HomeMy WebLinkAboutEscrow refund info . • .
� •
emo
To: Finance Department
From: Christine Mattson, Planning Assi�nt
�/v�
CC: Street File
Date: September 22, 2014
G/L: 101-22205
Re: Escrow Refund
Buiiding Permit Application #2013-00279 pertaining to 3955 Cherry Avenue (fka 1510 North
Arm Drive) is complete. Please refund the$10,000 to the appiicant, Rea�Assets, LLC.
The following is attached:
• Original signed escrow agreement
• Copy of cash register receipt showing escrow amount received
Mail to: Real Assets, LLC
550 25th Avenue N
St. Cloud, MN 56303
w:\street files\cherry ave\3955(formerly addressed 1510 north arm drive)lescrow refund form 2013-00279.docx
TEMPORARY CERTIFICATE OF OCCUPANCY
ESCROW AGREEMENT
Orono Building Permit#2013-00279
AGREEMENT made this�L�r�day of `v���ei"'`�`r, 20�3 , by and between the CITY OF
ORONO, a Minnesota municipal corporation ("City") and Atlas Homes, inc. ("Owners").
Recitals
1. Construction of the new residence located at 1510 North Arm Drive (former address)
3955 Cherry Avenue (new address) the ("Subject Property"), legally described as Lot 20
and Lot 21 except the east 10 feet thereof, Hickory Hill in Orono, Hennepin County
Minnesota, is the subject of building permit application number 2013-00279 has been
completed.
2. Winter conditions currently prohibit completion of exterior improvements, final grading,
and vegetation establishment. An as-built survey cannot be accurately conducted at this
time.
3. Owners request the City issue a temporary certificate of occupancy ("TCO") to the
Owners so that the Owners may occupy the new residence.
4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of
exterior improvements, continuation of erosion control and submittal of an as-built survey
to the City.
NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit $10,000 with the City. A►I accrued interest, if any, shall be paid to
the City to reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any
exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to
the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of
$500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent
with expenses the Owners would be responsible for under a building permit application. The escrow will
also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that
the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of
Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any
hazardous conditions associated with the work and to repair any damage to public property or
infrastructure that is caused by the work (including planning, engineering, or legal consultant review)
associated with building permit #2013-00279 if compliance with the approved building permit is not
accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will
in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of
the Owners' receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make
payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners
pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval
of the Owners to reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to
the Owners when the review has been completed and written notification is received from the Owners
requesting the funds.
155441
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible
expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the
unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012.
7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents,
employees, officers and contractors, the right to enter upon the subject property for the specific purpose
of inspecting and completing any exterior improvements, final grading, establishment of vegetation and
the restoration of the subject property should the Owners not complete the work by the specified dates.
CITY: CITY OF ORONO OWNERS:
By:
�ts:
n� � �
��,��� � , � �� �:� �,-�5�� _ ��t � . ��a��_� ��..��
.�. $,,.��.��� . _ _ r �
155441
00�-�=_Wd�•'#p �'I�,,14ilt t
Oq•q��"--- 'Paaap,,�! a6uey�
61,,�n _
0 rt�4,# .�u1 �Pa�H`d�l�}ol
-�0_�'1 __y £9BIlr ;8�:�o,f�
OQ OpS`1� --- ��a�
-- __ 4'J
3rsudaQ .�ado 'rp�41
0�`OOS'� ianap_na� Pa�r.�a
t10' 61c'4n-�I�c'# - �.7!-Maa��
�aaue�e$ snorna,��
�1a�0-€'IO2# '�al `sa�N sei�
€`l4Z `�I nc�
L� IEUpIO` °N �dta�a8
443�i-6+t�-�r F �
�'eM��'AaNW ouo�,�
au����°�c��
� ' CITY OF ORONO * 2 0 1 3 - 0 1 z z 1 *
2750 KELLEY PARKWAY DATE ISSUED: 1U14/2013
ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADURESS : 3955 CHERRY AVE
PIN : 08-117-23-33-9999
LEGAL DESC : HICKORY WLL
: LOT MB BLOCK MB
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: BUILDING PERMIT 2013-00279 ESCROW FOR TEMPORARY CO
APPLICANT ESCROW FBE -BUILDING 7,500.00
Atlas Homes
14450 117TH AVE N TOTAL 7,500.00
DAYTON, MN 55369-
OWNER
Atlas Homes
14450 1 17TH AVE N
DAYTON, MN 55369-
AGREEMENT AND SWORN STATEMENT
The work for���hich this permit is issued shall bc peribrmcd according to
the approved plans and specifications,applicable City approvals,and thc
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and bccome null and void if construction authorized is not
commenced within I AO days of the date oi issuance,or if construction is
suspended for a period of l80 days at any time after work has commenced.
