Loading...
HomeMy WebLinkAbout2014-01488 (new structure) � . CITY OF ORONO * Z 0 1 4 - 0 1 4 8 B * 2750 KELLEY PARKWAY DATE 1SSUED: OS/27/2015 ORONO, MN 55356- 952 249-4600 FAX: 952 249-4616 ADDRESS : 2490 CARMAN ST PIN : 20-117-23-12-0065 LEGAL DESC : LEHMAN LAGOON : LOT 2 BLOCK 1 PERMIT TYPE : NEW STRUCTURE PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : SINGLE FAMILY ACTIVITY : 101-SINGLE FAMILY HOUSES,DETACHED VALUATION : $ 965,000.00 NOTE: SEPARATE PERMITS REQUIRED:PLUMBING,MECHANICAL,FIREPLACE,WATER CONNECTION,SEWER CONNECTION, LAWN IRRIGATION,LANDSCAPING,ELECTRICAL(STATE) NOTE: PRIOR TO THE START OF FRAMING AN AS-BUILT FOUN�ON SURVEY MUST BE SUBMITTED AND APPROVED BY THE CITY OR A STOP WORK ORDER WILL BE ISSUED: INITIAL: , /j/ NOTE: PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY AN AS-BU[LT SURVEY IS REQUIRED TO BE SUBMITTED AND APPLICANT PERMIT FEE SCHEDULE 6,070.84 PLAN REVIEW 187.91 STONEWOOD,LLC STATE SURCHARGE(VALUATION) 482.50 153 E LAKE STREET WAYZATA, MN 55391- S.A.C. 2,485.00 (612)462-4000 SEWER PROJECT FEE 6,700.00 Minnesota State License#: BUIL-BC594315 TOTAL 15,926.25 Payment(s) CHECK 13474/13� 15,926.25 OWNER Lakeshore Holdings LLC 153 E LAKE ST WAYZATA,MN 55391- AGREEMENT AND SWORIY STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. A(I provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of I80 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. :---�.-1-� s-- Z� � � ,�7, lS ',Applicant Permitee Signatur ' Date Issued y Signature Date Date Time Inspector Inspedion Type Stat H Permit# Address Permit Type Property Type Construction Type � , 1 ,, ' ' ...,........�_ ---_.._� _� __� � .m____. _. _.. _ _ .._._ �..-- • •r r . 1 • • ' a t ' x � r " 'Escrow Refunded ' 2016-00417 '2430 Carrr�an St Escrow Fee-Tied to Building Permit j Residential Escrow Fee-Tied to Build�ng Permit 11l23/2015 i2 00 AM METJ Mechanicai Air Test P Y 2015 01495 243D Cartnan St Mechanical Residential Gas Line Only ' , _ _ _._ _._ .. 11I2312015 12 00 AM METJ Mechanical-Final Y 2015-01495 2490 Carman St Mechanical Residential Gas L�ne Only _.. _._ _ . __ _... 2l912016 12 00 AM ROGP Mechanical Final REENSPECTION P Y 2015-01495 2490 Carman St Mechanical Residential Gas L�ne�nly„ . _ _...__ _ �._ r _ _....� 2I10I2016 .12:00 AM MEfJ Mechanical-Final Y 2015-Q1495 2490 Carman St Mechanical Residential Gas Line Only - . _....._. _.. .-- METJ �Mechanical-Final REIPkSPECTiON Y 2015-01495 2490 Carman St Mechanical ¢Residential Gas�ne Only _ e . _._ ._ __._� e ,. _. _ e.. .. 8/26/2015 't2:00 AM BRAT Set&Seal-Done By Public Works P Y 2015-01077 2490 Carman St Water Meter-Residential Residential Water Meter-Residential � ,. . � . . .. <. _�_—. 8/24✓2015 '12:00 AM METJ I+Aechanical Rough In P Y ,2015-U0996 2490 Car€nan St Mechanical _ Residential Mechanical-Multiple _ __... _ _ �. _...__.. 8I24f2015 12 00 AM METJ Mechanical-AirTest P Y '2015-00996 2490 Garman St Mechanical Residential Mechanical Mult�ple - _ _____ � __. ._.... �_... __._... �. e - - . �__ 213l2D16 12 00 AM METJ Mechanical-Final P Y ,2015-00446 2490 Garman St Mechanicai Residential Mechanical Multiple _..... _......._., _._ 8I2&12d15 12A0 AM .METJ Mechanical-Rough In P Y 2D15-60370 2490 Carman St Mechanical Resideniial Fireplace-Gas _ _ __ ___, _ �.. . ___-__ 2l9120t6 12.00 AM R(7GP Mechanical-F�ir Test P Y 2015-00970 2490 Carman St Mechanical Residential Fireplace Gas -- - --- �_ 2J912016 12 00 AM ROGP Mecharncal Final P Y 2015-00970 2d90 Carman St Mechanical ,Residential Fireplace-�as .. . __ ... _ � __ _ _. __ _ _. . _ 2110(2016 12 00 AM METJ Mechanical-Final ��P Y 2D15-00970 2490 Carman St Mechanical Residential Fireplace-Gas � _....._ e . __..... . _ _ 815120t5 12.00 AM ,METJ Plumbing Rough In +P Y ,2015-00732 2490 Carman St Plumbmg _ eResidential Fixtures-Multiple . _..- -.._.. . ._ 9f1812015 12 00 AM ROGP Plumbing Final P Y 2015 00732 249�Carman St Plumb�ng Residential Fixtures Muitiple __� _ _ <_ 811272015 12 00 AM METD Plumbing AirTest � �P Y .2015 00732 2490 Cartnan St Plumbmg Residential Fixtures Multiple � _ �_ _ _.. � � , _ ti3;2016 12:00 AM 'METJ Plumb�ng-Final P Y 2015 00732 249D Carman St Plumbing _ Residential Fixtures-Multiple j � _... . 8I5l2�15 12 00 AM SOBR Final P Y 2015-00721 2490 Carman St Sewer 8 Water Res�dential Connection _. , _ 5128t2015 12 DO AM METJ Tree Removal-Pre Inspection P Y 2015-00677 2490 Carman St Zoning Permd 'Residential Tree Re€r�oval Withm 0 75 ; _ , _ ._ ,--- � _ ___ _ _ _� — � Tree Removal-Final Inspection i 2015-00677 2490 Carman St Zomng Permit „ �Residential Tree Removal Wthin 0-75 _ -� �6/312015 12 00 AM METJ Footing(or Rebar) �P Y ,2014-0148$ 2490 Carman St New Structure Residential Smgle Family ; . . e _ . �&10f2015 t2 00 AM METJ Radon Rock Bed(Poly) P Y 2014-01488 2490 Carman St New Structure Residential Single Family � . __ _. �6C8J2015 12 OD AM METJ Poured Wall(Foundation)_ P Y 2014-01488 2490 Car€nan St New Structure„ Residential Single Family �� _ _ _ __ _,_ � 6;24l2015 12 00 AM CMAT Foundation Survey B/4 Framing +P Y 2014-01488 2490 Cartnan St New Strudure Residential Single Family ____ ti __ � _—. 8127f2015 12 00 AM METD Framing 'P Y 2014 01488 2490 Carman St New Structure ,Residential Single Famdy _.......... _.__.__ . - ........... ._. ' .._.. .i 9f8l2015 12 00 AM METD Insulation P Y 2014 01488 2490 Cartnan St New Structure Residential Single Famdy � _� _.._.... . __._ _...._�..___ _ _____ ___ ... _. 2/1 012 0 1 6 '12:00 AM AAETJ Final i F Y 2014-01489 2490 Carman St New Structure Residential Single Family _ � , __,- . _ ... _.__ 9115/2016 12 00 AM CMAT As-8uilt Survey P Y '2�1d-01486 2490 Carman St New Structure Residential Single Family � _� — e _. Escrow Refund Requested 2014-01488 249D Carman St New Structure Res�dential Sin le Famd .. g y . _.. Escrow Refunded 201401488 2490 Carman St New Structure i Residential Single Family � < _.. _.._ _.. ,.. _. �1J10l2016 12 OU AM METJ Stlt Fence(Installed&tnspected) P Y 2014-01488 2490 Carman St New Structure Residential Smgle Family � .. e � .. __ 611612015 '12:00 AM :METJ Foundation Water Proof(Drain Tile) P Y 2014-U1488 2490 Carman St New Structure Residential Single Famity � _.._. _ — > - - 10/812015 12 00 AM METD Lath P Y 2014 01d88 2490 Carman St New Structure Res�dential Smgle Famdy _ . 