HomeMy WebLinkAbout2012-00194 - porch CITY OF ORONO * 2 0 1 2 — fd 0 1 9 4 *
' 2750 KELLEY PARKWAY DATE ISSUED: 04/02/2012
. ORONO, MN 55356-
952 249-4600 FAX: 952 249-4616
ADDRESS : 2807 CASCO POINT RD
PIN : 20-117-23-32-0014
LEGAL DESC : SPRING PARK
: LOT 123 BLOCK 000
PERMIT TYPE : ADDITION/REMODEL/REPA[R
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : PORCH RESIDENTIAL
ACTIVITY : 434-RESIDENTIAL
VALUATION : $ 150,000.00
NOTE: SCREENED PORCH
ADVANCED PLAN RF.VIEW PAID ON#2012-00193$881.89 W/CC. �
* COMPLIANCE WITH RESOLUTION#6120 IS REQUIRED FOR FINA1,APPROVAL. � (WITIAL)
* CONFORMANCE WITH CI"CY ENGINEERS RECOMMENDATION DATED 01/30/2012. (INITIAL)
OTHER INSPECTION RF,QUIRED[S FOR STRUCTURAL SLAB. �
APPLICANT PERMIT FEE SCHEDULE 1,356.75
SCHWARZ BUILDERS INC. STATE SURCHARGE(VALUATION) 75.00
307 MANITOBA AVENUE S.
WAYZATA, MN 55391 MISC FEE 0.00
(952)476-6768 TOTAL 1,431.75
Minnesota State License#: 3922
OWNER
BAILEY,JOHN & PATRICIA
2807 CASCO POINT RD.
WAYZATA, MN 55391-
AGREEMENT AND SWORN STATEMEIVT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
Sta[e k3uilding Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type ofwork
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if consVuction is
suspended Yor a period of 180 days at any time after work has commenced.
The applicant is responsible for suring all required inspections are
reques[ed in eonform ce ith t' State Building Code.This permi[may be
revoked at an e r e cau
+
V',�, � �- � 2 � �01
. ' �' �
Applicant Permrtee Signat �e Date Iss d By Signature -" Date
SEPARATE PERMITS REQUIRED FOR WORK OT ER THAN DESCRIBED ABOVE.
� - ''
/
��
. City of Orono �j� �
Building Permit Application �
�
for New Structures or Additions
--- Mailing Address: ���� _
,;
� �\� PO Box 66 Permit number: `` �
�' ,�'':.
�/� , Q� Crystal Bay, MN 55323-0066 Date received: � '�/S ���=�
�I �"' . I� Received by: �F�
41,,� �� ' ,,;, StreetAddress:'
\�`� �_:,� titi�/ 2750 Kelley Parkway �� '�J . �"f � �? �'
��cA �„ �x� � Cc� � � Plan review fe � (;�/.� — �� �
\�k���o�,�� Orono, MN 55356
___" Total Fee:
Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us
This application form must be completed in full and all required information must be submitted.
Incomplete applications will be returned. (Please print)
GENERAL INFORMATION:
Job Site Address: _.� �'C``j Lf���C� ��:���; �L,�
Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes �No
lf yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be
required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed.
CONTRACTOR/APPLICANT INFORMATION:
Name: ���I�,. N f` Z l�«�t h`z ��_5 .(��-L_
State License# "::,L C�C:�:S`!,��- Expiration Date: ,� � 3/-��2
Phone: %5� - y '7(� (� 7(�,5�' (office) �!.� - "5'�c�> =�''Y 4' �� (cell)
Mailing Address: '�,.�' ry'�� ��311 Cit : C .;� ' - t �1� ZI P: i � �`
Contact Person: � •��� � 5�� i-� r,�,iy9 (L � Applicant is: ontractor a� Homeowner (ClrcleOne)
Email and/or Fax: 5� �1 t.�:=c �r' T h,_;� /��lc� -�:�i✓� �� �: '_�a{1 vc.'��v� �
PROPERTY OWNER INFORMATION:
Name: �c; � j_�, l L r `�
Phone (day): � � - ' ' � .