The applicant is responsible for assuring all required inspcctions are
requested in conformance with the State Quilding Code.This permit may be
revoked at anv time for due cause.
/ / / /
Applicant Permitee Signature Date Issucd Bv Sienature Date
SEPARATF PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
BUILDING PERMIT ESCROW AGREEMENT
Orono Buiiding Permit#2013-00279
Demolition Permit#2013-00282
AGREEMENT made this_�day of �/1(.�� , 20�, by and between the CITY OF ORONO,
a Minnesota municipal corporation ("City") and Real Assets II ("Owners").
Recitals
1. A demolition and building permit applications have been filed for a new principal structure located
at 1510 North Arm Drive the ("Subject Property"), legally described as Lot 20 and Lot 21 except the east 10 feet
thereof, Hickory Hill, Hennepin County Minnesota.
2. Owners request the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the
Owners would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the work (including planning,
engineering, or legal consultant review) associated with building permit #2013-00279 8� demolition permit
#2013-00282 if compliance with the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the
subject prop.erty pursuant to Minn. Stat. §§415.01 and 366.012.
�..
CITY: CILY OF`ORC3l�[@ OWNER:
,, , . - � � �
By: ' _ - ��I/�� �-�'
__
. � -
�ts: , �. , ��---_ �—�—.� ..�-s..�----___
ai llse On� . "''� CI Ori rnal#o Plannin tZ Cc�p.y,�:Pro e Oar�ar ... �'Copy to Street File
�� yw . � �� � � �
� ' ' CITY OF ORONO * Z B 1 3 — 0 0 5 3 9 *
2750 KELLEY PARKWAY DATE ISSUED: 06/20/2013
ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 1510 NORTH ARM DR
PIN : 08-117-23-33-0078
LEGAL DESC : HICKORY HILL
: LOT 020 BLOCK 000
PERMIT TYPE : ESCROW FEE -TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE -TIED TO BUILDING PERMIT
NOTE: TIED TO BUILDING PERMIT 2013-00279&2013-00282
APPLICANT ESCROW FEE-BUILDING 2,500.00
ATLAS HOMES INC TOTAL 2,500.00
14450 117TH AVE N
DAYTON, MN 55369-
(763)691-9044
Minnesota State License#: BC20269686
OWNER
Real Assets LLC
550 25TH AVENUE N
ST CLOUD, MN 56303-
AGREEMENT AND SWORN STATEMENT
The work for which[his permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and [he
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separa[e
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance;or if construction is
suspended for a period of 1 SO days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
� c� 1--'Q-�.Q�.� � �� � �c3� 3 / /
P�ip icant Permitee Signature Date lssued By S� ture Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
�Permit
o I O �
1
� �. . ► ►� �J � � �� �J � �'� � a.
���: �,�279 _ UpdateAdC�e_s
C•Mafn PIM Address
Prrmft Address: 3955 CherryAve f Additfonal PIN Addres>
.
r Pertnit Issue
General�Fees ��sPections(7'1)I Notes�Aoalicerrt Detnil�CO Deteil'
Seq Inspection Type Inspedor Date Status H Fee Rec
� 1 Ratlon Preverrtion Irtspedion WGIB 9/9/2013 P 0
� 2 F06tirrg
� 3 Paured Wall WGIB 6l27J2013 P Y'0
� 4 Foundation Survey B/4 Framing CMAT 9/10/2013 P �IY 0 �
� 5 Framirx� WGIB 9l11/2013 P iY 0 �
� 6 Insulation WGIB 9/18/2013 P � 0 -
� 7 Escrow ReTund Requested
� 8 Esaow Refunded
� 9 Flnal IWGIB 11/14/2013 �`( 0 _
► � "
� 11 Erosion CoMrol
►+� X