10/20120i5 12 00 AM METJ �Other P Y 2014-01488 2490 Carman St New Siructure Residential Single Famdy _.. __ _ ..___.� _ < _ __ . 2/1512016 12:00 AM METJ ,Final REINSPECTIgN P Y 2014-01488 2490 Carman St New Structure Residential Smgle Famdy City of Orono � CERTIFICATE OF OCCUPANCY cp�,� � TEMPORARY CERTIFICATE � �A Building Address: 2490 CARMAN ST PIN: 20-117-23-12-0065 Legal Description: Lehman Lagoon Block 1 Lot 2 Zoning District: Permit No: 2014-01488 Work Activity: Single Family Construction Type: 2007 MSBC Occupancy: IRC-1 Occupant Load: Fire Sprinkler: N Applicant: Stonewood, LLC Applicant Address: 153 E Lake Street City, State,Zip: Wayzata,MN 55391- Owner Name: Lakeshore Holdings LLC Owner Address: 153 E Lake St City, State,Zip: Wayzata, MN 55391- THE FOLLOWING ARE NOTED AS INCOMPLETE OR MISSING. THESE MUST BE CORRECTED OR COMPLETED AND REINSPECTED WITHIN THE SPECIFIED NUMBER OF DAYS OR THIS CERTIFICATE WILL BE VOID Failure to correct these deficiences will cause occupancy violation citations to be issued To be completed by July 31,2016 * As-built survey to be submitted and approved showing: - All exterior improvements completed(driveway,etc.)and shown on as-built survey - Final grading completed and shown on as-built survey - Erosion control to remain in place until sod/vegetation is established I her agree to ak th ove orrections and to call for reins e ti n with ie time allowed: � er/Contractor � Date � �ZZ! <o m mg icia Date �PLAN RE�/IEWiI CHEC�CLIS� �'OR IVEVI� STRUCTIlI�ES / 14DDITiOIVS Address/Permit Number: � '� ����'�. �L'�� B ��� Description of wrork: i v � ���� p� � Septic review by: Date Approved: Zoning review by: Date �4pproved: Building review by: �....-- Date Approved: �° � '� � �°� Grading review by: Date Approvecl: /3 /��3 �� 1 - 7�-�t+�. Zoning District: � �A � Zoning File#: t - -�a� Reso#: � Reso Date: �0'��° I .� :-,,, ". Zoning: Lot Area: SF/AC 1Midth: Lot Coverage ���I - -' � SF _°�o 1; Survey Submitted: �Yes 0 No Date of Survey: �� � Z.�' �� Revised date(?): � '�'�� Pro osed Setbacks: F�t(Lake} ar(Street)�P ( N S E W ) ( Rl S E V1l )r pther Buiidings � ���d �� Side l�" Side d6 ° �� ��& � �e 1�� Defined Height: Peak Height: FFE: �`� �k' FFE minus 6 feet= �� ';�_� (Existing Contour� , . ,- c c t/ Peeimeter(linear feet) _ •_-%°��" 50°/a -� #of Stories �� Ok? �YES �-�- , �; �' �; s� FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: ' '� �" " The distance between the lowest FOR A BUILDING ON A SLAB FOUNDATION: START WITH proposed floor(of the basement or crawl space)and the highest point of the roof. START WITH The distance between the top of slab and �- the highest point of the roof. ' If you have a... If you have a... . GABLE OR HIPPED ROOF(no . GABLE OR HIPPED ROOF(no windows): Subtract half 4he windows): Subtract half the distance distance between the highest point between the highest point of the roof of the roof to the low point of the to the low point of the corresponding ,�` SUBTRACTION corresponding gable or hipped roof SUBTRACTION gable or hipped roof �, �%�; (BASED ON ROOF . GABLE OR HIPPED ROOF(with (BASED ON . GABLE OR HIPPED ROOF(with � ` n'PE) windows): Subtract half the ROOF TYPE) windows): Subtract half the distance distance between the top of the between the top of the highest highest window and the highest window and the highest point of the point of the roof roof o ALL OTHER ROOF TYPES(flat, • ALL OTHER ROOF TYPES(flat, mansard,etc):No subtraction. mansard,etc:No subtraction. ADDITION Add the distance between the top of slab - SUBTRACTION Subtract the distance between the (BASED ON and the highest existing grade adjacent to ; � ) (BASED ON EXISTING basemenUcrawl space floor and the EXISTING the foundation. GRADES) highest existing grade adjacent to the GRADES {� �,v foundation OR 10 feet(whichever is less). EQUALS Defined building height "t`� EQUALS Defined building height f��>., �.'f. ����'� Shoreland District MCVUD Perrr�it Received �vera e Lakeshore Setback Met? �luf� � Yes 0 No � N/A � Yes No �Yes 0 No �es � No � N/A Permit Number: Setback: Stormwater Quality Existing Proposed ��riance f�equired Cl1P Required O�aerla District Tier Hardcover Flardco r �� � Yes C] No � Yes No � ��� Type(s): Type(s): � �� �� Updated: January 2013 �Q�r�� ����'S `y 6 GQ S �.�. ��,�� v:\forms\plan review checklist 2013.docx � Z�•a�� �,��+ ' ' �- � � � � �. � ,, � µ �, ,M. �;i, �'�`'i� . �'� `�" �„��Gi�:'� '�i; �'�u�`�' ,.� ,.1 .,. ��..��...�£`�.+.�'` -. , . . . . .. . . .. REMARKS (in-house): ��)� � ��i �� ����- C��� U � Fees ti .�- �p,,��'7 �O Permit � Plan Revievv State Su�charge Investigation Fee SAC-Number of S� Other(specify) � S uare Foota e Basement X i 151 Floor X = v 2nd Floo� X = $ Garage X = $ � Estimated Construction Value: $ ����'���°'��� Orono Inspections Required Work Requiring Separate Permits Required State Permits 0 Site Plumbing � Grading/ Filling 0 Well �'' 0 Hardcover Removal �Mechanical Q Fire .�Electrical Footing � Septic �Water Connection ,�Poured Wall �Fireplace �'�Sewer Connection ;, ,,�` Foundation Survey � Masonry �Lawn Irrigation � Radon Rock Bed ,� Mfg. �;;�� ����'� �. � Framing 0 Other(specify) � ,�I Insulation � ,,� As-Built Survey � Final � Wetland Buffer 0 Other(specify) '� REMARKS (in-house): Other Review: Reviewed by: Date Approved: �! Access: Existing: 0 YES � NO New: 0 YES � NO � ,� � OFFICIAL REMARKS -TO BE f�Q�E� �R! �ERMIT AND INITIALLED > ,'� � 7 Updated: January 2013 v:\forms�plan review checklist 2013.docx _.� ` , ,. - ,�q ,{�� ���� ._ � ���!s'm T.. .�.�3�`r�_:.-�7`,.'rJ.fF�:5CA`C,vf�e����-5-��*:x�'��'p{,+��. . . . . . . . .. , . . . City of Orono Building Permit Application for New Structures or Additions Mailing Address: � �O � �Q�O PO Box 66 Permit number: _ Crystal Bay, MN 55323-0066 Date received: /— Street Address:� Received by: � ,� 2750 Kelley Parkway Plan review fee: � . / F �` Orono, MN 55356 � l�xFsxo�``` Main: 952-259-4600 Total Fee: � Fax: 952-249-4616 www.ci.orono.mn.us �(',�l ���J� This application form must be completed in full and all required informati ust e su mi , Incomplete applications will be returned. (Please 'nt) l-�`-`'� ZS GENERAL INFORMATION: °-,,T� � ,l.z=�� � ` �Z� . Job Site Address: ���n' � r��� o�' l 7'�3��07`� Will this be a Parade ^{"- � 1 her Display Home? ❑ Yes No N yes,a specia/event permi, �.