Address: �ri��7 �=(f��� �C�t Y�.�7 � City: �� ,�'C,�2.�L) ZIP: � � �`j�
Email and/or Fax � r:r �� ' -�i�
ARCHITECT/ENGINEER INFORMATION:
Name: ��-' ' �� ! �= ' S
Phone (day): ' ,;Z- �� - -• - �
Address: SC 7 �)�.i/�lL' i �C,(C,T� �it:f CitY� Lt�I�tf C i'i T/'� ZI P: � 5 ;�� �
Email and/or Fax: yS�- Y�(�-Qg�(`�
PROJECT INFORMATION:
1. Type of Project 2. Proposed Use 3. Structure Type 4. Sewage Disposal&
�^�� Water Supply
❑ New Construction � (_,7�" •,� ❑ Single Family with Residence
,�.Addition �� � attached garage Garage/Accessory Bldg. ❑ Public Sewer
❑Accessory Building Single Family with ❑ Deck
❑ Relocation detached garage ❑ Oifice/Commercial ❑ Private Sewer
❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse
❑ Public ❑Storage ,�Public Water
"*Any earth movement may require ❑ Commercia� ❑Other(specify)
MCWD review�permits. ❑ Industrial ❑ Private Well
Mi�nehaha Creek Watershed District(MCWD) ❑ Other: (speCify)
18202 Minnetonka Blvd
Deephaven, MN 55391
Phone: 952-471-0590
Fax: 952-471-0682
�,v�r�w.minnehahacreek.or
Estimated Construction Valuation (excluding land) $ �SQ, �pQ, 0(�
ti
' STRUCTURE INFORMATION:
1. Structure Dimensions 1. Structure Dimensions(continued) 2. Type of Construction
/ t
a. Length (ft.)= �(O Number of bedrooms= �Wood/Frame
� �� ]��tVlasonry
b.Width (ft.)= � � 7 Number of garage stalls: �'Metal
Attached= ❑ Pole Bldg.
Areas in spuare feet Detached= ❑ ICF
❑ On-site Prefab
c. Basement= ���/,k�-� ❑Off-site Prefab
d. 1S'Story = ❑ Other(please specify):
e. 2nd Story=
f. '/z Story =
g.Total Area=
REQUIRED SUBMITTALS:
AI! of the information must be submitted in order for your application to be processed:
Not
Enclosed A licable
❑ Permit A lication
� Pro osed Buildin Plans
❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form
❑ Surve meetin all re uirements
❑ ❑ Stormwater Pollution Prevention Plan
❑ Hardcover Calculation s
❑ ❑ Se tic S stem Site Evaluation Re ort
❑ ❑ Access Permit
❑ ❑ Wetland Buffer Im rovement Plan
❑ ❑ En ineered Plans for Retainin Walls 4 feet or above
❑ ❑ Plan Review Fee
❑ ❑ Other
APPLICANT ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Building Department;
. Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no altemative
but to reject it until it is complete;
• Acknowledges the EscrowAgreement is completed and signed;
• Understands some or all of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject
of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our
purpose and intended use of this information is to annually update our records and records of other govemmental agencies
required by law. If you refuse to supply the information,the application may not be issued.
• Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the
Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000
escrow to ensure completion of the as-built survey and all site improvements.
ApplicanYs Signature: � Date: � " � � " ��
- � 8�31�T�N 8�- I�/1 � N K. , I NC�
� Consulting Engineers & Surveyors
" 2638 Shadow Lane, Suite 200• Chaska, MN 55318-1172
Phone(952)448-�838 � Fax(952)448-8505
www.bolton-menk.com
January 30,2Q12 �ONO CQPY
City of Orono
Attn: Melanie Curtis
PO Box 66
Orono, Mn 55323
RE: Zoning Application t2-3545
2807 Casco Point Road House Addition
Dear Melanie:
As requested, we have reviewed the submittal package, dated January 20,2012, for the proposed house
addition at 2807 Casco Point Road. Based on our review,we offer the following comments for your
consideration:
1. This project will disturb more than 100 cubic yards of material. Therefore,a Storm Water
Pollution Prevention Plan (SWPPP}must be submitted for review in accordance with Sec. 79 of
the City Code. The minimum$2,000 sediment and erosion control financial security should also
be required of the owner for this permit.
