HomeMy WebLinkAbout2000-P02923 - re-roof PERMIT
C I TY O F �RO N O Permit Number:
2750 Kelley Parkway - PO Box 66 P02923
Crystal Bay, Minnesota 55323 Permit Type: 1vlinorAlterations
(612) 249-4600 Date Issued: 9i�i2000
SITE ADDRESS: 109 Chevy Chase Dr
WAYZATA,MN 55391
P��: 36-118-23-41-0010
DESCRIPTION:
Proposed Use:
Permit Class: Building Census Code 434
Permit Type: Minor Alterations Permit Sub-type(s): Building Re-Roof
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
FEE SUMMARY: Permit Fee: $ 111.25 Valuation: $ 4,190.00
State Surcharge Fee: $ 2.10
TOTAL FEE: $ 113.35
APPLICANT: MICHAEL REMER CONSTRUCTION OWNER: H E ARNOLDY ETAL
1651 COUNTY RD 4 SW 109 CHEVY CHASE DR
COKATO,MN 55321 WAYZATA MN 55391
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND
STATE OF MINNESOTA BUILDING CODE REQUIREMENTS.
i
�'��/�I /��1� � ,�,
/vG � - i _ t_,<.' ',1'' ;'�;`�_G
APPLICANT PERMITEE IG1 ATURE IS LJE Y SIGNATiJRE �
Copies:City,Applicant,Assessor,Finance Page 1
Total Fee: $ Date Received: �J—"� 'L C
Entered By: �%�;i Permit#: f��>_��/.����,
CITY OF ORONO - BUILDING PERMIT APPLICATION
All information must be submitted in full before plan review will be started.
(please print all information)
------------------------------------------------------------------------------------� ------------------------------
THE APPLICANT IS: (circle one) OWNER O CONTRACTOR
JOB SITE ADDRESS: � �� � G f��U� G����� IC�Y� ZIP: 5 ��� �
NAME OF OWNER: ���v j,.� /�I�'�"J��l-l� �-' PHONE: (home)
(work)
MAILING ADDRESS: �����'r��i CITY: �,���7'{� ZIP: 5'S' �
CONTRACTOR: �Yl �1{� ,/��rt�1,�r� PHONE: 3zC� "'i-�'L �c�'��---
CONTACT PERSON: �'!1t'J��- /=��J�.� MOBILE/PAGER:
MAILING ADDRESS: ���; ) C� � H `�t1J CITY: Gv ���T�� ZIP: ,j� �- I
STATE LICENSE: # ZC;C;ci��)k'x
ARCHITECT/ENGINEER: PHONE:
MAILING ADDRESS: CITY: ZIP:
NAME; REGISTRATION#
TYPE OF WORK: New Addition / Accessory Structure
Move Remodel/Alteration ✓ Land Alteration
PROPOSED WORK(describe in detain: lj'��C�c�� ��C�(,�q�� _
STORIES: � SQ. FEET OF EACH FLOOR:
NO. OF BEDROOMS: GARAGE STALLS: ATT. DET.
c���
ESTIlVIATED CONSTRUCTION VALUATION (excluding land): $ ��� v
I hereby apply for a building permit and I acknowledge that the information above is complete and
accurate; that the work will be in conformance with the ordinances and codes of the City and with
the State Building Code; that I understand this is not a permit and work is not to start without a
permit; and that the work will be in accordance with the approved plan.
APPLICANT'S SIGNATURE: �1�►'�,0,�1 /�� DATE: �7 U t�
NOTE! Parade of Homes events require separate permit approval by Police Department and
City Council 60 days prior to the event. Non permitted events will not be allowed.
5
Sec.13.04 RIGHTS OF SUBJECTS OF DATA �
Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section.