� l � (_ : � ��,���`� �� ' )days prior to the event. Shutt/e bus service will be required un/ess applicant de� ���� ' � events will not be allowed. CONTRACTOR/APPL Name: � (� State License# � ;, ��j r j"1 `'C _ Expiration Date: Phone: cell j� '" Gl�,Lf-1,� � 1�ovc� Mailing Address: 7 �j � I �, � �.? Cit : �,✓�� „ u ZIP: .S-S I Contact�erson: : i � �l� � Contrac o / Homeowner �c�►cie o�e� Email and/or Fax: , '� �� � �f 1 PROPERTY OWNER INF( f� _�-'""" Name: ,�/ �� �` ,� /' Phone(day): - Ib � '`� •'� ' Address � ,� ,i r � � � � ty: p�y,�w✓� L ZIP: SJ��I'�7 Email and/or Fax �,i � ` �'�. � C�� ARCHITECT/ENGINEER 1� _ - " Name: , �'( �_. Phone(day): �i " (r��� Address: � ` � ' y � � -- �y�f�, ZIP: S S � Q l Email and/or Fax: � �f� �- PROJECT INFORMATION: _--- + ��( (� 1.Type of Project �l�Cl � U ' pe 4. Sewage Disposal& i C�� � � � Water SuPP�Y �New Construction � � � �Addition I� ' ::_-�'" ;_�:: �'ssory Bldg. �Public Sewer , L �� ;-- r � ❑Accessory Building ,_� ��� � ,�, .� � ;� � � � ❑ Relocation ,, � . ' �` ' , - __rcial ❑ Private Sewer �� warehouse ❑Other: (specify) � ���� ���'� _- � _.,,,,, ❑Storage ❑ Public Water **Any earth movement may requfre ❑ Commercial ❑ Other(speciry) MCWD review&permits. ❑ Industrial ❑ Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (speCify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.m innehahacreek.or Estimated Construction Valuation (excluding land) $ � b � C�� —T Packet Last Updated: 04/19/2013 Page 22 of 23 STRUCTURE INFORMATION: 1. Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction p � �� - �f' a. Length(ft.)= 1 _1 � Number of bedrooms- �'Wood/Frame � ���� b.Width(ft.)= � Number of garage stalls: ❑ Masonry Areas in square feet Attached= 7 ❑ Metal ❑ Pole Bldg. c. Basement= � 3�� Detached=� � 7�s_ ❑ ICF d. 15t Story = ❑On-site Prefab e. 2"d Story= � ❑ Off-site Prefab f. '/�Story = �—� ❑Other(please specify): g. Total Area= �� REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed A licable ❑ Permit A lication ❑ Pro osed Buildin Plans �[ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form � ❑ Surve meetin all re uirements 1� � Stormwater Pollution Prevention Plan ❑ Hardcover Calculation s ❑ Se tic S stem Site Evaluation Re ort ❑ 1� Access Permit ❑ Wetland Buffer Im rovement Plan ❑ En ineered Plans for Retainin Walls 4 feet or above Minnehaha Creek Watershed District Permit s � Plan Review Fee ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event th eather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy ' requested, a temporary Certificate of Occupancy may be issued upon receipt of a$10,000 escrow to ensure com ion of the as-built survey and all site improvements. ----� ApplicanYs Signature: Date: � �� Owner's Signature: Date: Packet Last Updated: 04/19/2013 Page 23 of 23 , . 24Q'b C�rr�tr� City of Orono ;�lFotio�., Hardcover Calculation Worksheet ':\,�y ! Property Address: '— C /��►I�l �/�.� f`` A; .�°�C-�-�-'t_�.,,.���-�-$ �; ���,K;,,��a�: Prepared by: ��I'� D �I ���� Date: Z, ,t� 2.0 j S Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 � Step 2: PROPOSED HARDCOVER . In the following table, identify all items of proposed hardcover bn the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage se aratel for each ortion. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet Ena le Gara e 24'x 30 720 S.F. A S.F. B S.F. C S.F. 'D � S.F. � E S.F. F S.F. G S.F. H S.F. � S.F. � � S.F. K S.F. � S.F. . M S.F. i � N � I� S.F. � S.F. , P 'I�/� - S.F. Q `� V�Y�li`' S.F. R S.F. S S.F. T . S.F. � ��� �� , S.F. V S.F. W S.F. . X S.F. Y S.F. Z � � S.F. 1 Total Pro osed Hardcover � S.F. Excludable Hardcover See C' Cod� � S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Pro ed Hardcover Subtract line 2 from line 1 S.F. 4 Total Lot Area S.F. Proposed Hardcover Percentage [(3)=(4)] �L��8°� This is an informatron packef regaroing Hardcover. Every elforf has been made to insure the accuracy of the information contained herein;however, i/any information is not consisfent with provisions of the City Code,the Code provisions will prevail. Page 9 of 9 , City ofi Orono Z� ��� ,��oN�� Hardcover Calculation Worksheet ; o � ,,� Pro ert Address: S� �,:l l ;� P Y .L�� L� �.�T--$�-_._��4�0 C I� R Nl � ►`l ''•`����H��a`� Prepared by: � S�--E � Date: r � �__� T Stormwater Quality Overiay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 1: EXISTING HARDCOVER In the following table identify all items of e�usting hardcover on the property, keyed by letter to Certficate of Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setbadc line and calculate hardcover square footage separately for each portion. Surve Hardcover Ibem(Describe) Length x wdth S uare Feet Exam le Gara e 24'x 30' 720 S.F. A S.F. B S.F. C S.F. D S.F. E S.F. F S.F. G S.F. � � S.F. � S.F. � S.F. K' S.F. � S.F. M S.F. N C: � S.F. � � .�i.� ) j� S.F. P S.F. Q S.F. �_ R = . S.F. S S.F. ' T S.F. � S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. . 