Loading...
HomeMy WebLinkAbout2013-00279 - new structure � ; CITY OF ORONO ''� 0 1 3 - r� 0 2 7 9 * 2750 KELLEY PARKWAY DATE ISSUED: 06/20/2013 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 't�"AR]Cfi�K— 1'�c l�: �-�,�►�'�� <'6 tPr ��'�-J �"`�"f- PIN : 08-117-23-33-0078 LEGAL DESC : HICKORY HILL : LOT 020 Bi,OCK 000 PERMIT TYPE : NEW STRUCTURE PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : SINGLE FAMILY ACTIVITY : 101-SINGLE FAMILY HOUSES, DETACHED VALUATION : $ 325,000.00 NOTE: SEYARATE PERMITS REQUIRED:PLUMI3ING, MECHANICAL, FIREPLACF:,SF.WF.R CONNECI'ION,LAWN IRRIGATION, WELL(STATE),ELECTRICAL(STATE) NOTE: HARDCOVER&STRUCTURAL COVERAGE ARE MAXED OU"['. NO DECKS PERMI7"I'ED. INITIA�-►`� NOTE: AS FOUNDATION SURVEY REQUIRED PRIOR TO FRAMING INSPF.C'CION. INITIAL:� NOTE: AS BUILT SURVEY REQUIRED PRIOR TO CERTIFICATE OF OCCUPANCY ISSUANCE. INITIAL:�-.`�`'¢ NOTE: BE AWARE, IN THE EVENT WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVGY AT THE TIME TI-IE CERTIFICATE OF OCCUPANCY IS REQUESTED,A TEMPORARY CERTIFICATE OF OCCUPANCY MAY BE ISSUED UPON RGCLIP7'OF A$10,000 ESCROW TO ENSURE COMPLETION OF TIIE AS-BUILT SURVEY AND ALL SITE IMPROVEMEN7'S. [NITIAL: w�" NOTE: PRIOR TO THE START OF FRAMING AN AS-BUILT FOUNDATION SURVEY MUST BE SUBMITTED AND APPROVF,D E3Y CI'I'Y OR A STOP WORK ORDER W[LL BE ISSUED. INITIAL�� "'' APPLICANT PERMIT FEE SCHEDULE 2,406.75 ATLAS HOMES INC STATE SURCHARGE(VALUATION) 162.50 14450 117TH AVE N DAYTON, MN 55369- TOTAL 2,569.25 (763)691-9044 Minnesota State License#: BC20269686 OWNER Real Assets LLC 550 25TH AVENUE N ST CLOUD, MN 56303- AGREEME1vT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or rela[ed work which rcquires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specitied hcrein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issUance,or if construction is suspended for a period of 180 days at any time atter work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with[he S[ate Building Code.This permit may be r voked at any time for due cause. ._�.�._�� t-�� � / 2c: /���� j / / Applicant Permitee Signature Date Issued y S� nature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER AN DESCRIBED ABO E. �� _ • .•J':� is�ia:} : ,YitWdz` aTY3lM] �r� ���] �J�—��c-4�� ' ��s_p�pt ��: s.a��ii� ���, �, �aia � � �� � Pi�eateir 7it'te Ins - Atl�s 4�,�7 �����`� �. 3 Gitd afi ltonc. PreL�zau:, Fi�l�r�:�: •�� � ^c;�'.,�1 Kel:ey �ari��a�� �er�►�s ' Orura� M9V ��b ����4�-4�{� ' �'t!13-�X'�279 1510 hart?'� ^c,4r:�.?� (�rG� Bt• RPr_eiAt t�: �.r1�3;1? tur� �U. c+?13 ' I�?1--.'.�cSi�J , ' Aui.lding aa�•�i�s _..____ _... .. Per�its kzal Asse�C - �ttlas ?�s ��113-GCc79 !`10 Piorth Arsa Iu;�.S�+ ' Dr� �revic��� B��larxe: .�1� Si>1-2U9t7c Per�it� U�e T:o g�3��s-�t�te i cC�l�S..,�ry�8� I5f0 Nor�th �?r� I�:.t1C� 7c�t,ai: __.._._.�?��:� �,,. �_J lUi--3�it� - - " Suilding F�r�it� C*+erk Per�i t.s �ht�C�: 1�lC+: ��l!��' �,�if}�.�? dQ15-�� 11ii� �ii"t�i �Y@I �.�1! �.3'f v�': �7 i'�^e�a_;� Tzt1e 3rys - A�ta:� Nc�s 1G1-�x3;�U� ', T��tai iippli�ds c:,;�s9.?".i , ��ue tv �uvt�SEate ___._�---_.__T t'�errai ts C'�ar�g� T����rerlr _.._�__�--_---�- ��r3_i?053? fS.0 Nt,r+`�t Grr� z,:��.�Xa �i�l"cu1�313 1G:��l � ��)I-c�'�CtS '� , �P;��Y'Y`Nt{ �PW-�t'1+L1u�1" �E�au41`e � �i.?r'iAi.�S `4�1?-C�)�5� ;51(1 �n�th r�r� 5t).EK) �r � :�7i.3c'�.3C� : l��t�ar�ical!^,er�f:clQ4her• ; � Tc,t�1: -____`��i�1.�?0 ' � Rt:a� F�owe� ��� RrEvio��. Balar�ce: ^��, ' Per�aits "��, �� � c'�31;-pt►��ii I�11� Nt�i°tf�; �!r•m ��,�:� " Dr ' 1C�1-cl".�BGc Du� t� �ot�ta�t�tE r�t�i: _._._.____a_�.^��� c��� ___..__��.___.