2. Hardcover calculations must be submitted demonstrating compliance with the City's Hardcover
requirements.
3. Existing drainage patterns need to be maintained.
4. The applicant will be required to obtain a Minnehaha Creek Watershed District permit for erosion
control. A copy of the permit should be submitted to the City after MCWD approval.
Please contact me if you have any questions or need additional information.
Sincerely,
BOLTON&MENK, INC.
�`�� 1 , I ' 1°��
David P. Martini
Principal Engineer
DESIGNING FOR A BETfER TOMORROW
Bolton &Menk is an equal opportunity employer
i
_ _ �., __._ ,_ T
�' �lan �e�iew �l�eckiest �or [Vevv St�uc�ure� / Ad�itio��
..� _ _. �. ,
�� � �
l
�� ..
Address/ PID/ Legal: _ �'` ' � , ` ' ����' �° `�% � � -
Description of work: ���✓`��� ���
_ �
' �` �� ��
Septic review by: t��; y!k � � Date Appeoved: • ���� -��'
Zoning review by: Date Approveel:
Building review by: ��,�� ���-���- Date Approved: � ' �' - � t �_
Grading review by: Date Approved:
Zoning File#: ���� � Resolution #: Resolution Date:
Zonin District Fire Department Post Office School District
r ;�
�. �,.��
� Zoning: Lot Area �a�e��� ��_� � 4 �
�SF�AC Width: , � Depth:
Survey Submitted: �"'Yes 0 No � Date of Survey: � f ��� � ��� ��
Pro osed Setbacks:
Fr�t(Lake) Rear(Street) ( N S E VI! � ( N S���;; W ) Other Buildings 1Rletland
�ide Si21�'
� � r��i . �,
' � ..; ' d�e�4�4 s��� �� r �� � '��,
Building Defined Height: Building Peak Height: #of Stories Ok?: ❑ YES
FOR A BUILDING VUITH A BASEII�ENT OR CRAWL SPACE: FOR A BUILDING QN A SLAB FOUNDRTION:
' START WITH the distance between the basement floor/crawl START the distance between the slab and the highest
� space floor and the highest roof peak, the fiop of WITH roof peak,the top of the cornice of a flat roof,
the cornice of a flat roof,the deck line of a the deck line of a mansard roof, or the
mansarci roof,or the uppermost point on a round uppermost point on a round or other arch-type
or other arch-t e roof roof
SUBTRACT half the distance between the highest window and SUBTRACT half the distance between the highest window
hi hest roof eak of a itched roof and hi hest roof eak of a itched roof
SUBTRACT the distance between the basement floor/crawl ADD the disfance between the slab and the highest
space floor and the highest existing grade within existin rade within the foundation
the foundation or 10 feet, whichever is less. EQUALS Defined buildin hei ht
EQUALS Defined buildin hei ht
Lot Coverage: `'pf.�� SF � �` o
� h� � /o
Shorelanci District NlCIIiID Permit Received pvera e L�keshore Setback Bluff
� G�'�es 0 No ❑ N/A � � 0 Yes ���No
,,� Yes � No '`�� � Yes � No � N/A � `��
' Permit Number: r: �' `' � � � � � `` Setback:
� ���' �`e�► � ��"�" ���
�� ��
Hardcover�ones Existin Fr��osec� ���iance Required Cl1R 12ec�uired
� 0-75' � , � f ;,Yes ❑ No � Yes � No
75-250' .���•_��� ; r:� � ' '� TYP�(S� ��� Type(s):
250-500' • n
500-1000' �� `���� �
REMARKS (in-house):
;`-
Updated: 09/11/2009
�, z:\forms\plan review checklist.docx
�
��
,
i
, �-*-�--�. .�.��--�,-T�.- � � e _, _._ .._ . .
--�-�:�-.--., :_.__ �. :,.. .. ,.�-��:�-�-�-� ,:�..�..,�...---�•-�. . ..