1 Total Existin Hardcover S.F. Excludable Hardcov�er See Ci Code Sec 78-1684 : S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Existin Hardcover Subtra�t line 2 from line 1 S.F. 4 Total Lot Area S.F. Proposed Hardcover Percentage ((3)�(4)J � � � 5 % (Proposed Hardcover next page) This is an infcxmation packet regarding Haidcover. Every effort has been made to insure the aocuracy of the information contained herein; however,if any information is not consistent with provisions of the City Code, the Code provisrons wil/prevail. Page 8 of 9 �o�o C ITY OF ORONO � y Street Address: Mailing Address: 7elephone(952)249-4600 y G� 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 F t�, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us "�KFsxo� January 30, 2015 Sven Gustafson Stonewood, LLC 153 Lake Street E Wayzata, MN 55391 Re: Building Permit Application#2014-01488 2490 Carman Street On January 16, 2015 the City received an updated survey for the proposed new single family home at 2490 Carman Street. Staff conducted a preliminary review based on the information provided and recommends the following items be submitted or revised in order for your application to be considered complete and for the plan review to continue: 1. Certificate of Survey. The City Engineer has reviewed the survey and made the following comments. Please provide two copies of an updated, full size certificate of survey which meets all of the City's survey standards (enclosed) addressing the comments below. a. Building permit sheet A-3 shows a "grill". It is unclear on the survey if a patio is shown or if it's a contour line. Please clarify. b. All comments are based on the assumption that the driveway easement for 2470 across 2490 Carman way has been granted. Please provide a copy of the recorded easement for the file. ��d ' �N �1�' c. The drainage swale on the east side of the property as shown is adequate, however the neighboring property's grading plan shows a similar swale that is shared by both properties. The shared swale is preferred if agreed to by both property owners. An agreement should be entered into by both property owners prior to the commencement of any grading operations. d. The silt fence as shown should be sufficient, however will need to be coordinated with the neighboring property to the east if construction occurs concurrently. e. The silt fence shall be installed and inspected by the City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. 2. Hardcover Calculations. The property is located in Tier 1 of the Stormwater Quality Overlay District. Hardcover calculations were submitted on the survey. Please have the surveyor prepare hardcover calculations, showing proposed hardcover using the City's hardcover calculation worksheet. Attached is a copy of our hardcover information packet. 3. Separate Permits Required for: Sewer connection 4. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project is $2,500. We acknowledge receipt of$2,500 from Stonewood, LLC for the escrow, but be aware per the City's policy the escrow money will be refunded to the property owner of record at the time of release. PLEASE NOTE: 2015 NEW PERMIT REQUIREMENT: Prior to the commencement of a� exterior/landscaping improvements, i.e. patios,grading,sidewalks, retaining walls, etc., a Zoning Permit is required. January 30,2015 2490 Carman Street Page 2 of 2 Your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. Sincerely, CITY OF ORONO 1�'�"� Christine Mattson Planning Assistant c Sven Gustafson,via email Eric Mercer via email Randy Stern via email Lyle Oman, Building Official enclosures Christine Mattson From: Christine Mattson Sent: Monday, February 02, 2015 10:11 AM To: 'Gustafson, Sven' Cc: 'eric.j.mercer@us.pwc.com'; 'rmsterns@comcast.neY; Melanie Curtis; Lyle Oman Subject: 2490 Carman Street/#2014-01488 Attachments: letter.pdf; Survey Requirements- March 2014.pdf; Hardcover Information Packet-2014.pdf; Sewer&Water Permit-2015 Fees- Updated 01-05-15.pdf Sven, Attached is a copy of the letter and attachments being mailed today. Please don't hesitate to contact us if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway � Orono � MN � 55356 (physica/addressJ PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ `1�' 952.249.4620 � 8 952.249.4616 � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Monday, February 16, 2015 � Christine Mattson From: Adam Edwards Sent: Friday, January 16, 2015 2:34 PM To: Christine Mattson Cc: Melanie Curtis Subject: 2014-01488 2490 Carman St I've completed a grading review of the proposed plans for the permit/property listed in the subject line and provide the following comments: 1.All comments are based on the assumption that the driveway easement for 2470 across 2490 Carman way has been granted. 2.The drainage swale on the east side of the property as shown is adequate, however the neighboring property's grading plan shows a similar swale that is shared by both properties. The shared swale is preferred if agreed to by both property owners. An agreement should be entered into by both property owners prior to the commencement of any grading operations. 3.The silt fence as shown should be sufficient, however will need to be coordinated with the neighboring property to the east if construction occurs concurrently. 4. The silt fence shall be installed and inspected by the City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. 5.A separate utility permit will be required for the sewer connection/reconnection. Adam Adam T. Edwards, P.E. Director of Public Works/City Engineer City of Orono (952) 249-4661 aedwards@ci.orono.mn.us i , R . Christine Mattson From: Christine Mattson Sent: Wednesday, January 07, 2015 1:24 PM To: 'Gustafson, Sven' US• Cc: 'eric.j.mercer@ pwc.com'; Melanie Curtis; Lyle Oman Subject: 2490 Carman treet/#2014-01488 Attachments: Escrow Agreement- Building Permit w Erosion Control 2014- 47.pdf 1�}� Sve n, The application submitted for Carman Street was addressed of 2470 Carman Street; however the actual address for the newly created lot is 2490 Carman Street(PID 20-117-23-12-0065). Please update your records. After a cursory review of the buiiding permit application: • Based on a FFE of 944.85' the lowest level of the home does not meet the definition of a basement. The third story is not a half story therefore the house is defined as a three-storey house. Please have the surveyor show the 938.85' contour(944.85' less 6 feet=938.85') on the survey. easement means that portion of a building that is partly or completely below the existing ground level. A basement shall be considered as a story for purposes of determining the number of stories in a building, when the finished surface of the floor above the basement is more than six feet above the existing ground level for more than 50 percent of the basement's perimeter. The perimeter of