-__-_ r.t,er,<. !a�: itas�t+ �gw3.5.�� ' c�a �,�,; A+�:� 6�usa��-, -� neal �'�a��t� L!_C 1'�-atal 1�Q¢y ied° r r 6�,�i•`N' t'.�3rrg� Te�n��reciv __._..__--,G�i•- tifb/c'�1i2i)l5 11:Jt,r;14 __.__---..___ �� • � . .' CITY OF ORONO BUILDING PERMIT APPLICATION FOR NEW STRUCTURES OR ADDITIONS �O • O Mailing Address: �� ,3 �d� a q �l PO Box 66 Permit number: Crystal Bay, MN 55323-0066 Date received: / StreetAddress:' Received by: y� G� 2750 Kelley Parkway Plan review fee: �� + � , Orono, MN 55356 �O/3 DO a� l�KFSH��� Total Fee: Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. Incompiete applications will be returned. (Please print) GENERAL INFORMATION: � ' Job Site Address: � j �U l�a'��� >�r�- ��'� �_ Wiii this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes � No /f yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: f�7� I,��5 ��-�a� ��e s .� ��. State License# �� Z u "L l,`'� b � (� Expiration Date: � �j l� Phone: (cell) ���3 ����t N�' ��`1 (office) i�>j �`� I ����'�`� Mailing Address: � ti�.� � 7 =� -�.r� ;t,•` Cit : � d�'� ZIP: ; s �(: `� Contact Person: /1�1N, t,�� Applicant is: ontractor / Homeowner (Circle One) Email and/or Fax: �ti��;�.�� �,•,,��,� +:ii•� �� .; 3��� - � � 3� PROPERTY OWNER INFORMATION: Name: ��<< l i�55��5 -�-� Phone (day): �� ' ����- zc>vo Address: 5 S� �_5-f� .,� �1/ City: `;f �l�:.l ZIP: ��6 3�� 3 Email and/or Fax ARCHITECT/ENGINEER INFORMATION: � Name: 1?l�;�l�n� D�_;;���^`� Phone (day): �o�7 3`t �, `�� 7� - Address: Z�P: 5 `' � ��� `1 l-�.y wc�ct 5���� City: ���5��: Email and/or Fax: PROJECT INFORMATION: Description of project: 1. Type of Project 2. Proposed Use 3. Structure Type 4.Sewage Disposal & Water Supply �New Construction � Single Family with [� Residence Addition attached garage ❑ Garage/Accessory Bldg. [� Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water **Any earth movement may also require ❑ Commercial ❑ Other(specify) MCWD review 8�permits. ❑ Industrial � Private Well '� Minnehaha Creek Watershed District(MCWD) ❑ Other: (SpeCify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation (excluding land) $ �L `' �: `� �'' �� C , �� . . A STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions (continued) 2.Type of Construction a. Length (ft.)= Number of bedrooms= [�Wood/Frame b.Width (ft.)= Number of garage stalls: ❑ Masonry Areas in square feet Attached = � ❑ Metal G ❑ Pole Bldg. c. Basement= Detached = ❑ ICF d. 15t Story = ❑ On-site Prefab e.2"d Story= ❑ Off-site Prefab f. YZ Story = ❑ Other(please specify): g.Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ ❑ Permit A lication ❑ ❑ Pro osed Buildin Plans ❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form ❑ ❑ Surve meetin all re uirements ❑ ❑ Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation s ❑ ❑ Se tic S stem Site Evaluation Re ort ❑ ❑ Access Permit ❑ ❑ Wetland Buffer Im rovement Plan ❑ ❑ En ineered Plans for Retainin Walls 4 feet or above ❑ O Plan Review Fee ❑ ❑ Application Escrow&Agreement ❑ ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information, the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. � ApplicanYs Signature: ��� � ��� Date: `� �N - � 3 Owner's Signature: Date: ��'�� PLAN ��E\/IEW C�IECKLIST FOR IVEW STRUCTURES / ADDITIONS Address/Permit Number: � ��� �U ��� ��� Description of work: ,, � f� Septic review by: � � Date Approved: "1 "� � `- � 3 � Zoning review by: Date Approved:__�Q� �� Building review by: +�� Date Approved: �" � � '� Grading review by: � __ Date Approvecl: � � � �i Zoning District: L�'� Zoning File#: Reso#: Reso Date: � ._ _ t� Zoning: Lot Area: ��1�(� SF/AC IMidth: Lot Coverage: ���� -SF ��.7% Survey Submitted: Yes � No Date of Survey: �•�� f� Revised date(?):� `�.