 763.54 STATE SURCHARGE MECH (VALUATION) 30.54 PRONTO HEATING&AC MAIL-IN FEE 2.00 7588 WASHINGTON AVE S EDEN PRAIRIE, MN 55346- TOTAL 796.08 (952) 835-7777 Payment(s) CHECK 9411 796.08 OWNER CHURCH,JOHN & KLERISSA 1645 BOHNS PT RD WAYZAZ'A, MN 55391- AGREEMENT AIVD SWORN STATEMENT The work for which this pern�it is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. "This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specitied herein."1'his permit will expire and become null and void it�construction authorired is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all reqi�ired inspections are rcquested in conformance with the State[3uilding Code.This permit may be revoked at any time for due cause. 9 i /� i /� Applicant Permitee Signature Date Iss d I3y Signature Date FO CITY SE NLY O Ci of Orono � � P.O.Box 66 Date Receiv� ermit# � ��� O 2750 Kelley Parkway Crystal Bay,MN 55323 Approved By: �� Amount$: Phone(952)249-4600 Fax(952)249-4616 y �� F� � �'�fstio�`� CITY OF ORONO—MECHANICAL PERMIT (All Commercial perniits must be approved by the Building Official or Inspector and/or Fire Marshall) GENERAL INFORMATION 1. You may apply for mechanica]permits by mail or in person at the City offices. Applications wili be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Desi�ns—Complete calculations,details and specifications are required for each heating,ventilation,humidification-dehumidification,and air conditioning installation including heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to type,manufacturer and model. Data shall be presented on form provided. 4. When any new construction or remodeling is involved,a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected(rougb-in and final). Call(952)249-4600. (24-48 hour notice required) RECEIYE� 7. House Heating Test Record must be submitted before final. TYPE OF PERMIT _ __(Check All That Ap�nly) ___ ,[�Residential ❑Commercial(Approval Required) ❑ New �Additional ❑ Repairs �Replace Job Site/Owner Information: Site Address: � L�s 7 �C%i'/ �"� '� / \� ,� Owner����Y��( �1 Y�/L�1 )�'�—�1 Mailing Address: ��'^�/j l� S� �/�� /�� c��,,: �,��'l� z�p: ��3y'/ Home Phone: Alternate Phone: Contractor Information: Contractor: . ` �����Contact Person: / v� ��'���� �.;/z S Address: ������i�S� ���Un State Bond#: City: ��u� �i Zip:�'l/1�� Expiration Date: Phone: � Alternate Phone: ` �Z� � ` / /�� ��Z� "� ��'��7 7 ❑ Insurance—Current: 1 MECHAIVICAL SYSTEMS BEING INSTALLED Note: All Geothermal Systems will now require a Site Plan&Review by our Building Official. IS THIS GEOTHERMAL? �,Yes ❑No � ��j�.Gr �I���/� S �'�S�s��'"� t 2� �G 6% �,�Z.,��J�,1'��'"" HEATING SYSTEM �"f� y < Quantity: / / Make: � h.�' � tZ�' � �/►^Vl 4 lvl yi,�t� Model: / 6 U"(I � � � � �P� (� Fuel: �l� .S ��e� ��--5 iti' v � Flue Size: (� ,��� ji � �� '�(„� ��� `��� Input BTLTs: ��0�'(O [s'�G�� � r>1 outpUt BTus: 7G ��' � " ��,�' � ��� ` � CFM: �=lJ�[.'' �l��!d COOLING SYSTEMS Quantity: Make: Model: Tons: H.Power FIREPLACES 3 � Gas Factory Fireplace Brand Name: Wood Burning Fireplace ❑ Wood Stove Model No.: ❑ Wood Stove with Flue/Masonry VENTILATION i � No. Kitchen Exhaust�duct recirculating ��cfm �f No. Bath