Subd.2. Inforcnation required to be given individual. An individual asked to suppty private or confidential data concerning himself
shall be informed of: (a)the purpose and intended use of the requested data within the collecting state agency,political subdivision, or statewide
system;(b)whether he may refuse or is leeally required to supply the requested data;(c)any known consequence arising from his supplying or
refusing ro supply private or confidential dara;and(d)the identity of other persons or entities authorized by state or federal law to receive the data.
This requirement shall not apply when an individual is asked ro supply investigative data, pursuant ro section 13.82, subdivision 5, to a law
enforcement officer.
The commissioner of revenue mav olace the norice required under this subdivision in the individual income tax or orooertv tax refund
instructions instead of on those forms.
Subd. 3. Access to data by individual. Upon request to a responsible authoriry,an individual shall be infortned whether he is the
subject of stored data on individuals, and whe[her it is classified as public,private or confidential. Upon his further request,an individual who
is the subject of stored private or public data on individuals shall be shown the data without any charge to him and, if he desires, shall be informed
of the content and meaning of that data. After an individual has been shown the private data and informed of its meaning, the data need not be
disclosed to him for six mon[hs thereafrer unless a dispute or action pursuant ro this section is pending or additional data on the individual has been
collected or created. 'I'he responsible authority shall provide copies of the private or public data upon request by the individual subject of the data.
The responsible authority may require the requesting person to pay the actual costs of making,certifying,and compiling the copies.
The responsible authoriry sha(l comply immediately,if possible,with any request made pursuant to this subdivision,or within five days
of the date of the request,excluding Saturdays,Sundays and legal holidays, if immediate compliance is not possible. If he cannot comply with
the request within that time, he shall so inform the individual, and may have an additional five days within which to comply with the request,
excluding Saturdays, Sundays and legal holidays.
Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of pub(ic or
private data concemine himself. To exercise this right, an individual shall notify in writing the responsible authoriry describing the nature of the
disagreement. The responsible authority shall within 30 days either: (a)correct the data found ro be inaccurate or incomplete and attempt to notify
past recipienn of inaccurate or incomplete data,including recipients named by the individual;or(b)notify the individual that he believes the data
to be correct. Data in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data.
The detemunadon of the responsible authoriry may be appealed pursuant to[he provisions of the administrative procedure act relatin�
to contested cases.
DATA PRNACY ADVISORY
In accordance with M.S. 13.04, Subd. 2, "Rights of subjects of data", we would like to inform you that your
request for a permit or license from the City of Orono or any of its departments may require you to furnish certain
private or confidential information.
You are notified that:
1. The information you furnish will be used to determine your qualification for the permit or license
requested.
2. You may refuse to supply data, but refusal may require that the City deny the permit or license.
3. The information may be shared with other local, state or federal agencies to the extent necessary to
process the permit or license.
4. If your requested permit or license requires Council action to approve, some information may become
public.
5. You have certain rights under M.S. 13.04 (available upon request) to review private data on yourself.
6. Your full name is required to process this application or permit.
�^��� �� ��
First Middle Last
I�� �� c�c� /�.r y �5��
Address �,�� 5
��y !<� 7'�' /►'t U`� �5��l 3��> -��� ' �-
Ci�, State Zip Phone
I understand my rights as stated above.
�.P � i
Si nature
6
• CHECK OFF LIST FOR I5SUANCE OF PERMITS
� FOR OFFICE USE ONLY
ADDRESS OR LEGAL:
PID:
DESCRIPTION OF WORK:
------------------------------------------------------------------------------------------------------------------------
ZONING REVIEW BY: DATE APPROVED:
BUILDING REVIEW BY: DATE APPROVED:
------------------------------------------------------------------------------------------------------------------------
FEES TO BE CHARGED: Misc. Fees Calculated By:
PERMIT Yes No
PLAN REVIEW Yes No SEWER CONNECTION
STATE SURCHARGE Yes No WATERCONNECTION
INVESTIGATION FEE Yes No PARK FEE
SAC Yes No SITEINSPECTION
Number of SAC Units OTHER (specify)
------------------------------------------------------------------------------------------------------------------------
ZONING CHECK LIST Zoning District:
Fire Department: Post Office: School District:
Lot Area: Sq.ft. Acres Width Depth
Survey Submitted: Yes No Date of Survey:
Proposed Setbacks:
Front (Lake): Right Side:
Rear (Street): Left Side:
Adjacent Structures: Wetland:
Building Height: Def. Hgt. Peal:Hgt.