�'.�� Pro osed Setbacks: Fr t(Lake) Rear(S et} ( N S E !Al ) ( IV � E W ) Other Buildings Wetland � Side `3ide •:.J .�.J � ..�CJ ��->_ ,� '� � `'- 5��� Defined Height: � Peak Height: `�fi FFE:�G��� � � FFE minus 6 feet= ,E��'�:�� ��(Existing Contour) Perimeter(linear feet) = 50% _ #of Stories Ok? � YES FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: The distance between the lowest FOR A BUILDING ON A SLAB FOUNDATION: ��F � !_ START WITH proposed floor(of the basement or crawl �� � space)and the highest point of the roof. START WITH The distance between the top of slab and the highest point of the roof. If you have a... If you have a... - • GABLE OR HIPPED ROOF(no . GABLE OR HIPPED ROOF(no windows): Subtract half the windows): Subtract half the distance distance between the highest point between the highest point of the roof of the roof to the low point of the to the low point of the corresponding ��' SUBTRACTION corresponding gable or hipped roof SUBTRACTION gable or hipped roof (BASED ON ROOF . GABLE OR HIPPED ROOF(with (BASED ON . GABLE OR HIPPED ROOF(with NPE) windows): Subtract half the ROOF TYPE) windows): Subtract half the distance distance between the top of the between the top of the highest highest window and the highest window and the highest point of the point of the roof roof • ALL OTHER ROOF TYPES(flat, • ALL OTHER ROOF TYPES(flat, mansard,etc:No subtraction. mansard,etc):No subtraction. ADDITION Add the distance between the top of slab � SUBTRACTION Subtract the distance between the (BASED ON and the highest existing grade adjacent to ��.�'�' .� (BASED ON EXISTING basemenUcrawl space floor and the EXISTING the foundation. � �� GRADES) highest existing grade adjacent to the GRADES [ :o ,��f foundation OR 10 feet(whichever is less). EQUALS Defined building height � f{, EQUALS Defined building height �� Shorelanci District MCIND Permit Received Avera e Lakeshore Setback Nlet? Bluff � � Yes � No � N/A / � Yes No es 0 No � Yes 0 No �IV/A ' Permit Number: Setback: Stormwater Quality Existing Proposed �ariance Requireci C�JP Required Ov�rla District Tier F6ardcover r � Yes 0 o Q Yes No � � , � Type(s): Type(s): ,- Updated: January 2013 � • �� �.��.,si� v:\forms\plan review checklist 2013.docx � ; �/ u �, _ ��r ._ . �_ ,_ ._ ..._.�. . . .__ .. ,...a_ � . �,. . _ ,. � � _ _.... �, .,_.� ..,. ,. ,. _ , ., , , . : .._ .v.., .,._M .F ..�._, REMARKS (in-house): Y" Fees to be Char ed YES NO Permit �� Plan Review State Surcharge Investigation Fee e� SAC-Number of SAC Un�ts �,k s z--7 -� Other(specify) � S uare Foota e $ er S uare Foota e Basement X � $ 1 St Floor X = $ 2nd Floo� X = $ Garage X - $ Estimated Construction Value: $ `��,�,�,�l�� �'� ^" Orono Inspections Required Work Requiring Separate Permits Required State Permits 0 Site Plumbing � Grading/Filling �Well � Hardcover Removal �Mechanical 0 Fire �Electrical �Footing 0 Septic 0 Water Connection . �'Poured Wall �Fireplace �ewer Connection Foundation Survey 0 Masonry �'Lawn Irrigation Radon Rock Bed �`Mfg. - Framing � Other(specify) Ja'Insulation ,�`pas-Built Survey �Final � Wetland Buffer 0 Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: �ccess: Existing: � YES � NO New: � YES 0 NO FFICIAL REMARKS - O B NOTED OI� PERMIT AND INITIALLED �'�� � � ������ ����������� Upda4ed: January 2013 v:\forms\plan review checklist 2013.docx C� • Melanie Curtis From: Catherine Bach [cbach@minnehahacreek.org] Sent: Wednesday, June 12, 2013 10:29 AM To: Melanie Curtis; Brandon Wisner