Exhaust(must have duct outside) �/��-��9f�yJ(./ cfm ❑ No. Other Fans: Locations � � cfm FUEL STORAGE (Must be approved by Fire Marshall if proposing to abandon tank in place.) ❑ Installation ❑ Removal Fuel Oil: gallons ❑ Underground ❑Inside ❑Outside LP Gas: gallons Other: GAS LINE ONLY � �y �,, ����� � � � � Outdoor Grill � Other/List What&Where: ���1? L ' / t'y' 2 � � ��/,'� c.j� � , �G�� PERMIT FEE CALCULATION(S) BASED OFF-2002 STATE STATUE ❑ Yes,this section applies The replacement of a Residential fixture or appliance that meets all three of the following requirements: 1. Does not require moditication to electrical or gas service. 2. Has a total cost of$500.00 or less;excludin�the cost of the fixture or appliance:and 3. Is improved,installed or replaced by the homeowner or licensed contractor. Skip next section,if this applies; Cost of Permit $ 15.00 State Surcharge $ 5.00 Mail-In Fee(If Applicable) $ 2.00 Total Permit Fee $ PERMIT FEE CALCtiLATION S -JOBS OVER $500.00 If above does not apply;follow guidelines below: 1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$50.00) , / -' ��� X .0�25$ 7,��� =S � (contract price) (minimum$50.00) 2. STATE SURCHARGE ��%� � y x .0�05 $ ��� ` � (contract price) 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ �� r �� " ■ * CONTRACT PRICE or JOB COST means the acrizal or estimated dollar amount charged for the permitted work including materials, labor, profit, and other tixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor or installations are furnished by the owner, tenant or any other party, the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. MECHANICAL PERMIT APPLICATION AGREEMENT The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. , Applicant's Signatur : Date: L-/�// / 3 � ' M ' _ _ _- _ _ . _ _. - ----� --- - - - - - -- - -- - -- - - _ _ _ - - - - - -- - ---- - - --- ._- --- - --._-_-_ - -------- -- - - - . _ _ -- --- -- ------ I I Rhvac-ResicSential 8 Light Commercial HVAC Loads Elite Software Development,Inc Pronto Heating and AC � Church Residence Eden Prairie,MN 55344 Page 1 � _ _ _ _ - - - - ---__ - _ _ _ _ _ - - -- ----- - - II Pr�ject Report _ � I ��eneral Pro�ect Information Project Title: Church Residence Designed By: Doug Dormanen Project Date: 11-4-13 Client Name: Stonewood Company Name: Pronto Heating &Air Conditioning Company Representative: Doug Dormanen � Company Phone: 952-835-7777 I i � Design Data I Reference City: Minneapolis, Minnesota Building Orientation: Front door faces North Daily Temperature Range: Medium I Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains Drv Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -16 -12.38 n/a n/a 70 n/a Summer: 95 73 36% 50% 72 30 � �Check Figures Total Building Supply CFM: 3,306 CFM Per Square ft.: 0.294 Square ft. of Room Area: 11,233 Square ft. Per Ton: 1,506 I Volume (ft3)of Cond. Space: 114,749 i ---- .- -- _- - - -_ _ __ _ - - -_---- Building Loads � Total Heating Required Including Ventilation Air: 186,677 Btuh 186.677 MBH Total Sensible Gain: 76,696 Btuh 86 % Total Latent Gain: 12,810 Btuh 14 % i Total Cooling Required Including Ventilation Air: 89,506 Btuh 7.46 Tons (Based On Sensible + Latent) I �Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. 