the basement does not include portions of the house or garage that do not have a lower level but are merely "unexcavated". Artificially raising the grade adjacent to the foundation of a structure (by filling or by a combination of filling and retaining wallsJ above the surrounding natural terrain shall not be al/owed as a method for converting a defined story to a defined basement, regardless of any other benefits to the property of such action. Finished grade that increases more than one foot from existing ground level shall be considered as artificially raising the grade. However, artificially raising the grade when such action merely restores a previously excavated site to its original natural grade may used as a method for converting a defined story to a defined basement. • The resolution needs to be signed by the Mercers. They will both need to come into the office with a valid form of identification to have their signatures notarized. • nclosed is an updated escrow agreement. Our records indicate the variance escrow for#14-3676 was paid by Stonewood, LLC. Please have the property owners sign the updated escrow agreement and note that the escrow money is refunded to the property owner of record at the time of escrow refund request. • Your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please don't hesitate to contact us if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 55356 (physical addressJ PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ 1 .� - �' 952.249.4620 8 952.249.4616 � cmattson@ci.orono.mn.us � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Monday,January 19, 2015 z City of Orono r ;�otiG. Hardcover Calculation Worksheet �, ! Property Address: N O A S S I C� N �D �D D R E S S �,,.�,� ^ w Es-r a � 24 o G� R r� a N `�`��,,,,.;�.��-� Prepared by: �A N D �/ ST��N Date: �2 23 �� Storrnwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on ttie property, keyed by letter to Certificate of Survey (survey must accompany this form). InGude all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. .Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage se aratel for each ortion. Key to Hardcover Item(Describe) Length x Width Total Surve S uare Feet Exam le Gara e 24'x 30 720 S.F. A S.F. g G L L DO S.F. C S.F. . D W S.F. E S.F. F S.F. G S.F. H S.F. � S.F. � S.F. K S.F. � S.F. �. S.F. N S.F. 0 S.F. � P S.F. Q S.F. R S.F. S S.F. T S.F. � S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Pro ed Hardcover S.F. Ezcludable Hardcover See C' Code Sec 78-1684: - S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Pro osed Hardcover Subtract line 2 from line 1 b S.F. 4 Total Lot Area 0 0 S.F. Proposed Hardcover Percentage [(3)�(4)] 23,� °'� This is an information packet regarding Hardcover. Every effort has been made to insure fhe accuracy of the information contained herein;however,ff any information is not consistent with provisions of the City Code,the Code provisions will prevail. Page 9 of 9 Hennepin County GIS - Printable Map Page 1 of 1 . - ■ • i ' Hr�nrn��i i � , . . .. ,�_ ,� . �-e ,.a 3� � �P'� Id1b IIiN �' "�i " �^. .�.. ���� �. � �� `�� �`�! � � - �'� �rw ,; ,�� �'•o �, `� � � .� " , ,- ���,�a nrs �;,;r t ' :'�,x, �. �-'��^ " - '�' .4. � . . p ."�l'4``"�, d�y;•.•k�����i'�, "' r��� a ..4..;�� �'` ' � `#^h ` � � ..` :;+ . �,,.'-q ,�''� s;° � .�. � � ,�� � y :�' ;o � ,4$ ' ��. . . uF :� �, ,. ,�. - _ a � +S �_ �•. � �i , _ .� � ,F� - � ., - _. . ' '1�� �� :;-' .+YY�� '�*� �y 1W." a '� . . ' .. � ����,�"� 1� '� � � . ';P ,,,� �'. � `�' S I��� '�'s.,� �", �'��: � a� � s ,F- _ ` � �., .. � - � �• , . . . � �' , �_ � �;��; �t ` �N ����' _. _ ro,�=s-�+� �" � . ��.� ,. � �, ��• f.. .�� ',i '� ' � ' _ . m��"a.a.�+ �����• � ', �yyr���M. � _ � y��1 Y..��-.� JM � u.,y '�� � . IT � � �� � � . �t`�� � ` .�' .M�t 1� a � i�►�`.' � y '�� }� �. .'��-N , �'» ��.�.- �� ;; �a , �� €� + � ' �, � � � . �� : ,� �I�, �� °�"F ,� 3 Nn..� e� ��4, �'��� � d. . # �` ' �- '�• . 'y � ,'' '� '�i �_ �p:,� .�. '.� .. �.. .. ��.4� �� '�� .,� � �:�..., ��^:2,� . 6,� . ��. � , '�' ~� . '�r . . �,�> � � �$��. � �`� . � d�{, �.,� , �"'4'`rr,� . ,� �h..�.� ri Y F M1R�at .,�.. . � . � , . _ �a. L�,� '��T�''�� �� .. r` �" �e�, a ,; , ' � , ` . . . , . . r. 4�� >��s �.� �+� .�;_"��,� '„�, - - ' ` , "- ? `'g�- Y "a,.. z .� �'�'�'„ �� �j ! ��"^ .��- ` -� — �r �` �, �' °� t�" _ .. . . � �r+`�' � '.. � �,�,,, c�� �� �, �.�° �� �V. � r.�� � ��,f• t�t `'y t�,�_ s 'A�' . � a' � ;ak,� A _ ,� � � q� �-- � � � �� ' � � � a y�� �� ,.,�, - � �� � x � _ �'.. � � Parcel Map Scale: 1"= 100 ft. N A-T-B: � ID: Print Date: 1/29/2015 Owner Market Name: Total: Parcel Tax ( Address: Total: Property Sale Type: P�iC@: This map is a compilation of data from various sources and is furnished"AS IS"with no Home- S81e representation or warranty expressed or implied,including fitness of any particular SteBd: D8t@: purpose,merchantability,or the accuracy and completeness of the information shown. Parcel Sale COPYRIGHT OO HENNEPIN COUNTY 2015 Area: Code: � Thirk Gr�ee�! . _ _ _: http://gis.hennepin.us/Property/print/default.aspx?C=45163 3.3976109481,497565 8.279656... 1/29/2015 � � � ���� ��� � New Construction Energy Code Compliance Certificate Per'�IIOIBBuildingCmifiute.l6wldrt�gcemficamddlbepoYedm�pmnnmllyvieiblebca4oninaidelhcbwld�e�.7Le �OCnNM1nbPwteO cmiirne�hall be campltted by�he builder nd siW I lia in(wmenon md vilues of mmponm¢lisad m Teble N I 101 8 MuGo�Ad9rtv NINe D/wd�tiee�r Dwe16n�Udt Cip l C.J l_[.t(1^l G�.Yt �. ,: .�._. Ns�e ef Residea4d CeelrM�r M1 lioene NoOer �.��„��,� 1�1-L t��s�k�is THERMALENVELOPE RADON SYSTEM Type:CheCk All T}t2t Apply putivc(No Fan) `o �. '�' Actrve(N"ith(an and mortomeler or L' % �, other system monitonrtg dn•ice) = y _ ,� — _ v� � � _ C' C G U y � Y 3 L � 0� Q1 U �� � l, C o � �1ISUladOfl LOC2t�0I1 K � Z m m U � � � � —_ .. .. E _ d � � � p a ,a o � � m eo z u.. 'u. u. LL � � o[ Other Pleasc Describc Hcrc Bdow EnHre Slab �^ Foundation�l'all 7ype in bcatbn:Imeilor exterwr w integral Perimekr of Shb on Gnde � Rim Jois1 1 F�undation) Type m iaatqn:Imenor e�awiw or IMegral Rim Joist(I"Floorr) Typa in wcniwn.