Lot Coverage:
Grading: Staff Approval Date: By: Council Approval Date:
Septic: Staff Approval Date: By:
Zoning File: # Resolution: # Resolution Date:
Shoreland District:
Avg. Setback: Bluff Setback: Lot Coverage:
Existing Proposed
Hardcover: 0-75'
75-250'
250-500'
500-1000'
Hardcover Variance Required: Yes No Date of Council Approval:
REMARKS (in house):
7
BUILDING REVIEW CHECK LIST
UBC: CONSTRUCTION TYPE:
Sq Footage $ Per Sq Ftg
Basement x =
lst Floor x =
2nd Floor x =
Garage x =
x =
TOTAL
Estimated Construction Value: $
Inspections Required: Work Requiring Separate Permits:
Site Plumbing Fire
Hardcover Removal Mechanical Water Connection
Footing Septic Sewer Connection
Framing Fireplace Lawn Irrigation
Insulation (Masonry) Other
Wall Board (Mfg.) Well (State Permit)
Final Grading/Filling Electrical (State Permit)
Other
REMARKS(IN HOUSE):
------------------------------------------------------------------------------------------------------------------------
REVIEW BY OTHERS: DATE:
Access: Existing New
Access Approval: Date By:
------------------------------------------------------------------------------------------------------------------------
REMARKS (TO BE NOTED ON PERMIT):
8
� .
' BUILDING PERMIT APPLICATION PROCEDURE
Each application for a building pernut shall be accompanied by the data indicated below. Failure
to submit complete information will result in return of applications. Please read carefully the
listed rec�uirements.
' 1. ALL APPLICATIONS
A. Completed application forms including all information required in the numbered spaces,
dated and signed by applicant.
B. Two copies of building plans, drawn to scale, together with specifications containing the
minimum information noted below: (requirement for building plans may,be waived by the
Building Official for small structures or minor work). One set will remain on file with the
City and one set will be returned to applicant.
Residential Plan reviews will require a minimum of 7 to 10 working days for staff review.
All new commercial structures must be approved by the Orono Council. Modification of
existing commercial structures will require a minunum of 2 weeks for staff review.
Minimum Information Required:
1. CERTIFICATE OF SURVEY (signed by a registered land surveyor). A survey
is required for all types of construction including new homes, room additions,
porches, decks and accessory buildings. The survey must include the legal
description of property, location of existing and proposed structures on the site,
location of all proposed improvements such as driveways, retaining walls, decks,
sidewalks, etc. Lakeshore lots must show existing and proposed contours in
minimum 2' increments. (Minimum survey standards handout available at City
offices.)
Survey Requirement Exemption - A survey will not be required for detached
accessorv structures of less than 1,000 s.f. in total floor area when all of the
following conditions are met:*
a) The area of the property exceeds the minimum lot width/lot area standards
of the zoning district.
b) Owner/applicant has staked the location of the proposed structure meeting
the required setbacks, and the property corner pins are staked and visible
and a plot map of the property drawn to scale has been submitted.
c) Owner/applicant has obtained written non-objection of most-affected
adjacent property owner.
*A survey will not be required for accessory structures without foundations and
with less than 120 s.f. of projected roof area if b and c are met.
A site inspection by City staff is required. Site inspection fee is $30.00 and shall
be paid with the building permit.
1
. �
2. Gradin��and Drainage Plans - where any changes in grade or drainage are
proposed as a result of the construction, a grading and drainage plan must be
submitted showing existing and proposed contours or grades. Required for all
projects.