Fees to be Char ed YES NO
Permit �Y
Plan Review %
�
State Surcharge
Investigation Fee r
SAC—Number of SAC Units
, Sewer Connection
Wafer Connec#ion
Park Fee
Site Inspection
Other(speci�y) I
Miscel(aneous Fees
Calculated By:
S uare Foota e $ er Square Foota e
Basement X = $
15' Floor X = $
"� 2"d FlOOr X = $
Garage X = $
Estimated Construction Value: $ � r�� ��, �`_- E `� �`�f�
Oron� Inspections Required 1lllork I�equiring Separate Permits Requireci State Permits
O Site � Plumbing � Grading / Filling � Well
� Hardcover Removal 0' Mechanical � Fire �' Electrical
sL3'Footing ❑ Septic 0 Water Connection
❑ Poured Wall 0 Fireplace � Sewer Connection
� Foundation Survey 0 Masonry 0 Lawn Irrigation
❑ Radon Rock Bed 0 Mfg.
�0�'Framing ❑ Other(specify)
�Insulation
" As-Built Survey
� Final
�' Other(specify) „
j. ,- i�'-F_ ,��4l:�t�t �a- � C..�
REMARKS (in-house):
Other Review: Reviewed by: Date Approved:
Access:Existing: ❑ YES 0 NO New: 0 YES � NO
� REMA►ft64S (1'O BE NOTED ON PERMIT AND INITIALLED BY PER�OI� PULLING PERMIT) .
(�Or� ��� r.�J �Q� � �'c�• - � 1�` � �--e�-� ��
y, �,��'t�Yt/�G��i C� �� �`,� 1�� ��E� 6 - - --
�
� Updated: 09/11/2009
� z:\forms\plan review checklist.docx
�
ta
�
�
DATE TIME ✓.�,'�
CITY O�ORO�Nb CALLED IN 1���
INSPECTION NOTICE SCHEDULED
PERMIT NO. 2�(Z -VOIU�{'' COMPLETED
ADDRESS �g�� �� P� f�C,1
OWNER TELEPHONE NO.
CONTRACTOR
>: DESCRIPTION T ��- ( � . Ll YV
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FiLLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
O ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
J �n_, NV�
O 1�� f '
�. • � � � V Cd�-�1�
�
O
�
ti
�
Q
�
Z
W
�
W
�
j
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK&PROCEED '-; ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR '-� CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �95Z� Z49-46��
Owner/Contractor on site:
Inspector.
White Copyllnspector's File Canary Copy/Site Notice
October 2012
" ,%� ��NO', City of Orono
� ; � �f Hardcover Calculation Worksheet
��:� ��
RECEIV �ESH°�j Property Address 2807 CASCO POINT ROAD (JOHN BAILEY)
DEC 18 2012 PrePafed bY �AL ARCHITECTS LTD.* Dateii/3o/lz
BASED ON AREA TAKE-OFFS BY GRONBERG &ASSOC. (10/9/12)
CiN oF c�'f7t�ater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5
1. EXISTING HARDCOVER (AS-BUILT)
In the following table, identify all items of existing hardcover on the property, keyed by letter to
Certificate of Survey (survey must accompany this form). Use as many lines as necessary to
accurately depict existing hardcover status of the property.
Key to Hardcover ftem (Describe) Length x Width Total
Surve S uare Feet
Exam le Gara e 24'x 30' 720 S.F.
A HOUSE 2180 S.F.
B SCREENED PORCH 28C S.F.
C GARAGE 496 S.F.
D PAVER DRIVEWAY & WALK 1095 S.F.
E LAKE-SIDE STOOP 45 S.F.
F HOUSE ENTRANCE 44 S.F.
G GARAGE ENTRANCE 7 S.F.
H B�cK 12 S.F.
I DECK 107 S.F.
� DECK AND STEPS SERVING DOCK 431 S.F.
K STEPPING STONES 23 S.F.
L ROCK BORDERS 159 S.F.
M RETAINING WALLS 108 S.F.
N S.F.
O S.F.
P S.F.
Q S.F.
R S.F.
$ S.F.
T S.F.
U S.F.
V S.F.
1 Total Existin Hardcover 4993 S.F.
Excludable Hardcover:
RETAINING WALLS 108 S.F.