�,�erior e�aerior o.imegai �1'all acra�,n.� c��r��g,.-,�i�ea B���Windoe�s or nntllevercd arexs ,}-. IIoous roum over ara c Describe other insul�hd arcas Wintlows 8 Doors Heatlng or Cooling Ducts Outside Condltioned 3paces Avcm^c U-Fuctor(�z�d�ulrs sin�li 7ru nnd onr dw,.)U_ Not applicebic,ell ducts locuted in condition�d s uce Solar Heat Guin Cocfficicnt($HGC)�. R-ralue MECHAN ICAL SYSTEMS Meke-up Air Selec�a 7ype AppllanC9s Heating System Uomestic Water Heater CooU 5 sYem Not r uimd r mech.code Fuel7' �.� � ��-l4'1'(i F'acsive Manufacturer C"�� /�t'�i. y ' � !� Ci v��� Powerod /��� Interlocked with exhaust device. Nodel �.; L7l�L�I� I � C� Descril+e: Iryme in capnciry m Owpm in Other,deseribe' RYfingorSi�x I3Nti: ��GY,U Gallons: I"a�s: Hca�Lou: I�Iea�Gain Location of duct or rys[em� S��d«�«,�.��,.�..�� 8q� 3'Iv5% ��1 AF�UE w SF.[R� yr� HSPF°e � / v`��1 � � Calculmed Efficitncv codm loed: ���C1;(J Cfro's "round duct OR Mechankal VenUlatlon System "mernl duct De�:ribe nnq addiGorml or combmed heating or cooling syuems d installed�.(e.g.two fumaces or eir Combustlon Air Srle�i a T e ource hea[pump with gas back-up(umace): Not required per mech.code Selec�T•e F'azcive HeatRecoverVentiletor(HRV)C i inc6ns�. l.ow- Ei I-li h� �j (hher,describe: Gncr�v Recover Ventilatpr�ERV)Capacig�m cfms: Low: Hi LOcaljon of d et or 5ystem� Continuous e�austin Canjs)rated ca cih�in�cIfmr `LG Lu�:aiiunoffaiKs).describc�. II F�IiT�'l.�j �- 5 �' �il%eF/� - '- (j(j' y�- Cfin's Capacity continuous ventilation rate in cfms 'C.: "round duct OR Tnlal ventilation 1 intertnittent+con6nuous)rate in cfrns: (�� "metel Juct Created by BAM version 052009 _,___���...._.___ . _ .. ._ __.___ �,_._� __ _._ �,.;i��G _ 7' r,.�La.�dl _,r� ,_ ,�T_L �1��-; _ - - =. . __, _ n i.�?::r_�3:^, - - c 7,i� ���^t1r..��y---ilz_ .0_... _✓z ,�Js z.i�`+ � � i : - --- .,-m���pt�po�+ar Oneormuldple �neatmospheis�6y , fAuUF182tmos➢�o�Y- � van[oi tliiG�,l tan[ (mraslis6ed epp§flncC3 v3Med gat Orffii wniad gas m nH :ppGutcesorno andPowerveotor�Gre�t applianeeaane ���� �nbu�nPPt�nees" ventappianc�" �mdap� �tel�o�' 1.H)ptESSOf2fa'C� tri��l 6.15 o.aP aos aos b)to�m�ed - Aoor xea(a� / (irx�dNy unimisiad haxmenb) C��3�- Eelune9ad Ho�eo 1n86aH�(dmr (�axin� q �e:� z.r�ua c�y a)m�ed� �� tet�FlaYoneymem(dm} - ��$PM��10 b918RGE8 - V6�i��i�W1 S�SI�I�S�ldl�f1R1� 0)tlolhes dtyer(chn) 135 135 135 13S t�86�0(iltgeWe�NNfaWg ,�u' l��?: � (not�Cal�eiEteatad�5�tg _y� sysiatllm�Gms�dmekwp att is�N mptbCeu an6 �(Sti mat�f ia a3iaus� d�6lRS of nhtllacgmtaxha�sst ra0n9 Edm): (not aPPr�`v��B system er B�Ovm.red m�euP�r ia�CUiCBIYy it11EflGCkOd 811G malGhed tD ezhaust} nOta�ie Totai Exheusl Cep�ily�t�mj: � �za=wta�za� q 3� 3.hlakaupA4Roqu�mCnl ��,�� � 3� b���►�� ��o h+.�AUo��a: �3a30� ` (HvmlWiellYgallw.nOm�t� /r/ au�n�dedl �� o.farA�ewAvop�d�g�� ,1�/�� refertOT�la501.b2 :, U��wWmnQ6�eme�9��n�edm�Yx�9esaalaAAi�m�Ihas�en000s�h�n��AA��- s llpihhrnbnm$8re�al8a�Efart�hletlaPP�P����Urena�prtre�ioelYveohd��faiwhe�eluded c U�Odscalarmi"elMreaa�sl�pheriapY�(dhxlhen�►98soroAa�ancePer'�9�otoneso�dtuefeppimnca � U�NacWeim�OretememuWp�aeunosphe�7"�i1°d9�orataPP�imxmtsieGamm�vml�6�elee�e��Y'��9�°' op ap�enean aod softd ioslsppfanas 1346—1� Diredions-The Minnesoia fuel Gas Code method to�o���4!s requlred to be��ed out.ustton air opening,is Cplled the Known AU Infiltmtfon Rate Method. For new mnstruttio�.4b of�p IFGC Appendix E,Workstieet E-1 Reside0tial CombustlOn Alr Caltula[ion Method �for Fumue,Boi�er,and/or Water Heater In the Same S ace Step 1:CompleK v�nteA combustton appliance information. Pumace/Boiler: in „t: Dd an,/n� DroR Nood F�n Assisted �Dvec[Vent P orPowerVent WatC�HCdtE�: �/ Input: 7 t�V f�l> Btu/hr D2RHood l'�f2nA5515ted _Direccvent or Power Vent StEp Z:C31Cula[e the v0lume of the Combustion Appliante Space(CASI�a�taining wmbu#ion appl'un���ume ���ft, Thp CAS inClutlES 211 Spa[es connecteC to one anothar by cod�coIJmPH���t op����L W H 3 70}X St�p 3:Det¢rm�ne Air ChanQeS pet HOur�ACH�1 Defaul[ACH velues have been incorporated into Tabk E-1 for use with MNhoO 3b{ICAIR Methotl). If tht �if Of[OOSCNRion cr A�H B no[knwn+.use method 4a(Staodard MBthOd. St@p 4:DEtBffflill!A2qU1fCd VdUIi12}Of�AITIbuS[i011 Alf•(DO NOT COUNT DIRECT VEN7 APiLUNCES) 4�i.5[andard Method ��P�t_ Btu/hr Tot21 BtulBr inputof a0 comWsiion app�+ances TR� ft� Use Standard Method mlumn in TaWe E-i to find rowi neqwred Volume 4TRv) If CAS volume(from SceP 21 V prc�rlhan TRV then no outdoor openings are needed. if CAS Volume 1�^5up z)u f�r than TRv then go to sTEP 5. 4y.Koown Air infiftr3tion Rate(KAIR)Method(DO NOT COUNT DIRECT VENT APPLI� �� Btu/hr Totel Btu/hr Input of all hn-�ssiRed and PoWo�veM app��aMeS ��P�� Use Fan-Assisted APPllan[es column in Table E-1 to find RVFa j�SC� e' Raquired vWume Fan Assisted(RVFA) f� Inpui: �'� Btu/hr TOt21 BTU/hr input ot all Natural dnfc epplisnca � Use Naturol dnft Appliance5[alumn in Tabk E-i co flnd RVNFA: n� RequVred volume Naturol drak apd�a��(�NDA� U s�'��U Tavft' TOtaIR2qWretlVOlumC(TRV)=RVfA+RVNDA TRV=��3 � if Cns voiume Ifrom 5[ep 2!is prmter than TRV then no autdoor openings are needee. If CAS Valume(from Step 2)Ja less thon TRV thm o to STfiD S. Step 5:Calculate the rztio of avalWble Intenor volume to tl+e mcal rcqu�rcd vdume. 3.7 U� �o��`�' � Ratio=Cn5 volume�from Step 1)dlvlded bY TNV(from Step 4a or step 4b) Ratio= I Step 6:C21cu1Bte ReduRlon FaRor IRF). y � RF=1- e E + RF=1 inlnus Ratlo St�p 7:Calculate single outdoor openlnB as if all comburtfon afr Is from oatside. 