My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Email From Chris Mattson - Dated 04-15-16
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
3348 Bayside Road - 05-117-23-14-0064 - New PID
>
Correspondence
>
Email From Chris Mattson - Dated 04-15-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:18:48 PM
Creation date
4/15/2016 4:13:51 PM
Metadata
Fields
Template:
x Address Old
House Number
3348
Street Name
Bayside
Street Type
Road
Address
3348 Bayside Rd
Document Type
Correspondence
PIN
0511723140064
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b - � <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Friday, April 15, 2016 3:17 PM <br /> To: 'Travis Van Neste' <br /> Cc: Jeremey Hill; Melanie Curtis <br /> Subject: RE: 3348 Bayside Road <br /> Attachments: Hardcover Information Packet -2014.pdf; Survey Requirements - August 2015.pdf <br /> Travis, <br /> Attached is a copy of the City's survey requirements. The initial survey requires the existing and proposed topography to <br /> be shown. The as-built survey requires as-built topography to be shown. <br /> The property is located in Tier 1 of the Stormwater Quality Overlay District where 25%of the gross area of the lot is <br /> permitted to be covered with hardcover. Attached is our information packet on hardcover. The hardcover calculations <br /> are to be prepared by a registered land surveyor. <br /> Additionally, a protected tributary runs along the northern property line. According to Citv Code Section 78-1211 for <br /> watercourses,the ordinary high water level (OHWL) is the elevation of the top of the bank of the channel. Please show <br /> the OHWL on the survey as well as the 75' setback from the OHWL. <br /> If you have any additional questions, please don't hesitate to contact us. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono E MN ; 55356(physical addressJ <br /> PO Box 66 ; Crystal Bay � MN ; 55323-0066 (mailing addressJ <br /> '8' 952.249.4620 � 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us '� � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> From:vannestesurveying@gmail.com [mailto:vannestesurveying@gmail.com] On Behalf Of Travis Van Neste <br /> Sent: Friday, April 15, 2016 7:29 AM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us>; Melanie Curtis<MCurtis@ci.orono.mn.us> <br /> Cc:Jeremey Hill <jeremeyhill@yahoo.com> <br /> Subject: Fwd: Orono land survey <br /> I am being asked to provide a survey for this client and I want to make sure my quote is including everything <br /> needed for the city of Orono. I guess my biggest question is does the City require full topo coverage for a <br /> detached garage in this situation? Also, I have been told that there is a 75 foot setback from the creek... first of <br /> all, is that correct... then, where is the 75 measured from? edge of the water? A certain contour line? or a <br /> delineated wetland line? <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.