FIRST 100 S.F. OF SPACED WOOD DECK 100 S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover 208 S.F.
3 Net Existin Hardcover Subtract line 2 from line 1 4785 s.F.
4 Total Lot Area 26623 S.F.
Existing Hardcover Percentage [ (3) = (4) ] is qo
Address: 280 7 CAICo Po��+✓r R�AD �JOpit,/ B�i�.EY� � Date: /O- 9-i2
Prepared by: GR a�/9fR G �l �1 S�d'OC iA 1"f!'. /ivC.
HARDCOVER CALCULATION WORKSHEET '
SETBACK�ZONE: (CIRCLE ONE) 0-75' 75-250'250-500' S00-1000'
EXISTING HARDCOVER IN ZONE
A. Nouse x = S.F.
Length Width -
x = S.F.
x = S.F.
B. Garage x = S.F.
C. Driveway x = S.F.
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck f STEIJ x = 5'.�/ S.F.
x = S.F.
F. Landscape x = • S.F.
Underiain x = S.F.
By Plastic x = S.F.
G. Retaining Walis RO cK WAGt x = �1/ S.F.
H. Other /r�Ck BaR D ERJ x = ' �'� S.F.
1'7-Ei"�►�rvG ITo.v�'S S
TOTAL HARDCOVER IN ZONE - SZ / S.F. A
TOTAL PROPERTY AREA IN ZONE - i D i82 S.F. B
A S 2/ + B �4i /8Z x 100 = ^'-S. /2 %
PROPOSED HARDCOVER IN ZONE (including existing hardcover to be retained)
A. House x = S.F.
Length W idth
x = S.F.
x = S,F.
B, Garage x = S.F.
C, Driveway x = S.F.
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x _ _ � S,F.
G. Retaining Walls x = S.�.
H. Other x = S.F,
TOTAL HARDCOVER IN ZONE - S.F. A
TOTAL PROPERTY AREA IN ZONE -� S.r=. B
A + B x 100 = �-- %
-21 -
. ' .
Address; 2 8 O 7 CA 1'c� P o�NT` RO�10 �TaN�/ BA/CFY) � Date: /O -9-/2
Prepared by: ('rR GN�Ck G t AII'O C/A TE1'� /NC.
HARDCOVER CALCULATION WORKSHEET
SETBACK�ZONE: (CIRCLE ONE) 0-75' 5-25 '250-500' 500-1000'
EXISTING HARDCOVER IN ZONE
A. Nouse f PvR CN x ' = 2 �8 O S.F.
Length � Width
NEli/ A�D i7i on/ x = 2 S 6 S.F.
x = S.F.
B. Garage x = `/9� S.F.
C. Driveway f w��'`� ���vERS) x = /D 95 S.F.
x = S.F.
B.C/CK rroa� ys
D. Sidewalk H�uf E f.�.r���CE x = �/y S.F.
G,�a,t GF EIt/T�t�/�F X = 7 S.F.
B.e�cK /2
E. Patio/Deck x = /4 7 S.F.
x = S.F.
F. Landscape x = • S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Retaining Walls Bo��D fR t x �`3�-�o f �y = 6� S.F.
DoROF+eS ��S
H. Other TrFi��,vG STv�ES x = �8 S.F,
TOTAL HARDCOVFR IN ZONE - yY72 S.F. A
TOTAL PROPERTYAREA IN ZONE Exccua�.✓v c.sfco �o.�r iCGAD R�u� - �6� �!'s/ S.F. B
A `JY72 + B /�� y�i'/ x 100 = Z�.Z o %
PROPOSED HARDCOVER IN ZONE (including existing hardcover to be retained)
A. House x = � S.F.
Length W idth
x = S.F.
x = S.F.
B. Garage x ' = S.F.
C. Driveway x = S.F.
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F,
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Retaining Walls x = S.F.
H. Other x = _ S.F.
TOTAL HARDCOVER IN ZONE - S.F. A
TOTAL PROPERTY AREA IN ZONE - S.F. B
q + B X100 = %
-21 -
� .
