HomeMy WebLinkAbout2001-P04384 - air conditioning CITY OF ORONO PERMIT
2750 Kelley Parkway - PO Box 66 Permit Number: Po43g4
Crystal Eay, Minnesota 55323 Permit Type: Mechanical Permits
(952) 249-4600 Date Issued: 9i21�2o01
SITE ADDRESS: 2345 Blaine Avenue(Well No. 3 Pumphous
Wayzata,MN 55391
PID: 17-117-23-34-0011
DESCRIPTION:
Proposed Use:
Permit Class: General
Permit Type: Mechanical Permits Permit Sub-type(s): Air Conditioning
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
FEE SUMMARY: Permit Fee: $ 110.50 Valuation: $ 8,840.00
State Surcharge Fee: $ 4.42
Misc. Fee: $ 1.50
TOTAL FEE: $ l 16.42
APPLICANT; Gilbert Mechanical Contractors Inc. QWNER: Village of Orono(Well No. 3 Pumphouse)
4451 West 76th Street P.O. Box 66
Edina, MN 55435 Crystal Bay,MN 55323
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVENIENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
)
���/� � f ��t �
��- � �_ L%�. `' � G� <��'�'�
APPLICANT PERMITEE SIGNATURE ISSUEDBYSIGNATURE
Copies: 1-File(Signitures Reauired), 1-Applicant, 1-Monthlv Reoorts, 1-Assessine. 1-Finance Page 1
Page 1 of 3
.
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT ,���
BOX 66(2750 KELLEY PARKWAY),CRYSTAL BAY,MN 55323 ;,: � I �GO�
GENERAL INFORMATION � , t%r :.:,;4s::��y:
1. You may apply for mechanical permits by mail or in person at the City of�ces. Applications will be reviewed and a
permit will be issued within 2 working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU
RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE.
3. Mechanical_Designs - Complete calculations, details and specifications are required for each heating, ventilation,
humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design
temperatures, equipment ratings and identifica�ion as to type, manufacturer and model. Data shall be presented�n form
provided. Identification of and specifications for water heating equipment shall also be provided.
4. When any new construction or remodeling is involved, a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements.
6. All work must be inspected(rough-in and final). Call (952) 249-4600. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification.
INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call (952) 249-4600.
Please ck one: New Addition Repair�Replace Residential Commercial
JOB SITE:��� ����L.� "b� �"�t.'-�_ Zip: j ,
Owner's Name: ���� �l�,rn L�! ���CQ.f�� Telephone Number:
.^
Mailing Address;��� ��Q�,�� �U�„ City: �_��;�� �������� Zip:
'/ n ,
Contractor's Name:�-L-��- �C ��C� , Telephone Number:`"I�2 ��3S —3�"�(�
� _��
Mailing Address:��`�� � �' 7�{��_�, City: �Et.f.2 p: J ,j�
_ ti.Q_ Zi J
SYSTEM DESCRIPTION
HEATING SYSTEM5
Quantiry: �
Make:
Model:
Fuel:
Flue Size:
Input BTUs:
http://www.ci.orono.mn.ushnechanical%20pennit.html 9/19/2001
Page 2 of 3
,
Output BTUs:
CFM:
COOLING SYSTEMS
w/�� `w
hr/�r �L' �c v�-��....,,zf„
Quantity: Z
Make: G/-�/2izri-2
Mode1: 5U/�,1 vU�
Tons: S TUN
H. Power
FIREPLACES N�J/�/�
Gas factory fireplace
Wood burning factory fireplace with flue
Wood Stove
Wood stove with flue
Brand Name Model No.