Subject: RE: 1510 North Arm Drive Melanie, Sorry for the delay. Doesn't look like it. We received an incomplete application on Friday which is currently being processed. Catherine Bach District Technician Minnehaha Creek Watershed District 18202 Minnetonka Boulevard Deephaven, MN 55391 Direct: (952) 641-4504 Main Office: (952)471-0590 Fax: 952-471-0682 www.minnehahacreek.or� MINFtfHAMA CR�EK WATERSNEp Pi$T�ICT �Think Green - please do not print this email unless necessary From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Thursday, June 06, 2013 4:20 PM To: Catherine Bach; Brandon Wisner Subject: 1510 North Arm Drive Catherine or Brandon Have you issued an erosion control permit for the new house project at 1510 North Arm Drive? Thanks. Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning &Zoning Office 952.249.4620 1 Melanie Curtis From: Melanie Curtis Sent: Thursday, June 06, 2013 4:34 PM To: Todd Holmers Subject: Plans not to scale 1510 North Arm?? Todd- Honesty...l don't think the plans are to scale. Sent from my iPhone. i f ' , Christine Mattson From: Christine Mattson Sent: Thursday, May 30, 2013 2:14 PM To: 'toddholmers@gmail.com'; 'jamisonkohort@gmail.com'; 'markpway@gmail.com' Cc: Melanie Curtis Subject: 1510 North Arm Drive/ Permit Numbers 2013-00279 &2013-00282 Attachments: demo application.pdf; Escrow Agreement- Building Permit w Erosion Control 2013-00279.pdf; Zoning Disclosure Principal Structure Demo 2013-00282.pdf We have received the revised survey, building plans and hardcover calculations,all dated 5/30/2013 and will begin reviewing the new information. Demolition Permit Application. The demolition permit application submitted needs additional information, specifically items 1—4. A copy of the submitted application is attached. Zoning Disclosure and Declaration. Before the existing principal structure can be demolished the enclosed Zoning Disclosure and Declaration form must be signed and returned. Escrow& Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of- pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project is$2,500. The escrow agreement is enclosed. The property owner must sign the escrow agreement and submit a check for$2,500. Your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements; please contact the MCWD regarding your project. Please note,the City of Orono will not issue a building permit with a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please feel free to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356(physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ '� 952.249.4620 8 952.249.4616 � cmattson@ci.orono.mn.us � www.ci.orono.mn.us Summer Office Hours: (Monday, May 20 through Friday,August 30,2013) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Thursday,July 4,2013 i . - . . S�L�f�� , . �e�� � ��� �.� t�+�-� u� ►5°�s�'�``�`�.- Cou . Dor��� �'� ��- ? �o May 29, 2013 � � �� � � Mark Way C���"U� ' _'"_!�-�1�►�''^"' Atlas Homes, Inc. ��, 14450 117th Ave N Dayton, MN 55369 Re: 1510 North Arm Drive Demolition 8� Building Permit Applications #2013-(�2$2 8� 2013-00281, respectively Z�a ,� z��. The following items must be submitted or revised in order for your applications to be considered complete and for the plan review to continue: 1. Buildin Plans. It of our first review of th uildin lans, it was determined t.�.��ro osed g �� 3� ome was r the allowe tructural cover limit. An up ted survey, dat�ii 5-21-1 and h r calculations were recei . eed a new set of building plans to be submitted which match the revised survey. 