HomeMy WebLinkAbout2015-00320 - water softner ' CITY OF ORONO
2750 KELLEY PARKWAY * z 0 1 5 - 0 0 � 2 0 *
DATE ISSUED: 03/18/2015
ORONO, MN 55356-
(952) 249-4600 FAX: (952 249-4616
ADDRESS : 1645 BOHNS POINT RD
PIN : ]7-117-23-11-0007
LEGAL DESC : REG. LAND SURVEY NO.0565
: LOT 000 BLOCK 000
PERMIT TYPE : PLUMBING(>$500)
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : WATER SOFTNER
NOTE: WA"I'ER SOFTENER
VALUATION OF PLUMBING 750
APPLICANT PLUMBING FIXTURE FEE 50.00
STATE SURCHARGE PLBG(VALUATION) 0.38
RICHARD'S CUSTOM WATER TOTAL 50.38
6121 EXCELSIOR BLVD.#206
ST. LOUIS PARK, MN 55416- Payment(s)
CHECK 13506 50.38
(952)920-1200
Minnesota State License#: BUIL-WM061456
OWIYER
CHURCH,JOHN& KLERISSA
1645 BOHNS PT RD
WAYZATA, MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according[o
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specitied herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permi[may be
revoked at any t � for due cause.
� � / �
�/�� ��L/ =� ��'/, � (.�_ � i /�'i /5
�
Applicant Permitee Signature Date Issued Signature Date
' � FOR CTTY USE ONLY
� �O ,� `O City of Orono
1 V P.O.Box 66 Date Received: Permit#
2750 Kelley Parkway
Crystal Bay,MN 55323 Approved By: Amount$:
(952)249-4600—Main
(952)249-4616—Fax
y�' �` CITY OF ORONO—PLUMBING PERMIT
��k�SHo��' (All Commercial Permits Must be Approved by the State Priar to City Approval)
htt :Uvv�i�w.clli.mn. av/CCLD/PDF/ e lumb lanreva . df
GENERAL INFORMATION
1. You may apply for plumbing permits by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within two working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT
VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE
PERMIT CARD IS POSTED ON THE JOB SITE.
3. Plumbing permits may be issued ONLY to licensed plumbing contractors and to property owners
residing in the dwelling.
4. When any new construction or remodeling is involved, a separate building permit must be
obtained.
5. All work must be done in accordance with State Code requirements.
6. All work must be inspected and air tested before it is covered. Call(952)249-4600.
(24-48 hour notice required)
TYPE OF PERMIT
(Check All That Apply)
�sidential ❑Commercial(Approval Required)
❑ New ❑Additional ❑ Repairs ❑ Replace
❑ In Accessory Structure?
*You will need arior anproval and may need CUP. (Per Orono City Code,Chapter 78,Article IV)
Job Site/ Owner Information:
�� � s� � �
Site Address: �D/✓.� � %✓a/� d'� �
�c �
Owner: �J �/��J �/l��l��`� Mailing Address:
City: ���� G"`/�
Zip:
Home Phone: Alternate Phone:
Contractor Information:
/lti/�' � C--' ��Ti�lra'- �('
Contractor: " ,w� �'5��; Contact Person: -
Address: �a l,�l �XC'l'JL.��G�1 /�.% �� State Bond #:
City: �i'���� Zip:J�f�I�� Expiration Date:
Phone: �')�� `���fZ�'�� Alternate Phone:
❑ Insurance— Current:
1
� .
c
PLUMBING FIXTURES BEING INSTALLED
FIXTURE BSMT 1 2 OTHER FIXTURE BSMT 1 2 OTHER
TYPE FL FL TYPE FL FL
Water Closet Floor Drains
Lavatory Sewer Ejector
Bathtub Laundry Tray
Shower Washer
Kitchen Sink Water Heater
Disposal Water Softener �
Dishwasher Wet Bar
Sillcocks Miscellaneous
PERMIT FEE CALCULATION(S)
BASED OFF - 2002 STATE STATUE
� Yes,this section applies
The replacement of only one Residential fixture or appliance that meets all three of the following
requirements:
l. Does not require modification to electrical or gas service.
2. Has a total cost of$500.00 or less; excludin�the cost of the fixture or appliance: and
3. Is improved, installed or replaced by the homeowner or licensed plumbing contractor.
Skip next section, if this applies; Cost of Permit $ 15.00
State Surcharge $ 5.00
Mail-In Fee(If Applicable) $ 2.00
Total Permit Fee $
(Permit Fees Continued On Next Page)
2
,
. �
,
PERM�`I'FEE CALCULATION S —JOBS OVER$500,00
If above does not apply; follow guidelines below:
1. CONTRACT PRICE * is 1.25%of contract price with a(Minimum Fee of$50.00)
-� �� . b
/ � U x .0125 $
(contract price) (minimum$50.00)
2. STATESURCHARGE
x .0005 $
(contract price)
3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00
4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $
• * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the
permitted work including materials, labor, profit, and other fixed costs. It is the amount to be charged
to the customer for the work done. If any material, equipment, labor or installations are furnished by
the owner, tenant or any other party, the reasonable market value of such items must be added to the
estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the
amount of the job cost, the City may request the submission of a signed copy of the actual contract.
PLUMBING PERMIT APPLICATION AGREEMENT
The undersigned hereby applies to the City for issuance of a Plumbing Permit, agrees to do all
work in strict accordance with the ardinances of the City and the regulations of the State of
Minnesota, and certifies that all statements made on this application are complete, true and
correct.
/ �
Applicant's Signature: � � Date:
�' ��i -�
/
3
DAT � TIME �
CITY OF ORONO CALLED IN ' �
INSPECTION NOTI E � sc ULED �
PERMIT NO. � c � o
ADDRESS /
OWNER TELEP/'H�O E N . — ��'��
CONTRACTO M w�r
� DESCRIPTION �
�
tl� ❑ FOOTING ❑ DE O F L EPTIC FINAL
Q ❑ POURED WALL ❑ PL ING RI ❑ EXCAV/GRADING/FILLING
y ❑ FOUNDATION WATERPROOF LUMBING FINAL
❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ ECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUI�T-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL
2 OWNERICONTRACTOR TO MEET YOU:_YES_NO
c�.� COMMENTS:
�
W
a
�
�
O
�.
�
O
�
W
�
Q
�
2
W
�
W
�
�
J
d
W� ❑WORKSATISFACTORY:PROCEED �I7 PROJECTCOMPLEfE
�
W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERT�FICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECWERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in�a�► ce. � ) 249-46�0
OwnerlContractor on site:
inspector.
White Copyllnspector's File Canary CopylSfte Notice