Loading...
HomeMy WebLinkAboutcompliancve certificate w t er��r��� y �l���t�- �� o�t ar� � Compliance Certificate Project Title: New Construction-Orono Report Date:03/21/07 Energy Code: 2000 Minnesota Energy Code Location: Hennepin County,Minnesota Construction Type: Single Family Glazing Area Percentage: 18% Climate Zone: 2 Construction Site: Owner/Agent: Designer/Contractor: 1470 CHERRY PLACE SUISSE BUILDERS MIKE CRAFT ORONO, Minnesota 55364 1470 CHERRY PLACE RAUSCHER AND ROBICHAUD Permit#N.A ORONO, Minnesota 55364 275 MARKET ST,STE 561 Permit Date:N.A 612-747-8050 MINNEAPOLIS,Minnesota 55405 troy.shannon@suissebuilders.com 612-339-2704 :. o . ►e � �� ��������. �'` :K � �� ��� �.,.�: �,:�: i ` �°-:�� ��s-� :�� c�� e� � � � as:, : Raised or Energy Truss: 2371 0.0 44.0 52 Wood Frame, 16in.o.c.: 4944 0.0 19.0 336 Metal,Thermal,2 Pane w/Low-E:Above-Grade,: 867 0.310 269 Solid: 29 0.310 9 Insulated Concrete Forms: 2246 26.0 74 Wall height:9.0' Depth below grade:8.0' Insulation depth:9.0' Furnace 1:Forced Hot Air(Non-Electric):92 AFUE Boiler 1:Other(Except Gas-Fired Steam):98 AFUE Air Conditioner 1:Electric Central Air: 13 SEER Compliance Statement: The proposed building design described here is consistent with the building plans,specifcations,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2000 Minnesota Energy Code requiremen Scheck-Web and to comply�ith the mandatory requirements listed in the REScheck Inspection Checklist. � �=� '' �� ���c,�.�i�� �s-C:�S�-�/�jJ ;='� � • � � ' �� —�. —_ - — — - --�`Name-Title Signature Date New Construction-Orono Page 1 of 3 . �en��ated ESc�i�c�� e�r ��ft�are REScheck Inspection Checklist Date:03/21/07 Plan Review and Inspection Issues This list of items may be helpful for Plan Reviewers and Building Inspectors to use as a guide for enforcing the Minnesota Energy Code. The items apply to Group R,Division 3 Occupancies,one-ard two-family residential dwellings.The items marked with'apply only to detached one-and two-family residential dwellings. Plan Review Issues Foundation Inspection: � Foundation wall insulation R-5 minimum. � Foundation insulation extends from top of wall down to top of the footing. � Exterior foundation insulation is covered by a protective coating finish. Concrete Slab or Under-Slab Inspection: � Slab on grade perimeter insulation R-5 minimum. � Slab insulation extends from top of slab to design frost line or top of footing. � Floors over unheated space R-30 minimum. Windows/Doors/Skylights: � Average U-value is 0.37 maximum for windows and glass doors(excludes foundation windows). � Window U-values consistent with building plan and REScheck Certificate. � Window and door areas consistent with building plan and REScheck Certificate. Mechanical Ventilation Issues: � Residential mechanical ventilation system provides adequate ventilation per code requirements'. � Furnace efficiency is consistent with REScheck Certificate or building plan. � Protection against excessive depressurization is installed per code requirements'. Envelope Insulation for Plan Review: � Interior basement insulation R-5 minimum(if no exterior insulation). � Ceilings with attics R-38 minimum or consistent with building plan and REScheck Certificate. � Wall framing and insulation level is consistent with building design and REScheck Certificate. Inspection Issues Concealed Insulation Framing and Sheathing: � Wind wash barrier installed at attic edge. � Exterior wall corners framed so that insulation can be installed after exterior sheathing is installed. � Intersections of interior partition walls and exterior walls framed so that insulation can be installed between the partition and exterior sheathing after exterior sheathing is installed. � Gaps between framing less than one-half inch are eliminated by securing framing together or are insulated at the time of assembly � All penetrations between conditioned and unconditioned spaces made prior to framing inspection are sealed`. Interior Air Barrier: New Construction-0rono Page 2 of 3 • � All fire stops are air sealed. , � Pipes,ducts,wires,equipment and flues and chimneys through the interior air barrier are sealed. � A sealed continuous interior air barrier is installed on the warm side of the building envelope at ceilings,walls,and floor rim joist areas'. � Air barrier behind tub and shower is sealed and protected. � Recessed light fixtures are sealed. Envelope Insulation: � Basement insulation R-5 minimum. � Wind wash barrier on wall separating house and garage is sealed. � Loose fill insulation is prevented from entering the eaves. � Insulation on skylight shafts and walls exposed in attics is supported on the unconditioned side. Attic Insulation: � Attic access panel insulated to R-38 for ceiling panel and R-19 for wall panel. � Attic card attached to framing near access opening. � Notification of attic R-value and date of installation posted near building permit inspection card. This is a summary only.Other requirements may apply.See the Minnesota Energy Code.Questions?Call the Department of Public Service Information Center at 651-296-5175 or 1-800-657-3710. New Construction-Orono Page 3 of 3