2. Zoning Disclosure 8� Declaration. Before the existing structure can be demolished, the enclosed Zoning Disclosure & Declaration form must be signed and returned. 3. Escrow 8� Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project is $2,500. The escrow agreement is enclosed. The property owner must sign the escrow agreement and submit a check for$2,500. Your project may trigger the Minnehaha Creek Watershed DistricYs (MCWD) permitting requirements; please contact the MCWD regarding your project. Please note, the City of Orono will not issue a building permit with a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions. Sincerely, CITY OF ORONO Christine Mattson Planning Assistant c Jamison Kohort, Real Assets II; 550 25th Ave N; St. Cloud, MN 56303 and via email at jamisonkohort(a�gmail.com Mark Way via email at markpwav(a�qmail.com Todd Holmers via email at toddholmersCa�qmail.com Lyle Oman, Building Official Jesse Struve, City Engineer Christine Mattson From: Christine Mattson Sent: Tuesday, May 07, 2013 9:21 AM To: 'toddholmers@gmail.com' Cc: Melanie Curtis Subject: 1510 North Arm /#2013-00279 Todd, City Engineer,Jesse Struve, has reviewed the survey submitted for the new principal structure at 1510 North Arm, his comments are below. Please have your surveyor address his comments and submit an updated survey. Also, we received your request to combine Lots 20&21, Hickory Hill and your request to change the address from North Arm to Cherry Ave. Once we receive a copy of the deed, will submit your request for lot combination to Hennepin County; we will review the address change request in-house. Further, we will continue to review and process the permit application for the new home concurrently with your lot combination request. If you have any questions, please don't hesitate to contact us. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ '�li' 952.249.4620 8 952.249.4616 � cmattson@ci.orono.mn.us � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm Summer Office Hours begin Monday, May 20,2013 Monday-Thursday: 7:30 am to 5 pm/ Friday 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 27,2013(Memorial Day) From: ]esse Struve Sent: Monday, May 06, 2013 4:14 PM To: Melanie Curtis Cc: Christine Mattson Subject: 20130506 1510 North Arm - 2013-00279 Melanie, I have reviewed the survey for the propose building and have the following comments: 1 • The proposed retaining walls should have the top of wall (TW) and bottom of wall (BW) called out on the plans. It appears there is a spot elevation which may represent this information, but I can't clearly tell if it is for the wall or something else. • The silt fence should be extended along the east property line and wrap back north to the proposed driveway. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661 - Direct (952) 249-4616- Fax www.ci.orono.mn.us 2 Jesse Struve From: Jesse Struve Sent: Monday, May 06, 2013 4:14 PM To: Melanie Curtis Cc: Christine Mattson Subject: 20130506 1510 North Arm -2013-00279 Melanie, I have reviewed the survey for the propose building and have the following comments: • The proposed retaining walls should have the top of wall (TW) and bottom of wall (BW) called out on the plans. It appears there is a spot elevation which may represent this information, but I can't clearly tell if it is for the wall or something else. • The silt fence should be extended along the east property line and wrap back north to the proposed driveway. