Loading...
HomeMy WebLinkAbout2014-01329 - demo , CITY OF ORONO * 2 0 1 4 - 0 1 3 z 9 * 2750 KELLEY PARKWAY DATE ISSUED: 11/25/2014 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADllRESS : 1410 CHERRY PL PIN : 08-117-23-33-0081 LEGAL DESC : CRYSTAL BAY V[EW : LOT 000 BLOCK 004 PERMIT TYPE : DEMOLITION PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : DEMO-PRINCIPAL STRUCTURE ACT[VITY : 645-SINGLE FAMILY HOUSES (ATT& DET NOTE: l. FOUNDATIONS/ALL DEMO DESRIS TO BE RF,MOVED FROM GROUND&DISPOSF,D OF OFF SITE,YER PCA RF,GULATIONS. 2. WELLS MUST'BE ABANDONED. 3. INSPECTIONS DONE BEFORE BACKFILL[NG. NOTF,: A 24-48 HOUR NOTICE[S REQUIRED FOR ALL INSPECT[ONS. CALL(952)249-4600. S�WER MUST BE DISCONTINUED AT THE C[TY SERVICE BY QUALIFIED CONTRACTOR BEFORr DGMO P1�RMIT IS [SSUED. CHGCK TO MAKE SURE 1�H(S PEItMIT HAS BEEN PULLGD BEPORG ISSU[NG TH[S P�RMIT. APPLICANT DEMOLITION- PR[NCIPAL STRUCTURE 75.00 STATE SURCHARGE DEMO 5.00 D.S.M. EXCAVATING 2916 ENTERPRISE AVE TOTAL 80.00 HASTINGS, MN 55033-� Payment(s) (651)480-1355 CREDIT CARD 0444 80.00 OWNER TORGERSON, KEVIN&TERESA 1410 CHERRY PL MOUND, MN 55364- AGREEMENT AND SWORN STATEMENT � The work for which this perniit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Quilding Code. This permit is for only the work described and does not grant perniission tbr additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or no[specitied herein."Chis permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuanc�,or if construction is suspended for a period of 180 days at any time after work has commenced. The applican[is responsible for assuring all required inspections are requested in conformance with the State Building Code.'This pennit may be revoked at any time fo due causq. . - �-/�/ �� /�. /l��$-'�� / ��� Applica Permitee Signature � Date Issu By Signature Date �O�T City of Orono FOR CITY E ONLY L' 1 y P.O.Box 66 Date Received�-- ermit D���b�� / � 2750 Kelley Parkway �y Crystal Bay, MN 55323,, Amount: $ O�� SAC Credit: (952)249-4600 r ,,a ''` Homeowner(s)Signed: ❑ Yes �E' �,� � � Resolutions(if any)Signed:�Yes ❑None Required tqkFS H p�� �{I r�I�� Zoning Disclosure Signed: ❑Yes ❑None Re uired I I CITY OF ORONO - DEMOLITION PERMIT (All permits must be approved by the Building Official and/or Zoning Department) Job Site / Owner information: Type: � Residential ❑ Commercial Site Address: /�/D C�',�j�,¢.Q y D�AC� Owner: STdiv+�y✓��, �G/�� , Mailing Address: City: __!�/1�S/Zj¢y'� Zip: Phone: Email: Contractor/Applicant Information: � �- �� j� �,�j�� Contractor/App.: ��,�',�, ��4v�N(��il,�, Contact Person: /,�i�� �a�N��iv,�i Address: a7'/G �ivi��,n2�� �, State License#: City: S`rti Zip: ���� Expiration Date: Phone: lv�l �d "���� Email: SPECIAL CONDITIONS 8� HOLD HARMLESS AGREEMENT General Instructions: 1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc. 2. Work must not begin unless the permit card is available on the job site. 3. A 24-48 hour notice is required for all inspections. Call (952) 249-4600. 4. Sewer must be discontinued at the City service by qualified contractor before demo permit is issued. Demolition by means of: ❑ Manual Disassembly [�Heavy Equipment ❑ Other / � Permit(s) Issued: ❑ Sewer Disconnection ❑ Well Abandonment# In return for issuance of said Demolition Permit, the undersigned owner hereby agrees to._ 1. Submit a survey, aerial photo or sketch showing all structures on the property. Note which structures are to be demolished. 2. Submit a survey, aerial photo or sketch showing proposed erosion control measures in accordance with Chapter 79, Construction Site Runoff Control. 3. Submit a copy of permit approval from the Minnehaha Creek+Watershed District (MCWD). The �City will not issue a demolition permit without a copy of the permit(s) from the MCWD or documentation stating permit(s) are not required. 4. Submit a $2,500 escrow and an escrow agreement signed by the property owner. 5. Keep all structure(s) enclosed and/or secured until such time as demolition is complete. 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior approval is obtained in writing for temporary use thereof. 7. Completely remove foundation(s) from the ground. 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements. 9. Abandon water wells in accordance with State Health Department regulations. 10. Call for an inspection when all debris has been removed, before backfilling. 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground elevation (except when such excavation is to be used as part of a new building and such new building is actually under construction). 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are crushed and filled. 