'L_ ---- - - - - -__ _ _ - --- --- - --. - . __ - --__ _ _ _ _ _ _ ____ _ � C:\ ...\Stonewood-Church.rh9 Monday, November 04, 2013, 3:22 PM i ' `Ir _ _-. _. __. ._ . . ._ _ .- .._- - ._ .-_ - -. ._. - _-_. -_ ..__ - ._ _ .___. -. _.___.-_ __-. - .._...__- .. __- _ .'__ ._-_- ____-. ___ - .. ... � Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc Pronto Heating and AC � Church Residence Eden Prairie, MN 55344 Pa e 2 --_ _ __ _- - _- - - - - - - - - - - - . - --- - - --- Load Preview Report _ � Net ft.z Sen Lat Net Sen Sys Sys Sys Duct Scope Ton /Ton Area Gain Gain Gain Loss Htg Clg Act Size CFM CFM CFM Building 7.46 1,506 11,233 76,696 12,810 89,506 186,677 2,253 3,306 3,306 System 1 3.14 1,065 3,348 33,065 4,658 37,722 61,344 698 1,405 1,405 24x10 Ventilation 3,068 2,499 5,567 9,178 Zone 1 3,348 29,996 2,159 32,155 52,166 698 1,405 1,405 24x10 3-Main Level 3,348 29,996 2,159 32,155 52,166 698 1,405 1,405 16-8 System 2 4.32 1,827 7,885 43,631 8,153 51,784 125,332 1,555 1,900 1,900 36x10 Ventilation 3,068 2,499 5,567 9,178 Zone 1 -Clg.: 20%, Htg. 33% 3,324 10,366 1,903 12.269 37.850 507 486 486 10x10 2-LowerLevel 3,324 10,366 1,903 12,269 37,850 507 486 486 6-� Zone 2-Clg.: 13%, Htg.: 19% 759 6,869 773 7,642 21,779 292 322 322 8x8 1SportCourt 759 6,869 773 7,642 21,779 292 322 322 4-� Zone 3-Clg.: 67%, Htg.:49% 3,802 34,748 2,978 37,726 56,525 757 1,628 1,628 28x10 4-UpperLevel 3,802 34,748 2,978 37,726 56,525 757 1,628 1,628 19-� Sum of room airflows may be greater than system airflow because system has multiple zones. L . --- _ _ __ - __ - __ _ _ C:\ ...\Stonewood-Church.rh9 Monday, November 04, 2013, 3:22 PM �: �___ _ _ _ - - -_ _ _ _ _ _ _ _ _ - - - ____ _ _ - - Rhvac-Residential 8 Light Commercial HVAC Loads Elite Software Development,Inc � i ' Pronto Heating and AC- _ - . _ _ _ - .--. � - - - - - - - _ - -Church Residence� Eden Prairie,MN 55344 _ Pa e 3 � otal Building_Summary Loads � _ _ _ _ - - - - - _� i � De cP�tiont _-- - _ - - - -- - -Quan Loss _ _ Ga n - Ga n -- Ga nl I i ! 1 D-cv-o: G lazing-Dou b le pane, opera b le win dow, c lear, 1 2 3 8 6 0,6 8 7 0 3 5,1 3 2 3 5,1 3 2 � vinyl frame, outdoor insect screen with 50% coverage, light color closed blinds with 100% coverage, u-value 0.57, SHGC 0.56 , 11 N: Door-Metal - Polystyrene Core 60 1,806 0 714 714 12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 4599.9 26,902 0 7,946 7,946 cavity, no board insulation, siding finish, wood studs i 15611-Om-4: Wall-Basement, , framing with R-11 sill to 2050 17,771 0 2,611 2,611 floor in 2 x 4 cavity, core, no board insulation, plus I interior finish, metal studs, 4'floor depth 15B0-6sf-10: Wall-Basement, , R-6 board insulation to 1852.5 14,655 0 2,332 2,332 floor, no interior finish, 10'floor depth 16CR-38: Roof/Ceiling-Under Attic with Insulation on Attic 3826 8,555 0 4,775 4,775 Floor(also use for Knee Walls and Partition Ceilings), Vented Attic with Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or � Membrane, R-38 insulation 20P-21: Floor-Over open crawl space or garage, Passive, 24 97 0 20 20 R-21 blanket insulation, any cover 