7y��j gtu/hr Totel Btultif 4nput of a�l CombusBon npp0ances in tha same CAS InpuC �EXCEPT DIRECT VENT) Combustion Alr OpeningArea(CAON� ���(y(,j - �K��%� In' Total Btu/nr dlvidetl 3000 B�+/hr a in' fAOA-7 /3U0�BN/hr r in'- Step 8:Calculate tulinimUm UiOA. 3 _ �,� / i RF Minimum GOA=� ��p x �� Minlmum CAOA=CAOA multJpued �� Step 9:Calculate Combustion Air OpeNng Dlameter�CAODI '`�3 X �,Z Z ({�� t� ln.dro T CAOD�113 mukipYrd bY�s9�°��O°t°f Minlmum CAOA CAOD=1.13 V MfnlmUm UOA��_. o up one Inch in size if usin fla duct 1 If desired,ACH an be detertnined us�nB ASHRAE pkulation or blower door tart.Foilow procedures in Sec[ion G304. Page 5 of 6 Diredions-The Minnesota Fuel Gos Code method to�a���41s requlred to 6e�JNfed out.u�ton air opening,is called the Known Alr infil[roUon Rate Method• Fo�ne�+'�°^�'�D°'�°f�ep 1FGC ApDendix E,WorksheM E-1 RlSidMtiB�COrt�bU5L�0�AIf C31CU13t�00 Metfiod (for Fumace,BW�er,and/or Water Heater in the Same 5 ace Step 1:Comple[e vented combustton appiiance information. Pumace/Boi�er. �pi�Vent Input: D��B�u/hr pro{t Hood Fan Azsis[ed orVowerVent WBtCf F12dt8f: �/ Input: ����JU l� BtU/hf Drak Hood I'"Fan ASslitetl _Direcc Vent or Power Vant Step 2:CalCulate[he voiume of the ComG+stlon Appliance Space(CAS)containing combustion app�bn��ume: ����ft� The CAS indutles ail spaces connecte0 20 one aoocbar by code�c�PH���t openinQSL W H .3 70 X SHp;:Determine nir ChanQes per Hour�ACH11 DePoult ACH values have been incorporated int0 Tabk E-1 fOr Use wtth MethoC�b f��R Methotl). If[hC Ed!Of COOStNR�c�or ACH h not known,use method 4a(Standatd MOthOd. Step 4:Detertl��t12 R2qU1tCd VOIURIE TOf CAmbu5t10�Alr.(DO NOT C�UN1 DiRECT vEN7 APPLIANCFS) �a.Standard Method ��P�t: Btu/hr Tot21 Btu/�r input�of all combustion aPP�'a"�� TRV' ft� Use Standartl MethOd[olumn in Table E-i to find rocai Reqw*ed ----- Volume�TRV) If CAS volume(from SMP�1�*a�a��on TRV then rro ou[Ooor openings are needed. If CAS Volume�hom Step 2)b fess tho^rRv rhen go[o SiEP 5. 4b.Known Air Infiftr3tion Rate(KNR)Method(DO NO7 COUNT DiRER�M��� �Jr Btu/hr Totel etu/hr I�Put of all bn-�ssisted and pow�r wM epp��anCBS Input Use Fan-Asslsted ApPAances column fn Table E-1 to find RVFA:��SC.� R' RQquired vdume Fan Assisted IRVFA) f� Input: �'� Btu/�� Total Btu)hr input of all Naeural dnR appiiences � Use Natural dnft App�iances co�umn in 7abk E-1 to flnd HVNFA: n� ReqWred volume Natura�drak npd�a^����A� ��(J �yV ft' TOtal REqU1�Etl VOlUfne(TRY)�RVFA+RVNDA rnv=S�SU .�.�—� � If fA5 Volume Ifrom Step 21 it 9�er than TRV then no outdoor ope�ings are needed� if LAS Voiume(from Step 2)Ir lers tAon TaV then o to ST6P S. Step 5:Cakulate the ratio ot avalWlNe�ntenor�vV(from Step 4ator Step ab)�uTe U J .j�� . Ratio=CAS Volume(from Step 21���bY Ratfo= ��7 f Step 6:G7fculBte ReduR�on Factor(RF�. y � RF=i- � F ' RF=1 minus Ratlo Stap 7:talculate singie outdoa openlo8 u if a11 combust�on atr is from outside. InPur �U�a,� g��r liances in the seme CAS �—�— Totel Btu/hr fnput of a�l Combustbn npp �FJ(CEPT DIRECT VENT) Combustion Alr OpeMng Area f�OA): �p,OA�'7��(LC.��3app gt�/h� r In'_ ''?K`�'� In' Total BtuJhr dlvidad b 300D etu/hr er in' Step fl:Cakulate Minimum CAOA. l, ,/ Mfnimum CAOA=CAan muldPlled RF Mtnimum UOA= (� .�"i�6�o x .3 = `'Ji`A �n' St�p 9:CeIcul2tE Com6u5ti0n Alt Op2t1�nB Dl3mttBf{CAOD) ' �3 X a�"�Z f ,1�� tn.die fAOD•1.13 muhtpUed bY th��9°OK root cf MiMmum CAOA CAOD=1.13�Minlrt�Ufn CAOA�� o up one inch in size 1f using tlex duct r door test Fdlow procedures in Section 1 If desrced,ACH an be detertnined using ASHRAE cakulatfon of blowe G301. Page 5 of 6 � � 9 Load Short Form �ob: nnercer wri htsoft Date: Aug 25,2014 Entire House By: Mike Horizon Contractors, Inc. 8197 Horizon drive,Shakopee,Mn 55379 Phone:612-508-9226 Fax:952-445-4367 Email:michaelstng�yahoo.com � • - • • For: Mercer, Stonewood � - • • � Htg Clg Infiltration Outside db (°� -15 91 Method Simplified Inside db(°� 68 75 Construction quality Average Design TD (°� 83 16 Fireplaces 0 Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 51 32 HEATING EQUIPMENT COOLING EQUIPMENT Make Bryant Make Bryant Trade BRYANT Trade BRYANT HEATING AND COOLING SYS... Model 986TA60100V21 Cond 127ANA048"*"B AHRI ref 5039826 Coil CNPV"4821AL'+98(6'6,7'A)66100V21"" AHRI ref 6863978 Efficiency 96.1 AFUE Efficiency 13.0 EER, 16 SEER Heating input 100000 Btuh Sensible cooling 33600 Btuh Heating output 97000 Btuh Latent cooling 14400 Btuh Temperature rise 57 °F Total cooling 48000 Btuh Actual air flow 1600 cfm Actual air flow 1600 cfm Air flow factor 0.018 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0 in H20 Static pressure 0 in H20 Space thermostat Load sensible heat ratio 0.89 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft) (Btuh) (Btuh) (cfm) (cfm) Guest 210 3149 1255 56 59 Bar 120 1127 554 20 26 Rec 870 5254 695 94 33 Mech 264 2226 118 40 6 Guest WIC 30 550 34 10 2 B Bath/Mud 108 1199 68 21 3 Ex 288 2655 144 48 7 Living 440 7229 3654 130 171 Foy/Stair 353 6664 1750 120 82 Dining 273 5173 3082 93 145 Kitchen 252 0 1886 0 88 Sun 240 6974 5822 125 273 Home C 35 814 378 15 18 Home C/Pantry 77 0 0 0 0 Mud/WIV 91 2395 469 43 22 Pwdr 49 1027 267 18 13 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Dec-26 13:40:50 ^.��,'� WI'19I1tSOiC Right-Suite�Universal 2015 15.0.03 RSU07800 Page 1 /�li�+i1 ...\Desktop\Wrightsoft HVAC\Stonewood Mercer I.rup Calc=MJ8 Front Door faces: S Lake Entry 80 818 710 15 ' 33 ' Bed 3 198 4262 1552 76 73 Upper Bath 129 2274 1159 41 54 Mstr Bed 285 3935 2516 71 118 Mstr Bath 227 4705 1569 84 74 Mstr WIC 180 1220 336 22 16 Bonus 583 14013 3444 251 162 Laundry 88 1251 269 22 13 Office 148 3540 806 63 38 WIC 3 36 1074 200 19 9 Office WIC 30 55 32 1 2 Up Str/Hall 441 5626 1340 101 63 Entire House 6125 89206 34109 1600 1600 Other equip loads 0 0 Equip. @ 0.96 RSM 32744 Latent cooling 4307 TOTALS � 6125 � 89206 � 37051 � 1600 � 1600 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Dec-26 13:40:50 t WI�19IltSOft Right-Suite�Universa1201515.0.03 RSU07800 Page2 /�i� ...\Desktop\Wrightsoft HVAC\Stonewood Mercer I.rup Calc=MJ8 Front Door faces: S Christine Mattson From: Christine Mattson Sent: Thursday, February 26, 2015 1:30 PM To: 'Gustafson, Sven' Cc: Melanie Curtis; Lyle Oman Subject: 2490 Carman Street/#2014-01488 Attachments: 2490 Carman St.pdf Sve n, The building permit for 2490 Carman Street is ready to be issued. The building permit, SAC and Sewer Project Connection Fees are required totaling$15,926.25. Please see the attached and explanation below: The following fees need to be paid before we can issue the permit: � •✓Building Permit Fee. The balance of the building permit fee to be paid is: $6,741.25 �• ✓Sewer Availability Charge (SAC). The 2015 SAC is$2,485. This fee is determined by the Metropolitan Council ` Environmental Services(MCES), collected by the City and passed on to the MCES._, • Sewer Connection Project Fee. The 2015 Sewer Connection Project Fee�s$6,700 for this property. This fee is in addition to the connection permit fee. �,� �'jGic�.