3. Floor Plans -each floor or level including basement or foundation, decks, porches,
garage or carport. Size, spacing, and direction of floor and ceiling framing
members, girders, beams, columns and piers. Location and size of all windows
and doors including manufacturers identification and documentation of window and
door infiltration test data. Location and size of all permanently installed cabinets,
plumbing fixtures, heating, ventilation and air conditioning equipment.
4. Exterior Elevations - all sides of building showing windows, doors, finished
grades, exterior finish, depth of footings, foundation walls, piers, finished floor
elevations and type of materials.
5. Details and Sections - a minimum of one section detail through exterior wall for
each type of construction proposed, showing materials and dimensions of each
member from footing to the highest point of the roof. Details including
calculations and stress diagrams together with manufacturers specifications are
required for all trusses. Fireplaces, if proposed, must be detailed in plan and cross
section. Details and calculations are required for each critical construction detail
including beams, overhanging or cantilevered joists, stairways, balconies, or other
unique structural features. Provide window and door schedules, shop drawings of
sky lights, and manufactured stairways.
6. Information and Calculations - pertaining to thermal transmittance values and
resistance values of each proposed material are required and may be shown either
on plans or in specifications (energy calculation forms available at City offices).
7. Mechanical Designs - complete calculations, details and specifications are required
for each heating, ventilation, humidification-dehumidification, and air conditioning
installation including heat loss/heat gain calculation, design temperatures,
equipment ratings and identification as to type, manufacturer and model. Data
shall be presented on form provided. Identification of and specifications for water
heating equipment shall also be provided.
8. Snecifications - required for commercial/industrial, residential if applicable) may
be separate or part of drawings and shall include description of materials to be
used, identified as to grade, species, type, manufacturer, and conditions of use.
If not included on plan, specifications shall include detailed thermal transmittance
calculations together with supporting data used in computation.
2
9. All applications for structures which require driveway access or involve a change
in use of an existing access to a County highway or City road, must be
accompanied by an access permit issued by the Hennepin County Highway
Department or Orono Public Works Department.
10. For projects which will require the installation of an on-site sewage treatment
system, a site evaluation report and system design must be submitted with the
building permit application. (See On-Site Systems Manager far more information.)
11. For all projects located within 1,000' of lakeshore, shoreland regulations and
hardcover limitations apply. Hardcover, by defuution, is any structure, blacktop,
or other material which interferes to any degree with the direct absorption of
rainfall into the ground. Hardcover calculations must accompany each application
involving additional or replacement proposed hardcover in the affected zoning
districts. (See "Hardcover Worksheet" available at City offices.)
C. One set of building plans and specifications noted with corrections or code compliance date
and stamped as approved by the Building Official will be returned with the permit. This
a��roved co�y must be ke�t on the individual job site, available to inspection personnel
throu�hout the construction.
D. A Certificate of Occupancy is required prior to the use or occupancy of any new structure
erected within the City. This certificate will be issued by the Building Official at such
time as final inspections demonstrate that code compliance has been achieved. Final
inspections are required for all existing structures altered or changed in use. Changes in
t}le use of the commercial structure must also be approved by the Zoning Department.
E. Time of Construction. Section 12.05
Subd. 1. Permit Expiration. Notwithstanding continuing or on-going work, any
building permit issued by the Ciry shall expire and by lunitation be null and
void and shall require issuance of a new permit and payment of a full new
permit fee if a Certificate of Occupancy and final completion has not been
issued within the following lenath of time after the date of permit issuance,
which new permit and fee shall be necessary to reimburse the City for on-
going and more than normal number and cost of inspection services.
A. Single Family Residential dwellings, including new construction,
remodeling or additions: 24 months.
3
B. Accessory Buildings on Single Family Residential properties: 12
months.
C. All Multi-Family and Non-Residential construction: 24 months
except when a longer time is authorized by the Council at the time
the original permit is issued.