21A-20: Floor-Basement, Concrete slab, any thickness, 2 4537 10,534 0 0 0 or more feet below grade, no insulation below floor, I any floor cover, shortest side of floor slab is 20'wide I Subtotals for structure: 141,007 0 53,530 53,530 I People: 18 3,960 5,400 9,360 I Equipment: 900 1,200 2,100 � Lighting: 0 0 0 Ductwork: 0 0 0 0 Infiltration: Winter CFM: 298, Summer CFM: 148 27,313 2,953 3,627 6,580 Ventilation: Winter CFM: 200, Summer CFM: 250 18,357 4,997 6,137 11,134 Exhaust: Winter CFM: 200, Summer CFM: 200 i AED Excursion: 0 0 6,802 6,802 ; Total Building Load Totals: 186,677 12,810 76,696 89,506 I [Tot I Bui dUneSSu I CFM� 3,306 CFM Per S uare ft.: 0.294 I 9 PP Y q I Square ft. of Room Area: 11,233 Square ft. Per Ton: 1,506 Volume (ft3) of Cond. Space: 114,749 Buildin Loads Total Heating Required Including Ventilation Air: 186,677 Btuh 186.677 MBH � Total Sensible Gain: 76,696 Btuh 86 % Total Latent Gain: 12,810 Btuh 14 °/a Total Cooling Required Including Ventilation Air: 89,506 Btuh 7.46 Tons (Based On Sensible + Latent) I -_- _ _ __- -_.-__ _ -_--- Notes � Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\ ...\Stonewood-Church.rh9 Monday, November 04, 2013, 3:22 PM , , . • . � .. -- -- -- -- — — _ _. _— _ _ - - - — -- - , i _ _ _ . _ Rhvac-Resi9ential&Light Commercial HVAC Loads - � Elite Software Development,Inc. j I Pronto Heatin and AC Church Residence Eden Pra�ne, MN 55344 Pa e 4 _ __ _ _ _ - - _ _ _ _ - - _ _ _ _ _ _ _ _ _ — _ _ _ - ystem_1 Room Load Summary_ _ � -- - - - - - - - - =g = _ = _ _ _ - - - - g _ g_ _-_ - -_- � - - -- - --- --- , , ( Ht Min Run Run CI CI Min Act i, Room Area Sens Htg Duct Duct Sens Lat Clg Sys � No Name SF Btuh CFM Size Vel Btuh Btuh CFM CFM I ---Zone 1--- � 3 Main Level 3,348 52,166 698 16-6 447 29,996 2,159 1,405 1,405 � Ventilation 9,178 3,068 2,499 System 1 total 3,348 61,344 698 33,065 4,658 1,405 1,405 System 1 Main Trunk Size: 24x10 in. Velocity: 843 ft./min Loss per 100 ft.: 0.100 in.wg --- ------ - — Cooling System Summary � I I Cooling Sensible/Latent Sensible Latent Total � � Tons Split Btuh Btuh Btuh Net Required: 3.14 88% / 12% 33,065 4,658 37,722 Equipment Data Heatinq System Coolinq Svstem Type: Natural Gas Furnace Standard Air Conditioner Model: Indoor Model: Brand: Efficiency: 0 AFUE 0 SEER Sound: 0 0 Capacity: 0 Btuh 0 Btuh � Sensible Capacity: n/a 0 Btuh � Latent Capacity: n/a 0 Btuh I C:\ ...\Stonewood- Church.rh9 Monday, November 04, 2013, 3:22 PM _ _ __ __ _ - - _ _ _ _ -- - - - -- -- _ ___ __ - - _ __ Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc i Pronto Heating and AC � Church Residence, ! Eden Prairie, MN 55344 Pa e 5 _ -_ _ _ _-_- _ __ __ -_ _ _ - _ _-__ _ . -_ - - - - - - -- . : _ -_ - _ - _ . _ _ - - , System 2 Room Load Summary_ _ _ � i ( Room Area Sens Htg Duct Duct S n's Lat Clg Sys , No Name SF Btuh CFM Size Vel Btuh Btuh CFM CFM ; I __ - - - -- _- - _._- -- __ __- --- - ---Zone 1--- _- i 2 Lower Level 3,324 37,850 507 6-6 412 10,366 1,903 486 486 Zone 1 subtotal 3,324 37,850 507 10,366 1,903 486 486 ---Zone 2--- � 1 Sport Court 759 21,779 292 4-6 410 6,869 773 322 322 I Zone 2 subtotal 759 21,779 292 6,869 773 322 322 ---Zone 3--- 4 Upper