HomeMy WebLinkAbout1995 - DNR permit application Permit Anplication No. 95-230 October 19, 1995 Applicant: Frederick Hey 2927 Casco Point Road Orono, MN 55391 Location: City of Orono, T117, R23W, Section 20 Purpose: Installation of approximately 56 lineal feet of rip rap shoreline erosion control along Spring Park Bay, Lake Minnetonka. Applicable Rules: Rule F - Shoreline Improvement Rule M- Shoreline Contractor's License DNR General Permit Exhibits Reviewed: l. Permit application number 95-230 received October 5, 1995. 2. Site survey received October 5, 1995. 3. Revised typical cross section received October 17, 1995. Staff Review and Summarv: The project involves the installation of 56 lineal feet of rip rap shoreline erosion control along Spring Park Bay, Lake Minnetonka. The site is located within Subwatershed Planning Unit U-10, LM-38. The applicant is proposing to remove an existing retaining wall. After the retaining wall is removed brick from the existing shoreline will be placed into the voids created by the retaining wall. The proposed rip rap will utilize boulders between 12" and 33". The proposed filter layer will be a minimum of one foot thick. The proposed slope will be no greater than 2 to 1 (horizontal to vertical). The licensed shoreline contractor to do the proposed work is Landview Landscaping. Recommendations: Approval pending receipt and staff approval of 1. Certification of the following completed permitted projects per the third condition of the Minnehaha Creek Watershed District Shoreline Contractor's License 95-04: • 95-01 Winzeler • 95-02 Schwingler • 95-03 Blanch • 95-OS Johnson • 95-09 Colesworthy ��T � 0 1995 • 95-11 Canning • 95-12 Monton/Smith Frederick Hey Permit Application No. 95-230 October 19, 1995 Page 2 • 95-13 Smith • 95-14 Wheaton • 95-20 Sharratt • 95-21 Amis • 95-118 Dann The following conditions shall be placed on the permit: 1. An independent professional engineer registered in the State of Minnesota, of your own selection and at your own expense, shall certify that your completed projects are constructed in accordance with the approved permit application. 2. All District rules and permit conditions shall be complied with. Proiect Review Status bv Other Governmental Units: Joe Richter, DNR Hydrologist stated that the placement of the brick behind the rip rap would be OK as long as brick was entirely covered by rip rap.