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, employees and assigns from and against all claims, damages, losses or expenses, including attorney fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition described herein as performed by the property owner, his employees, agents, subcontractors or assigns. PERMIT TYPE AND FEE CALCULATION �$75.00 — Principal Structure $�-�, "' � � $50.00 —Accessory Structure x (how many) 1. Subtotal of above permit requested $ 2. State Surcharge 5.00 3. TOTAL PERMIT FEE (add lines 1-2 above) $ � � The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do all the work in a strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Applicant's Signature: Date: �e/�'/y Owner's Signature: � �� �d'� ' Date: Approved By: � Date: I� -�3- /`� (B i ding Official) * Zoning Disclosure Required? ❑ YES ❑ NO "This must be filled out by Zoning Department— For either answer, a Zoning Official must sign all applications. * Approved By: �/� Date: � � ' �� � � (Zoning Official) �,Q�O PRINCIPAL STRUCTURE DEMOLITlON PERMIT ZONING DISCLOSURE $ DECLARATION y� � To the property awncr: Demoli4on of the principal dwelling structure on a property may ��kESH���G automaticaily terminate certain rigMs which may have accrued to the properly by virtue of the continued existence of that building. This means you may give up some or all of the zoning rights currently associated with the prindpat structure(setbacks, hardcover, size of building,etc)with its removal. • Rebuilding on a substandard lot of record (i.e, a iot that does not meet the zoning district required lot area or width standards) may, with few excepfions, require variance appro�ral by the City Council, and such approval is nefther automatic nor guaranteed but requims that a practical difficulty be demonstrated. • Additionally, all currerrt zonfng standards will have to be met by the new principal dwelling including seti�adcs, and building footprim, hardcover(impervious surFace),&height IimitaGons,etc, • Where municipal sewer is not available, provision of two (2) oonforming on-site septic treatment sites is mandatory for a new dwelling. • Unless specifically approved by the City, all seasonal and permanent dodcs must be removad at tf�tlme of princlpal dwelling demolition. They may not be re-installed until a new prindpal dwelting has reached the framing stage. The Pollowing information is presented for the purposes of advising the property owner of the impiications of removal of ti�e rinci al dwellin on the ro e : 1, Properly Address: 1410 Cherry Plaoe PTD# 08-117-23-33-0081 2. Zoning District: LR-iB Requ(red Lot Area: 1.0 acre Required Lot Width: 140' Shoreland? /N Actual Lot Area: t0.51* Actual Lot Width: t99'* *according to nnepin County Property Records Lot area varia is is not required.** Lot width varian is not required.** **variances requir nless City Code Section 78-72{c)(1) require are met(copy attached) 3. Required Setbadcs: Front NA Rear 30' Side 10' Side Street NA Lakeshore Lot: Lake(Front) 7S' Street(Rear) 30' Average Lakeshore Setba : m m is not a licable. 4. Massing &Lot Coverage by Structures imi t 1 �/ d not a 5. Hardcover limitations: Are NOT app[Icable— r-�g appiicab . Stormwater Quality Overlay District Tier� 1)2 3 4 5 Tier 1 hardcover limit = 25%of gross lot area �/ 6.✓Munidpal sewer is available: 7, ✓Weqand(s) present at the lakeshore; a 35-foot setback is required. If the wetland is within 150 feet of the project. a wetland delineation may be required for setback determination, Minnehaha Creek Watershed District approval is required prior to issuance of perrr�its from the City of Orono. **Contact Planning Department Staif for addltlonal Ir�formation. The undersigned property owner hereby acknowledges receipt of the above information. Sta Initiafs U�Z�. /� 3 / Property ne�'s Signatu e Date (Original: Street File; Copy: Property Owner) Created: Apri12013 .. � / _ 'I �' , � C, DATE TIME' � CITY OF ORONO CALLED IN INSPECTION NQT��EU_L���,�CHEDULED -�� —��' PERMIT NO. G COMPLETED ADDRESS ���'��'� / OWNER TELEPHONE NO. �'��`7(�'J 11:�G CONTRACTOR �-, � DESCRIPTION � � l�� ��`� �� � 41 ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE SEPTIC INSTALL 2 OWNERfCONTRACTOR TO MEET YO�YES_NO c�., COMMENTS: ��� � W a 2 J O �. � O � W � Q � 2 W � W � � � d W ❑WORK SATISFACTORY:PROCEED PROJECT COMPLETE � ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECWERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pH0T0 TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR O CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advan 249-46�� OwnerlContractor on site: Inspector. White CopyRnspector's Fite Canary CopyiSite Notice � .,� ' •.'` DATE ��r TIME CITY OF ORONO CALLED IN ��_ INSPECTION NOTICE SCHEDULED � PERMIT NO.a��S���3 Z y COMPLETE ADDRESS � �� �� OWNER ELEPHONE O. �-9��! � CONTRACTOR �-s- � ' �- �_��� �: DESCRIPTION � '���� � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION O WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � a f?6 l�er�ro cvat,� -��ru re yu����P-- � J O � �j� �c.�CL<u.� S `J��✓( v'P�'Nd�� � O �,�.� -�r�-c �-- W � Q z �'��•sh r� ►�Ov�f ru�l��e � ��,,ase r � w ,(>ro,/-�.- l�, — ,�^PS� 6 � �xc�t v.tz t��.<c� �-- � � W ❑WORK SATISFACTORY:PROCEED ❑ePROJECT COMPLEfE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY w 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CWERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952� 249-4600 OwnerlContractor on site: Inspector. White Copy���spector's Ffle Canary CopylSite Notice