Level 3,802 56,525 757 19-6 436 34,748 2,978 1,628 1,628 Zone 3 subtotal 3,802 56,525 757 34,748 2,978 1,628 1,628 I Ventilation 9,178 3,068 2,499 System 2 total 7,885 125,332 1,555 43,631 8,153 1,900 1,900 System 2 Main Trunk Size: 36x10 in. Velocity: 760 ft./min Loss per 100 ft.: 0.071 in.wg Note: Since the system is multizone, the Peak Fenestration Gain Procedure was used to determine glass sensible gains at the room and zone levels, so the sums of the zone sensible gains and airflows for cooling shown above are not intended to equal the totals at the system level. Room and zone sensible gains and cooling CFM values are for the hour in which the glass sensible gain for the zone is at its peak. Sensible gains at the system level are based on the "Average Load j Procedure + Excursion" method. _- _ I �Cooling System Summary___ � I � _ _ C Tons . Sensible/Latpnt .- SenBt�lh - . L Btuh _ _ - Btuh j Net Required: 4.32 84% / 16% 43,631 8,153 51,784 ' I Equipment Data Heatinq Svstem Coolinq Svstem � ! Type: Natural Gas Furnace Standard Air Conditioner � Model: Indoor Model: Brand: Efficiency: 0 AFUE 0 SEER ' Sound: 0 0 Capacity: 0 Btuh 0 Btuh Sensible Capacity: n/a 0 Btuh Latent Capacity: n/a 0 Btuh I �__-_-_-- - - - - _ _ -_ _ C:\ ...\Stonewood-Church.rh9 Monday, November 04, 2013, 3:22 PM DATE TIME V CITY OF ORONO C LLED IN ���I1�� � INSPECTION TIC SCHEDULED � PERMIT NO. � MP EfED ADDRESS � OWNER ELEP ONE NO - �" CONTRACTOR Q >'; DESCRIPTION �/ ' I�� ;�Q'C tL ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING �'�ECHANICAL FINAL ❑ PROGRESS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL ❑ DEMO-SITE � ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEEf YOU:_YES_NO v�, COMMENTS: a �/4s ��rS���,/nrl0 !S �a`�•s c � -T J ° - � � �J/� ('p r�'GL'��o �t5 �/'4v�l�G� � ►'1D 04,�`c�Qa r ���/l � 7�if.��� ��� ' W Q ' n 0 �r r-e r�,t`��"�i�s ���� Cv v�7�r'��pv �' � D�.�l .�i.�a�� �✓�.a.�S �a/� �i�ese �c� z � � �#�� � /ee,s�d-� l,vo✓�- ��r��1�P�2 � dLo✓✓K, s�Lt �!� W ❑WORKSATISFACTORY:PROCEED � �PROJECT COMPLEfE � ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CAIL FOR REINSPECTION TEMPORARY V BEFORECdVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR WFLL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site: Inspector. White Copyllnspector's Ffle Canary CopyfSite Notiee � � � DATE TIME J CITY OF ORONO CALLED IN 3'/b INSPECTION NOTICE u SCHEDULED � � PERMIT NO. � -�� u co , ADDRESS �� �-S � OWNER T EPHONE NO.�S - 3S�777 CONTRACTOR � � DESCRIPTION �` ��� ty ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING y ❑ FOUNDATION WATERPROOF ❑ PLUMBING FfNAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING �MECHANICAL FINAL ❑ PROGRESS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL J ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL Q OWNERICONTRACTOR TO MEET YOU:_YES_NO � c�., COMMENTS��N�V ' �s h. lt•��'�•-e � "�oZ I�'R v /S � � b 4�4 rlc'vQ �' o ' IK6r�10 �.s no� `ia�c� s � � / � 8�tr�r���ati �ar��.�es� ° -�— C A:fi�o�/ �— W - � � . n �[ . Q h��iG� r�'6^' }.tr ►�! D � rnB'�C✓ Z �� S�Gc`/'�G �'rGG � /y1B�t�iG✓ ��`f/�.� �� c9�t'I�C✓�vr �lboc� ' jG�G`� �/ /'C.