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661- Direct (952) 249-4616- Fax www.ci.orono.mn.us 1 Melanie Curtis From: Melanie Curtis Sent: Friday, May 17, 2013 2:49 PM To: 'markpway@gmail.com' Cc: Christine Mattson; 'toddholmers@gmail.com'; 'Mark' Subject: 1510 North Arm Drive/#2013-00279 Mark, While reviewing the building plans for permit application #2013-00279 (for 1510 North Arm Drive) we determined the proposed structure exceeds the 15% structural coverage limit based on the area of the property (City Code Section 78- 1685). The hardcover calculation sheet submitted indicates the property is 16,912 sf in area therefore you are allowed up to 2,536.80 sq feet of structural coverage. According the information submitted, the house and porch total 2,681.00 sq. ft. exceeding the limit by 145 square feet. Please revise your plans to meet the 15% structural coverage limit so that our plan review can continue. Thank you, Melanie Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning&Zoning Office 952.249.4620 Email: mcurtis(a)ci.orono.mn.us Website: www.ci.orono.mn.us City of Orono Office Hours Monday - Friday 8:00 am - 4:30 pm 1 i � May 1, 2013 Mark Way Atlas Homes, Inc. 14450 117th Ave N Dayton, MN 55369 Re: 1510 North Arm Drive Demolition & Building Permit Applications #2013-00282 8� 2013-00281, respectively On April 24, 2013 the City received a building permit application for a new principal structure. As we started the review, we noted both properties addressed 1510 North Arm Drive, are two separate parcels with two property identification numbers .(,�ID), PIDs 08-117-23-33-0078/79. Before a new home can be built, the lots must be com�in�d ,fr�ta, ol�-Submit to me in writing the request to combine the lots and the City will start the proc t "��e the lots with Hennepin County. Once we receive documentation from Hennepin County t ��1'ots have been combined and have received a new PID the survey must be updated to reflect the c mbination. The City will not allow a home to be built across two PIDs. Also, according to Hennepin County the property owner is not who is shown on the building permit application. If the sale is recent, please subm�t a purchase agreement or closing documentation showing new owner is Real Assets II. � Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions. Sincerely, CITY OF ORONO Christine Mattson Planning Assistant c Jamison Kohort, Real Assets II; 550 25th Ave N; St. Cloud, MN 56303 and via email at Lmisonkohort(a�qmail.com Mark Way via email at markpwaYCa�qmail.com Lyle Oman, Building Official Jesse Struve, City Engineer _ ----� +; �� ` . : � .... ..... . � 4� ��. I �O •O A `{Fi[ ff y � G �� � � � ���Kesrto�`�. � � � � -- s,Y `�d .�� Legend � � yy. Railroad � .3, � y. J9'.�`�� .� �� R�, , ' � City Limits _. s .; I �� ❑ Parcels(1-1-2013) #� > ;, ' �,, �: Wetlands �u a-�. �'- � � Preserve-50' !� � � l� A VE CHER� h ��'� ' �« �I ■ Managel-35' - �r;. �..��_' ❑ ; ,�._ Manage 2-25' O K . � �� � `'''s;;:_� I, � Manage 3-16.5' � _ �z I I � Unclassified y � � � � �' � Stormwater Quality Overlay C � ■ Tier 1-25% „ ,. � ' .,.. . � Tier2-30% ._ .._,.,.m..,. . -....,. ` -".��' � Tier 3-35% � � E � � � `Af��r � ��_4 � Tier4-50% 9 � � � . Tier5-85% I� Exempt o� Q •��1 N ����\ � , � 7 M'-■■ � � � ��� ' , ...,4:. ..�.,..s.�.,......,s�. .,�..,.. . . �. � _ ���' � g. ,� ��� �� r/WV � - ,� 1510 North Arm � 1 Drive � � �__._ ___ Dizclaimer' _.