' • : • •
1 •
emo
To: Finance Department ��
� I I
From: Christine Mattson Plannin Assistant �
, 9 �
CC: Street File
Date: 3/5/2013
G/L: 101-22205
Re: Escrow Refund
Building Permit #2012-00194 pertaining to a screen porch addition is complete. The
Applicant, John &Patty Bailey, has requested a refund of their$2,500 escrow.
The as-built survey was reviewed in-house.
The following is attached:
• Escrow Refund Request
� Original signed escrow agreement
� Copy of cash register receipt showing escrow amount received
Mail to: John & Patty Bailey
2807 Casco Point Road
Wayzata, MN 55391
w:�.street files\casco pt rd�2807�escrow refund memo 2012-00194.doc
I �
BUILDING PERMIT ESCROW AGREEMENT
Orono Building Permit#2012-00194
ZONING APPLICATION ESCROW AGREEMENT
12-3545
AGREEMENT made this�day of C i t , 20��y and between the CITY OF ORONO,
a Minnesota municipal corporation ("City") and John Patty Bailey ("Owners").
Recitals
1. A building permit application has been filed for a screen porch addition located at
2807 Casco Point Road the ("Subject Property"), as more fully shown on Exhibit A, attached hereto..
2. Owners request the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review .
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit $2,500 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the
Owners would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the work (including planning,
engineering, or legal consultant review) associated with building permit #2012-00194 & Zoning Application
12-3545 if compliance with the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred by the City exceed the amount in escrow, the City shall have the right to certify t u ,paid balance to the
subject property pursuant to Minn. Stat. §§415.01 and 366.012.
�
f
CITY:,-�ITY OF ORONO OWNE,�'� ;
+' '1, � /
I 1 � Ih, { Y �� C C
By: .I � I� � :� �' ��
�ts. t ' � �/�'�� ���t�:..��� \_..1 u '"+r � �,���\ � .. ��.
�- _ � �����y r��� c�� 'cf- ���
In�e�ira�Us�Q�`�� _ ��.�"�rtgit�n�'P�arirf�ri� : r�'��t�..��!�.�.f�.,���`.�� ..��[;�apyta%:���
( r
BUILDING PERMIT ESCROW AGREEMENT
Orono Building Permit#2012-00194
ZONING APPLICATION ESCROW AGREEMENT
12-3545
EXHIBIT A—Legal Description
LEGAL DESCRIPTION OF PREMISES: •
Lots 123 and 124, �
That part of Lake Shore Avenue, vacated, lying between the extensions across i�
of the Southeasterly iine of Lot 123 and the Northwesterly iine of Lot 123;
That part of Lake Shore Avenue, vacated, lying between the extensions across it
of the Southeasteriy line of Lot 124 and line extending from the most Westerly
comer of Lot 124 to the most Northeriy comer of the tract of iand across from Lot
124 on the opposite side of Lake Shore Avenue as designated and defined in the
instrument of dedication on the plat of Spring Park
That tract of land across from Lot 123 on the opposite side of Lake Shore
Avenue as designated and defined in the instrument of dedication on the plat of
Spring Park;
That tract of land across from Lot 124 on the opposite side of Lake Shore
Avenue as designated and defined in the instrument of dedication on the p�at of
Spring Park;
That part of Lot 126 described as beginning at the Northeast comer thereof,
thence Vlfesterly along the Northerly fine thereof 20 feet, thence Southerfy
parallel to the Easterly line of Lot 126 a distance of 38 feet, thence Easterly to a
point on the Easterfy line of Lot 126, distant 38 feet Southeriy along the Easterly
line of Lot 126 from the Northeast corner of Lot 126, thence Northerly along the
Easterly iine of Lot 126 to the point of beginning;
Spring Park
� '
APPLICATIUN ESCROW AGREEMENT
Zoning Application#_L� - ��
AGREEMENT made this 18th day of Januarv , 20 12 , by and between the CITY OF
ORONO,a Minnesota munic:ipaf c:orporation("City'}and
7olm&Patq°Bailey,2807 Casco Point Road,Orono,l�1N ii391
[a corporation—opfionalj(`Applicant"}.
