Water Intrusion Repair Project and Upper
Level Flashing and Trim Project
PROJECT 29-11-003
Jobsite Address
Peggy Kadlec
2726 Caroline Avenue
Wayzata, MN 55391
August 17, 2011
� Integrity
Home I'ro�ects, Inc.
Project#29-11-003, Permit Scope of Work
Peggy Kadlec
2726 Caroline Avenue
Wayzata, MN 55391
August 17, 2011
Water Intrusion Repair Project Sco�e:
DEMOLIT[ON AND S[TE PREPARATION
• Work is planned to be done with deck ledger remaining in-place
o No deck framing or ceiling joist framing is planned to be removed and replaced. If
rotted ceiling joists are discovered, additional costs will be incurred.
• Install temporary structural support walls approximately 3 feet inside and outside of header
repair wall.
0 2x 12 load spreading plate to be set on screen porch tile to minimize stress on floor
• Install dust protection barrier poly on temp walls to isolate work area
• Apply RamBoard floor protection on screen porch tile floor in work area
• Apply Carpet Shield floor protection on interior basement floor in work area
• Remove casing and trim moulding from interior of lower level patio door and side-lites—set
aside for re-use
• Remove drywall from interior wall above lower patio door and side-lites
• Remove drywall from interior ceiling approximately 3 feet in from wall above lower level
patio door and side-lites.
• Remove bilt-rite sheathing from exterior wall above and beside lower level patio door and
side-lites.
� Remove any fiberglass batt insulation that has been compromised by water intrusion
• Remove lower level patio door and side-lites, set aside for re-install.
o Note: patio door frames may be rotted from water exposure. If new doors or door
repairs are required, additional costs will be incurred.
• Remove header, rotted cripple studs and rotted section of plates above and below header for
lower level patio door.
• Remove rotted section of 2x12 rim joist. Anticipate 32" section to be removed and replaced
(2 joist spaces)
• Remove and dispose of demolition materials
EXCAVATION, FOOTINGS, BLOCK, STONE, MASONRY
• None planned
FRAMING/CARPENTRY/INSULATION
• Install replacement section of 2x12 rim joist,#2 or better grade SPF
• Install replacement section of double top plate, cripple studs and upper header plate
• [nstall new header, 2-ply 9 '/4' x 1.75" LVL(microlam)
• Install new mid-span bearing support trimmer studs, one pair is known to be rotten, but plan
to replace both pairs
• Spray all internal wall surfaces exhibiting mold with PCG Pro-cleanT"' and spray all surfaces
exposed to moisture intrusion with MycoDyneT"' mold preventative
• [nstall new bilt-rite sheathing
� Re-install patio doors and side-lites. Butyl seal wrap included
Page 2 of 4
. �
� � Integrity
Hoine I'ro�ects, [nc.
Project#29-11-003, Permit Scope of Work
Peggy Kadlec
2726 Caroline Avenue
Wayzata, MN 55391
August 17, 2011
• Install new R19 wall insulation where compromised insulation was removed. [nstall
insulation around perimeter of patio door RO.
• Install new 4 mil poly vapor barrier where drywall was removed
HVAC
• None planned
PLUMBING
• None planned
ELECTRICAL
• None planned
WALLS& CEILINGS
� Install new ceiling and wall gypsum wallboard where removed for interior access
• Taped and sanded, ready for priming and painting by others
CABINETS AND COUNTERTOPS
• None planned
TRIM-OUT AND FINISHING
• Re-install interior oak trim on patio door and side-lites
• Re-install siding on wall inside of screen porch around patio doors and side-lites
• Caulk siding at door and screen porch trim
o No new siding planned. Assumes existing siding will be re-usable
• Install new flashing and wrap on windows and door to deck above screen porch
o Install new clipped aluminum drip cap flashing on the round-top window and two
quarter-round windows. White drip cap to be installed, painting by OTHERS.
o Install exterior moisture barrier(Tyvek�or equivalent)
o Install butyl window perimeter seal wrap
o Install new 5/4"x 8" Knotty Red Cedar Rabbeted Siding
o Install replacement horizontal and vertical door#2 rough cedar trim with Z-flashing
FLOORING AND T[LE
• None planned
Page 3 of 4
---�.�.�„, __.__, . ���� ��``
. � �: ��,
, ,. � _
� � ,.-
� �� �
, a �____ .
_<,. ., s
_ ��;� /� ' __ -
• . �
� ' ,��� s�e�^;1�• ' ��
�';,�z
�.` , .. , —�,�' � '
�` - -- -- � ' b.��i,
� � . .
a,� ��,., • ��
- �. . �.�P. . ..�,
_ ���--r � � �
- _ - r � �-�,
' y .. � ,;�-'_a,
� �,,,:�, r � �, �.
M_,� �: ' � �`
... � � ,y,
... _ _ �r �
. ` �a
� . „ �� O
,__ . �-��
�
s
r � -�
��s '�c�;�: � �` ��s � ♦
,
',��. •�"�� r` �� w* y,.. � � � (
, . ...
�. .K, . . .,�"� ..:..... 'Tm sA+�1r � ... � .>. . .
"+~�... ..��� .Y�' � ... �,» .. � LA
1� E �
. �,�: � �fe,�[`�Mti7�.A.�, ,. .. .� �
:� �� x�,� � �;�+ � �� �'�' R � �
, . „
� , y,,��,�
. , ��` �',�� �,�z"�
, .;
, . , +
_:"
.. ..,• .._
__._
,��. , .�.�� b,..�.._..�.,....�., ,
� ,� ` . ,, �>.: �: . _ �{ �
f
. . � ti �, �
,
.
� , " .�" _,�, � �, �\ � � •{:: F ..� ��
� ��' '�; ,�� . " ✓ ....�• a�„� M r ' . '� ,�
t _ �,� � �°�u & � � r7�'� '�.�^.' ±
a+�� "`` i.. ; � ��� , E 4� 4' �'+ "�I ' f "�'.
e e� � � �1�, �+�`e ' j� � "# �
n
,�c " t
�a �� �. ' - � ;' , �_ , r • �
,,
*���,� .��� i�. ; � � � -- -.— ,/�-` �'�, n.�2;�t E'°� µ � ... 1• , � _
}��
�"�` �'fi�. ,'s. , �4 � :.re. 'yl� ._.�" �..;.._ '�,.. �i'� ,�� ' �,.{�,!'� E � +�
. . ..
. ,
. n� o � . . �...-....
a� .. � � �� k � �� '� �
� #
{ t
�N�� .. � '�� ' S• � . �. �� � ' . � �
>
��� `. � ...:5 _.:
' �� ` .
M . >. ��.. " .: ' JI�'�" ,
���: > ,. . "� �
� : � a r i� �.... f_. r .1 '�
��`� � � '1► � o�-�w a�
� ,�. ,: .._.w-
u � ,_,..'I
.._ .,. 3;"'"'... �..... , . . . .�._�. .._ ..:_.
J �' ,��
P y s..F
� :;.J• 'w �' . . .. . . d;�
., �
� ���� . . _ _.—�
r�„ . . � ... . . - � � - —
..,, , .�, . _ �•`��".,�,,� �.-- -- —
, �
��� � ����
I �
�
*
��µ��
c"'�.
T- �
___ _ .. .. .� - r _ .. . --•
� �:
I
4
; F �
i& :_.�. , ._. ..,_ f