VENTILATION NUN'�
No. Kitchen E�aust ducted recirculating cfm
No. Bath Exhaust (must be ducted outside) cfm
No. Other Fans: Locations cfm
FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL)
Installation Removal
Fuel oil: gallons underground inside outside
LP Gas: gallons
Other Gas opening
PERMIT FEE CALCULATION
1. 1.25% of Contract P_rice* or Minimum_Fee 35.00
http://www.ci.orono.mn.ushnechanical%20permit.html 9/19/2001
Page 3 of 3
, � (� �,�,
• (Contract Price) O ��� '— x .0125 $ ����'��
2. State Surcharge. ** Add the State Building Code Division
Surcharge to each permit. (Contract Price) �v���U � x .0005 $ �`� Z or$.SO
3. Postage and Handling (Only mail-in applications) $ 1.50 / 'v
� Z
4. TOTAL PERMIT FEE (Add lines 1-3 above) $ ���'
* CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work
including materials, labor, pro�t, and other fixed costs. It is the amount to be charged to the customer for the work
done. If any material, equipment, labor, or installation are furnished by the owner, tenant or any other party the
reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In
the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of
the actual contract.
** The STATE SURCHARGE is .0005 of the contract price under $1,000,000 or $.50- whichever is greater. For
valuations over $1,000,000 call the Department of Inspectional Services for the price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict
accordance with the ordinances of the City and the regulations of the Minnesota State Building Code, and certifies that
all statements made on this application are complete, true and correct.
Applicant's Signature: � � �-�j�--- Date: 9 / �/
!d �'�! L rrtr�
Approved By: Date:
http://www.ci.arono.mn.us/mechanical%20permit.html 9/19/2001
�'/_�TE TIME
CITY OF ORONO CALLED IN �
INSPECTIO�OT CE ' SCHEDULED � I ' '�
PERMIT N0. -3 � COMPLET D , v
ADDRESS Z3`+5 � �'
OWNER CONTR ��5�� �-Q�
TELEPHONE NO. � �— /Q _ S , �L�!�ee5(o�
L
� ` c�z.e •fv �C
� DESCRIPTION '� `� � � t�
� 07 FOOTING 11 M,_HANICAL RI 18 EXCAV/GRADING/fI�LING
Q 02 FRAMING 13 MECHANICAL FINAL� ` , 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q OS FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
� 10 PLUMBING FINAL � / 36 FOUNDATION/REMOVAL
Z OWNER/CONTRACTOH TO MEET YOU:_YES✓NO
� COMMENTS:
�
W
a
� o �- �/�'�� c'� ll .-���.��,�,�.�
0
�
0
�
W
�
Q
�
z
W
�
W
�
�
d
W� ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK&PflOCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� [�GORRECT WORK,CALL FOR AEINSPECTION TEMPORARY
V ��F�EFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
�"�JSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
( .�
Cail for the next inspection 24 hours in advance. �952� 249-46QQ
Own�erlContra on site:
Inspector. --�"
White Copyllnspector's Ffle Canary CopylSite Notfce
�
DATE TIME
CITY OF ORONO CALLED IN
INSPECTIONNOTIC /�� SCHEDULED ��i ✓ :30F'.�J
PERMITNO. ��7,J� COMPLETED ��� ��
ADDRESS ,��5 Gci� �'�"v�
OWNER CONTR.�'�r���-Cd'� �� .
TELEPHONE NO. � �a �O ,—�����
� DESCRIPTION /I V. � ��� i—i �L�
� 01 FOOTING � 11 MECHANICAL RI 18 EXCA�//GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q OS FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINA 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES�NO
� COMMENTS:
�
W
o.
�
�
O
�
�
O
�
W
�
Q
�
2
W
�
W
�
�
d
W� �-N(ORKSATISFACTORY:PROCEED �pROJECTCOMPLEfE
W j❑CORRECT WORK&PROCEED u ISSUE CERTIFICATE OF OCCUPANCY
0� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN
INSPECTOR WILL FiETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
�INSPECTION REOUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (g52) 249-4600
OwnerlCo �tor on site:
Inspector � � S
White Copyllnspector's File Canary CopylSite Notice