Recitats
1. Appfirznt has fited Zoning App(icafion# f � -3� formally requesting the City to
review plans for SCI2EE:"vt:D I'ORCH.�DI)ITI�� FOR JOI I?�ANI)P.�TT�'B.aILb1'
located at �d7 Casc,�o Point Road,Orono,hiN 55391
the"Subject Property)as more fully shown and descxibed on Ezhibit"A"attac�ed hereto.
2. Applicant requests the City to review said plans which requires City approval including
Variance Application
3. The City is willing to commence its review of the apptication and incur costs associated with said
review only if the Applicant estabfishes an escrow to ensure reimbursement to the City of its costs_
NOW THEREFORE,THE PARTIES AGREE AS FOLl.OWS:
1. DEPOSR OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Appficant shall deposit$ ?5(�.00 with the City. Ati accrued interest, if any, shall be paid to
fhe City to reimburse the City for its cost in administenng the escrow account. •
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for aA out-o#-pocket costs tl�e City has incurred (indudmg ptanning,engineering,or legal consultant review}or will
incur in meeting with the Applicant, reviewing the plans, and preparing agenda packet material for City Council
review of applicafion#�2 - �� ' . Eligibie expenses shall be consistent with expenses the
Appficant would be responsible fw under a zoning and subdivision application_
3. MONTHI.Y BILUNG. As the City receives cortsultant bills for incurred costs, the City wifl in tum
send a bill to the Applicant_ Applicant shall be responsible for payment to the Ci1y within 30 days of the
ApplicanYs receipt of bill.
4. DtSBURSEMENT FROAA ESCROW ACCOUNT. in the event that the Applicant does not make
payment to the City within the timeframe outtined in#3 above,the City may draw from the escrow account without
further approval of the Applicarrt to reimburse the City for eligible expenses the City has incurred. The City shall
notify the Applicant of such draw and the nature af the expense for which the reimbursement is being made. If
the Escrow amount falls below 75% of the original escraw amount the Appl�cant shall deposit additional sums as
directed by the City,or the City shall discontinue all review.
5. CLOSING ESCROW. The Balanc;e on deposit in the escrow, if any, shall be retumed to the
Appiicant when the review has been completed.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Applicant, or if the eligible
expenses incurred by the City exceed the amount i� escrow, the City shall have the right to certFfy the unpaid
balan the subject property pursuant to Minn. Stat.§§415.01 and 366.012.
CITY: , �O O APPLICANT � ��y�A I� .�
, /:�
By. By:
Its: Its: �u�!'!e� ►'
-10-
REGEIV�D
JAN 18 20?2 . �
� �IT������(�I�G�
' ' CITY OF ORONO PERMIT NO.: 2012-00044
2750 KELLEY PARKWAY
ORONO, MN 55356- DATE IssuEn: OU18/2012
952 249-4600 FAX: 952 249-4616
ADDRESS : 2807 CASCO POINT RD
PIN : 20-117-23-32-0014
LEGAL DESC : SPRING PARK
: LOT 123 BLOCK 000
PERMIT TYPE ; ESCROW FEE-APPLICANT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-APPLICANT
NOTE: THIS$2500 ESCROW IS TIED TO ZONING PERMIT APPLICATION#12-3545
APPLICANT ESCROW FEE-APPLICANT 2,500.00
BAILEY, JOHN&PATRICIA TOTAL 2,500.00
2807 CASCO POINT RD.
WAYZATA, MN 55391-
OWNER
BAILEY,JOHN & PATRICIA
2807 CASCO POINT RD.
WAYZATA, MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ / / /
Applicant Permitee Signature Date Issued By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
�v , _.DAT TIME �
CITY OF ORONO CALLED IN 5 '��
INSPECTION NOTICE SCHEDULED ' ��Z u�;�
PERMIT NO.ao�a- oo�9 `� COMPLETED
ADDRESS aCS�� 7 ��S LD �" ��
OWNER TELEPHONE NO. ��a 3�� 8��`�
CONTRACTOR �J�
� DESCRIPTION �r� � �'1=.���
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLINC�
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLAND�
y ❑ FRAMING ❑ MECHANICAL FINAL
O O TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
C
o �t7V ti � CO�`� �� � � � �
�
CC ,�/l-�r �l :��.: � o�
O
�
� �SC�✓V� t�-�'-�
Q
Z '�� � ..'1.ot, V�� ,�-I`�
W
�
W
�
�
GW �l4WARKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
� ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WlLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR '�CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (g52) 249-46��
OwnedContractor on site:
Inspector. / .