Subd. 2. Exterior Work. Notwithstanding continuing or on-going work nor issuance
of new or extended permits, all exterior work shall be expeditiously
brought to completion to protect adjoining and nearby properties as
follows:
A. No land shall remain disturbed and exposed without established
grass or other ground cover for a period exceeding 12 months, or
any lesser period as may be specified in the permit.
B. All exterior construction including siding, roofing, doors, windows
and finish shall be completed and present a finished appearance
within 12 months of the start of construction.
NOTE: Permit applications for projects for which a variance has been approved must be
submitted within one year of the date of variance approval, and permit must be obtained
no more than 6 months after date of permit application in order that variance remains in
effect.
IDENTIFICATION OF PREMISES REQUIRED
Approved addresses shall be displayed, plainly visible and legible from the street fronting the
property.
4
BUILDING PERMIT APPLICATION
CITY OF ORONO
On the North Shore of Lake Minnetonka
2750 Kelley Parkway
Post Office Box 66
Crystal Bay, MN 55323
(612)249-4600
BUILDING & ZONING
DEPARTMENT
LYLE OMAN
Building Official
INSPECTIONS: OFFICE HOURS:
CALL SECRETARY - MONDAY-FRIDAY
GIVE 24 HOUR NOTICE 8:00 AM - 4:30 PM
INDEX: Pa�e
Application Procedures and Survey Requirements . . . . . . . . . . . 1-4
Application Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Data Privacy Advisory . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Check-Off List (office use only) . . . . . . . . . . . . . . . . . . . . . . 7-8
REVIEW & PROVIDE ALL INFORMATION REQUESTED TO AVOID DELAY
DATE TIME
CITY OF ORONO CALLED IN �—��� �� 3�
INSPECTION NOTICE SCHEDULED � "� �
PERMIT NO. ��� �� COMPLETED �� - � v� �.� 3!�
ADDRESS �C�� C�l/��C'V(,��
OWNER CONTR. �-�.✓ �-�'1St•
TELEPHONE N0. � � Z �= ��`��I �� C�'L'-3`'�'��
� DESCRIPTION 42csz�
ly� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVA�
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q INAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
�
J
O
a
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
W� �✓VORKSATISFACTORY:PROCEED �y(pROJECTCOMPLETE
W �C7 CORRECT WORK 8 PROCEED L"ISSUE CERTIFICATE OF OCCUPANCY
0 ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. . pHOTO TAKEN
INSPECTOR WILL RETURN
C;STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. 249-46��
OwnerlContr tor on ite;.
tnspector. ����
White Copyllnspector's File Canary CopylSite Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED ��-
PERMIT NO. '.'��'2-�3 COMPLETED '���v '�U
ADDRESS T� C�J(-I G'Ii1Q�C_ �✓, •
OWN ER CONTR.
TELEPHONE NO.
� DESCRIPTION ' ? L��
lV 01 FOOTING 11 MECHANICAL RI 1 XCAV/GRADING/FILLING
02 FRAMING�� 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
� 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Z
Q O5 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DtMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
Q
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
Q OWNERICONTRACTOR TO MEET YOU:_YES_NO
Z
� COMMENTS:
�
w
�
� � �uL��
0
�
�
0
�
W
�
Q
�
Z
W
�
W
�
j Q�^
d Q�,WORK SATISFACTORY:PROCEED �' PROJECT COMPLETE
W
� �,CORRECT WORK&PROCEED f; ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECT 11NSAFE CONDITION WITHIN HOURS. - pHOTO TAKEN
INSPECTOR WILL RETURN _
❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED
i� INSPECTIONREQUIRED.CALLTOARRANGEACCESS.
Call for the next inspection 24 hours in advance. 249-460�
OwnerlContra tor on site:
Inspector./��.G�C�
White Copyllnspector's File Canary CopylSite Notice