__ - � ----. This drawing is neither a legally rem�ded map nor a rvey and Is not intended to be used as one.This drawing is a compilation of records,information,and data 0 58 Feet e bcated in various city,rounry,and state offres,and other sourcez affeccing the area shown,and is to be used for reference purposes only.The Ciry of Orono is not OO Bolton&Menk,Inc-Web GIS 5/15/2013 9:55 AM rrcnnnaihla fnr anv inarnuarir<hrr>im m�fainnd . • r i . e i � October 2012 �'����NO� City of Orono ., � I Hardcover Calculation Worksheet � � �����L���a;�� Property Address ���o d�r'orf�i ,�r,�r ��r'�F/� �"- Prepared by 6roh/�r� �`,��,�,��i���, �r1� Date s✓�o 13 T� ' Stormwater Quality Overlay District Tier. (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 1. EXISTING HARDCOVER In the following table, identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. Key to Hardcover Item (Describ�e) Length x Width Total Surve (S uare Feet Exam le Gara e 24'x 30' 720 S.F. A E�c�sfir� O� vs� 1D83 S.F. B Exis�ia rG 45�' s.F. C � �� s �' i5 s.F. D �x��ir, d �vc � � ��8� s.F. E is i t,l�J t 7S s.F. F S.F. G S.F. H S.F. I S.F. J S.F. K S.F. L S.F. M S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. 1 Total Existin Hardcover �a��j s.F. Excludable Hardcover: � �i �ir�Jr" 4v. ' %�.� S.F. � S.F. S.F. S.F. S.F. 2) Total Excludable Hardcover �',� S.F. 3 Net Existin Hardcover Subtract line 2 from line 1 /�7� s.F. 4 Total Lot Area /��/? s.F. , Existing Hardcover Percentage [ (3) = (4) ] ��, �7 % 2. Proposed Hardcover (Over—>) � ���o ���� ��� • � � �� � ORON 0 C4PY 2. PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. Key to Hardcover Item (Describe) _ Length x Width Total Surve S uare Feet Exam le Gara e 24'x 30' 720 S.F. A ����.�ra v'� ���ci..�:"���r�f ��t��.t; -....�' .� a, S.F. B �:�,:� ��1�'s": c�:�� `L" �+='��''��.�' °'-�—.w,�-=;;:=� S.F. F C �:I9/D l" �.�1��"/�a��°'� ,S �' '�' S.F. � �°.Yu)(11+�t`' `�-'X�/'�'�.tl''"✓ Y'lU,., � - '' . '.,.�.., S.F. % S.F. E �:i'��'� t�tr; �+�,.� F `-p ,�x,�K,./ >,r•�������:. .��54 S.F. G �''r:'.� �-,�:,':�' r?�ril/�v,,t�t c /�8 s.F. H ro .��'..� ��y,..,�, ��� S.F. I ��`'i�'c� �r.-'." ,�i r:i��°; �% /,',�/ S.F. J ,�«�� ����;�' la�.r�anv��K�.� � S.F. K !�'. O'J'G -�� YGT, Z S.F. L ra �+ � 3� W D l S.F. M S.F. N S.F. ) � S.F. p S.F. Q S.F. R S.F. S S.F. T S.F. U S.F, U S.F. w S.F. X S.F. Y S.F. Z S.F. (1) Total Pro osed Hardcover q2Q S.F. Excludable Hardcover: ��-:- ^�. , ,.'=f.��., �� �,..y /l' �� S.F. ,��.�: K �-'c> / �,�` ,r G z¢ S.F. � r� rI si � S.F. S.F. S.F. 2 Total Excludable Hardcover �Z S.F. (3) Net Pro osed Hardcover Subtract line 2) from line 1 �OT9 S.F. (4) Total Lot Area �,�g'f�. S.F. Proposed Hardcover Percentage [ (3) _ (4) ] Z�, /2 % DATE TIME � CITY OF ORONO CALLED IN INSPECTION N�O,�TpICE I SCHEDULED � _<� �� PERMIT NO.(�f�'/3'"�Z�T C MPLETED 01.��1�-r'�,,�`-9C'�2J--✓�y A-c�'.� ADDRESS �5� " � OWNER �S TELEP ONE NO. ���,� CONTRACTOR � � s � �: DESCRIPTION ��1 ��G���� �n S�%�o� � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL O ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT Q ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W C � J O � � O � ti � Q � Z W � W � � d �/ / W� �Y70RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑ CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY � ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORE COVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL RETURN G CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALI TO ARRANGE ACCESS. Cal1 for the next inspection 24 hours in advance. (952� 249-46�� OwnerlContractor on site: Inspector. White Copyllnspector's File Canary Copy/Site Notice C/ —J D TIME � CITY OF ORONO CALLED IN ��_ INSPECTION NO I E DD�1 SCHEDULED `�-9-/� �� PERMIT NO c ADDRESS /5 r �"! �I"I'Y� � � Ci�'L OWNER TELEPHONE NO.��Z'3Zg D�S�' CONTRACTOR � �Q S � D � � DESCRIPTION ��Y � � ❑ FOOTiNG ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNbATION/REMOVAL � OWNERICONTAACTOR TO MEET YOU:_YES_NO c�.