White Copy/lnspector's File Canary CopylSite Notice
D T TIME �/
CITY OF ORONO CALLED IN ,� Z � Z
INSPECTION OTICE SCHEDULE� �
PERMIT N � – � OMPLETE <
ADDRESS
OWNER TELEPHONE NO �3g � �
CONTRACTOR
>; DESCRIPTION �t —`� �
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAI
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECT�ON
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
0.
�
�
O
�.
�
O
�
ti
�
Q
�
Z
W
�
W
�
�
d
W WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALIINSPECTOR
❑ INSPECT�ON REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �95Z� 249-46QQ
Owner/Contractor s' :
Inspector
�
,
Whit � pyllnspector's File Canary CopylSite Notice
�� DATE TIME "
CITY OF ORONO CALLED IN '>S' �
INSPECTION NOTICE SCHEDULED N'��Co /��Q� �t�,-�
PERMIT NO. 4����� �U��� COMPLETED
ADDRESS ��� 7 > `
,
OWNER TELEPHONE NO.
CONTRA � OR ��,����� [��`� '� L���� `�
�%.�'� — ,�G"ur��:�' ,o�� ��`�3
� DESCRIPTION �
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
v ❑ PLUMBING RI ❑ SEPTI FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU: YES_NO
� COMMENTS:
�
W
C
�
�
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
W� �IORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK 8�PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑ CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WILL RETURN ❑ CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952� 249-4600
OwnerlContractor on si,e:
Inspector. �n/ l -� �
White Copyllnspector's File Canary CopylSite Notice
v-� DAT TIME V
CITY OF ORONO CALIED IN � �
INSPECTION NQTICE SCHEDULED �— �7--�—
PERMIT NO. ��� - �COMPLETED
ADDRESS
OWNER T LEPHONE NO. �� � �
CONTRACTOR / �(J�-
�; DESCRIPTION
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� � FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNOATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
J �`� � ��i -,YC.:J C� '�
O
�
�
� � - '-�-��sL C.� !.� `'� s � f-- ' �, ��
W
� S
Q
�
z
W
�
W
�
�
d
W� �WORK SATISFACTORY:PROCEED f_l PROJECT COMPLETE
W ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALI FOR REINSPECTION TEMPORARY
� BEFORECOVERING
PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETUFN ❑CITATION ISSUED
❑STOP ORDER POSTED.CAIL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� 249-46QQ
OwnerlContractor on site:
Inspector. � _ ��� �
White Copy/lnspector's Fiie Canary Copy/Site Notice
� ��� � DATE TIME
CITY OF ORONO �-ED IN 9-�
INSPECTION NOTICE /�!L SCHEDULED 2(o-/,Z- -a—
PERMIT NO. ���7 T COMPLETED
ADDRESS �O� -� C�� ��/!/I�' l��- '
OWNER TE PH NE NO. ��� o� �a �T�
CONTRACTOR ��
� DESCRIPTION :/`�I� ��� �
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS: -
a ld- .� �I� ti'��� � j
,
o � Cl `� c' c' -�-�-'�' � '� C�`�C�`E �� - �`�
� !� � c� � ' v' � CT � e �. �c j r C� 7 �'�-�ti
� /� ' c� � ��L)�� 'f �� �c����'1� .
W
�
Q
z �153 �, ,, i �- �e � � �z, c`� C
� � �� v I/e C� l.���l��
� � ' C��U� k�^ � � � U /� �
� ❑WORK SATISFACTORY:PROCEED `�PROJECT COMPLE�TE� C�
W ❑CORRECT WORK 8 PROCEED ❑`ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITION WITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN ❑ CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
� INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. (952� 249-46��
OwnerlContractor on site:
Inspector.
White Copyll�spector's File Canary CopylSite Notice