-✓Ss r�dYy"Fb�ti � �i W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY (� BEFORECOVERINCa PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR WILL REfURN ❑STOP ORDEH POSTED.CALL INSPECTOR �CITATION ISSUED SPECTION REQUIRED.CALL TO ARRANGE ACCESS. C inspection 24 hours in advance. (952 j 249-46�� Own IContractor on site: Inspecto . � White Copyflnspector's Ffle Canary CopylSite Notice �/7 ✓� DATE TIME ✓ CITY OF ORONO CALLED IN � INSPECTION NOTICE SCHEDULED z:Od PERMIT NO.,�a/4�- �d�`f8' COMPLEfED ADDRESS l�o`t�S �r�'� �dLa.f' �y� OWNER TELEPHONE NO.��a` �lb'��3�� CONTRACT�R c �' >; DESCRIPTION - � � � � 0 FOOTING ❑ PLUMBING FINAL O EXCAV/GRADING/FILLING Q ❑ POURED WALL �MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING O MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT "� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL � HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNbATION/REMOVAL Q OWNERICONTRACTOR TO MEET YOU:_YES_NO y COMMENTS: L . L • �i� �`lGJD�=t-�o/t���G � a ��o .�:� o� �� oa, � o�n�. � �. � � � � �D.O�. W Q A!S �.� G ✓ �6-cs�� 4�K� '3� /�- p• � W � M'�P�S ' �i K�� �P.t '�/l�� /�e?rt�C �'�— �� � �lt GO�D2 ✓ <<KGS 4/'i!f � �a �ow�.d� a•� �c � ` lfo���w ' - _ � t C . �.,�G� /�.T Qf� •. 4r �wr � co��rt W I'�IORKSAT�ACTORn PROC`EED'y�q��[a�" ❑ PROJECT COMPLEfE Tl��4 � YO CORRECT WORK&PROCEED W��(�k. ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION ��'.`�'4��C� TEMPORARY V BEFORE CdVERiNG PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail for the next inspecti 24 hours in advance. (952) 249-4600 Owne ctor on site- Inspector. '� White Copyllnspector's Ffle Canary CopylSite Notice C�/—' ATE TIM� � CITY OF ORONO CALLED IN �02 � NOTICE SCHEDULED INSPECTION Q --�� PERMIT NO. � � ��� o COMPLETED ADDRESS �- � �- OWNER TELEPHONE NO. / CONTRACT�R , n �: DESCRIPTION /�l� - C� L'��� ��st � lu ❑ FOOTtNG ❑ PLUMBING FINAL � EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS � Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HAFD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERlCONTFiACTOR TO MEET YOU:�ES_NO c�., COMMENTS: � W a � � O �. � O � W � Q � 2 W � W � j W WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � ❑ ORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECWERING PEFiMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours' advance. ( 52 249-46�� , OwnerlContractor on site: Inspector. - White Copyllnspector's Ffle Canary CopylSite Notice ✓ TE ME CITY OF ORONO CALLED IN � t INSPECTION OT��. �1��` scHe�u�eo ` PERMIT NO. � V COMPLETED ADDRESS_���5 �_�d OWNER TELEPHONE NO.���� �31� CONTRACTOR ro+'�� ��"SI � DESCRIPTION �Z �`� ��-• G I � � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL HANICAL R ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP � - AL ❑ SEPTIC INSTALL ❑ HARD C VER REMOVAL ❑ SEPTIC FINAL � ❑ FOUNDA EMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO � c�., COMMENTS: � a ' j r . O � � 0 � W � Q � 2 W � W � � d W ❑WORKSATISFACTORY:PROCEED ❑ PROJEC COMPLETE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECWERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952 0� OwnerlContractor on site: Inspector_ White Copyllnspector's File C ary C pylSfte Notice