My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Excavation observations and compaction testing
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2933 Casco Point Road - 20-117-23-31-0048
>
Land Use
>
Excavation observations and compaction testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:56:40 PM
Creation date
3/25/2016 2:53:28 PM
Metadata
Fields
Template:
x Address Old
House Number
2933
Street Name
Casco Point
Street Type
Road
Address
2933 Casco Point Road
Document Type
Land Use
PIN
2011723310048
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— :, <br /> ��� ���� � <br /> ��tASi CYJ�� Braun Intertec Corporation � � <br /> INTERTEC <br /> September 18, 2009 Project BL-09-03483 <br /> i <br /> Christopher Thompson <br /> AMEC Geomatrix, Inc. <br /> � 14525 Highway 7,Suite 104 <br /> Minneapolis, MN 55345-3736 <br /> �� Shane Walgamuth <br /> �� Shane Homes <br /> ';� 3925 Excelsior Boulevard, Suite 5 <br /> r Minneapolis, MN 55416 <br /> i <br /> i , <br /> � Re: Excavation Observations and Compaction Testing <br /> � <br /> Farwell Residence <br /> 2933 Casco Point Road <br /> Orono, Minnesota <br /> Dear Mr.Thompson and Mr.Walgamuth: <br /> As you authorized, we have completed excavation observations and compaction testing at the <br /> above- referenced address. The purpose of the observations was to evaluate the suitability <br /> of the natural soils to support the proposed house and engineered fill. The purpose of the <br /> compaction testing was to evaluate whether the fill placed below footings was properly <br /> compacted to support the proposed house. <br /> `� Background <br /> The previous house on this lot was removed. After the demolition process was completed and <br /> footing excavations for a new house were started, petroleum contamination was encountered. <br /> After a series of soil tests were completed, recommendations were made to remove the <br /> contaminated soil from below the proposed new house. The excavation needed to remove the <br /> contaminated soils only impacted a small part of the house footprint. <br /> Excavation Observations <br /> The excavation to remove the majority of contaminated soils was completed on September 14, <br /> 2009. (The verification of the removal of contaminated soil was not the responsibility of Braun <br /> Intertec). The depth of the excavation to remove contaminated soils was extended to an <br /> approximate elevation of 938. <br /> _ <br /> � --1 _. __ _- -_. - - • Pr�,t't�In�� ,��,�rri<<r���,�ui,I �>>i�n����im�tit<<f <��1��n,�n, un<<� 1uS' <br /> �- , <br /> ' I <br />
The URL can be used to link to this page
Your browser does not support the video tag.