� COMMENTS: � W a � � O � � O � W � Q � 2 W � W � � d � .] O KSATISFACTORY:PROCEED ❑PROJECT COMPLEfE � ❑CORRECT WORK 8 PROCEED �ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CAIL FOR REINSPECTION TEMPORARY V BEFORECWERING PERMANENT ❑CORRECT UNSAFE COND�TION WITHIN HOURS. ❑ pH0T0 TAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952� 249-460� OwnerlContractor on sit Inspector. � White Copyllnspector's Ffle Canary CopylSite Notice �� DATE �ME CITY OF ORONO CALLED IN � 3 INSPECTION NOTICE SCHEDULED ��2_ PERMIT NO. � n/.3 -60 Z�COMPLETED ADDRESS �c��T�---�""f�-=-�,�jz�Yl ���ae'�, OWNER TELEPHONE NO ��N ���`�` fo 3 CONTRACTOR � DESCRIPTION � ��--� ��� � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL O ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEP FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU: YES_NO � COMMENTS: � W a � J O � � o _�.�� � ,�� �- � W � Q � Z W � W � � d � ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. �952� Z49-46QQ OwnerlContractor on site: Inspector. V � White Copyllnspector's File Canary Copy/Site Notice DATE TIME �/ CITY OF ORONO CALLED IN � INSPECTION NOTICE SCHEDULED — � ' PERMIT NO. " ��7 MPLEfED ADDRESS �J�/d • /'Nt d/f'" � �9J'`S OWNER TELEPHONE NO. � � T�� CONTRACTOR J � DESCRIPTION � � �l�"'" ���� �� � � ❑ FOOTING ❑ LUMBING FINAL ❑ E CAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL � TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FtNAL ❑ SEPTIC INSTALL ❑ HARD COVEFi REMOVAL � ❑ PLUMBING RI � SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERfCONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: a ��-S v 1 . fZ.(�- , d !L � � � �' �_ Ol� 0 � W � 2 � J � VV Q u W � W � j ��14tQ$K SATISFACTORY:PROCEED �OJ ECT COM PLEf E � ❑CORRECT WORK 8 PROCEED UE CERTIFIC OCCUPANCY O O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (g52) 249-46�� OwnerfContractor on site: Inspector. White Copyllnspector's File Canary Copy/Site Notice L� p TIME v CITY OF ORONO CALLED IN �/ � / INSPECTION�-�I E�J D SCHEDULED � PERMIT NO��J `� C MPL D �•�'�—' � C�n'�/ ADDRESS ' OWNER LEPHONE NO. CONTRACTOR � � DESCRIPTION ti � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHOREIWETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP Q COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO c�., COMMENTS: � W C � J O � � � o� ° V�c��-+.. f=�c1�.�S r..�r�` �s Q � � � � { z �" �!��,n � U �} R A-�Y=�� W � � a' �2_ t�u vw�t�K SATISFACTORY:PROCEED ❑ PROJECT COMPLETE �RRECT WORK S PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECWERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED �INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. (952� 249-4600 OwnerlContractor on site: Inspector. +� White Copyllnspector's Flle Canary CopylSite Notice / ' DATE TIME V-�,J� CITY OF ORONO �r CALLED IN \jy� � INSPECTION NOTICE �1 1 SCHEDULED PERMIT N0. ��� '� COMPLETED ��� � /�c�c.�� ADDRESS ���� � �`1 OWNER TELEPHONE N0. CONTRACTOR � DESCRIPTION �� ,�, �1 ll� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL O MECHANICAL RI ❑ LAKESHORE/WETLANDS � ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEEf YOU:_YES_NO � COMMENTS: � W 4 j , � O � � ° i- W � Q � Z W � W � � d W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE � ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REfNSPECTION TEMPORARY � BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR '�� CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. �952� 249-46�� OwnerlContractor on si e: � Inspector. rV �� White Copyllnspector's File Canary CopylSite Notice