��;z� ��`, Please don't hesitate to contact us if you have any questions. '"� � �, Christine Mattson Planning Assistant '� � ���r; �j— City of Orono � 2750 Kelley Parkway � Orono � MN � 55356 (physical address) PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ � 952.249.4620 � g 952.249.4616 �' cmattson@ci.orono.mn.us � � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Monday, May 25, 2015 1 ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the connection fee for that area. Such connections are subject to City Council approval. CONNECTION TO SEWER SYSTEM IN ADJACENT CITY Fee Connection to Long Lake Sewer System $1,900.00 or per current Long Lake Fee Schedule Connection to Wayzata Sewer System $602.00 or per current Wayzata Fee Schedule SEWER PROJECTS By District-Project Unit Charge+ Area Or Credit To Area Acreage Charge 1963 ST-lA,LS-lA,ST-1B,LS-lB $6,700.00 1 1964 LS-lA or LS-1B $6,700.00 1 1965 LS-1 $6,700.00 1 1965 LS-lA $6,700.00 1 1967 LS-1 $6,700.00 1 1969 LS-1 Shore Hills $16,720.00 1 1969 LS-2 Chev Chase $13,070.00 1 1970 LS-1 Sa a Hill $6,555.00 1 1971 LS-1 Dunwood $5,837.00 1 1973-1 $11,316.00 1 CREDIT TO AREA: (1) 602-37691 Sewer Operating (6) 317-37691 1997 Improvements (4) 406-37691 PIR Fund#7 LS& Forcemain (7) 313-37691 1998-1999 Sewer Improvements (5) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements 2015 Fee Schedule-Page 10 CONSTRUCTION PERMITS AND INSPECTION FEES(CONT 1 Applicable � Permit Tvue Fee Code Section MUNICIPAL CONNECTION PERMIT(together with area connection charges) Sewer $ 50.00 SAC(Sewer Availability Charge)-Determined by MCES $2,485.00 Water $ 50.00 Water Meter&Horn Fees 5/8" (3/4"x7-1/2")meter with horn including sales tax $ 323.07 or current cost Res.#5101 3/4" (3/4"x9")meter with horn including sales tax $ 374.84 or current cost 1" meter with horn including sales tax $ 493.21 or current cost Larger meter Quote Basis Horn including sales tax Quote Basis Mail-in postage& handling charge $ 2.00 (sewer and water permits only) 201 S Fee Schedule-Page 9 `G DATE TIME� '�� CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDU�ED � _�_..� PERMIT NO. ZOl� -0 I 4$� COMPLETED ADDRESS C� c�--�"mc�✓� S � OWNER �E EPHONE NO. � y��"`��Z'�° CONTRACTOR 5���'� ��21�� �-��� {--�Y�tS �; DESCRIPTION ��71A���-�� �c�� � /N� tSr►'� � � ❑ FOOTING ❑ DEMO-FINAL / ❑ SEPTIC FINAL Q�(2URED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FIILING Qv❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPIAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP �u ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL J ❑ DEMO-SITE ❑ S�INSTALL ❑ FOUNDATION/REMOVAL � OWNERfCONTRACTOR TO M_ EET YOU:_ ES_NO � COMMENTS: � '/ / � �.l.�!/l �d fi✓w) � �L .OL�� � � � � �. ' . �a�o�c c%i.S - �!'lc � ert�', rt��. .�� r- �_� 7l q �� �� �6�i� � z w � W � � GW�SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK&PROCEED �ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORAFY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. O PHOTO TAKEN INSPECTOR WILL REfURN ❑STOP OfiDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for ection 2��n�ance. (952) 249-4600 Ow ctor on ' l Inspector. �'v White Copyllnspector's File Canary CopylSite Notice �/' � \��� DAT TI CITY OF ORONO CALLED IN INSPECTION OTICE SCHEDULED '��' 02• 3(� PERMIT NO� � � COMPLET ADDRESS a� � OWNER TELEPHONE NO�O.S� � CONTRACTOR ��� � - �; DESCRIPTION ! � lI��AOTING DEMO-FI AL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBIN ❑ EXCAV/GRADING/FILLING � ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL v ❑ DEMO-SITE ❑ SEPTIC INSTA�L ❑ FOUNDATION/REMOVAL Z OWNERfCONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: �� �� ���� d� � ,,�/ a �S���i.c.0- ,�e� ,$Gr�d Q c.�d a�S S"�2S o — �✓�� - O� � ' Qi �/'d�s/— .��'' .OJG� � � ' SD �/ -- C/� W ,., � ` �a'1Vt�d� �t nL �/ irf b�� /F J� /✓✓�p n.. Q � �- �fJ�a r c— � W � W � j d 4�RKSATISFACTORY:PROCEED ❑PROJECT COMPLEfE W ❑CORRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECWERING PERMANENT �7 CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-46�� OwnerlContractor on site: Inspector. �'�' White Copyflnspector's File Canary CopylSfte Notice � � �u DATE TII� CI OF ORONO CALLED IN y�--- � INSPECTION IC �� QSCHEDULED _���Z1�-rj PERMIT NO. ��COMPLETE t����` � ADDRESS �� ��� ,� ��/J��Q.lil a OWNER TELEPHO NO. — CONTRACTOR � � DESCRIPTION � ly ❑ FOOTING ❑ DEMO-FINAL � SE IC FINAL Q ❑ POURED WALL ❑ PLUMBING RI Q��� ❑ EXCAV/GRADING/FILLING O�F.pUNDATION WATERPROOF ❑ PLUMBING FINAL p❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ���`-�'SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL J ❑ DEMO-SITE ❑ TIC INSTALL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEET YOU:�YES_NO � COMMENTS: �� � � �oc,��cc2�o •� �,�t�,v��� ct-11z s�! —d�" � � o . , . o� � �` � D�Lcr�� �/��"' ftle `v' �La �-��DlG7�` ^ ° ' Co���ai 7S l,�a.K �,�1' e�4�C�a� � � �4,v���ll � �t��S� %�S� �4 G � '��c� Q � � z �'b�Q►�ts.�S — C�►'��.��✓ Z1 ,��'o v to�, � .�J�Y r�S � O� � �d t�c�c�l a�. J d W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLEfE ��CARRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT O CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pH0T0 TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED_CALLTO ARRANGE ACCESS. Ca11 ' spection 24 hours in advance. (952� 249-4600 Ow ontractoronsi • .Sb �' Inspector. �--� White Copyllnspector's File Canary CopylSite Notice /D_i � ��- `�T G ,,q�TE r— TIME CITY OF ORONO CALLED IN D' //S INSPECTION NO I E CHEDULED S-/d -2'S .���� PERMIT NO. � �� g� MPLEfED ADDRESS ` � � OWNER TELE ONE NO _ -a7�-�� � CONTRACTOR � L �; DESCRIPTION �'/ Q'�/ ly ❑ FOOTING ❑ EMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ J ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERlCONTNACTOR TO MEET YOU:_YES_NO � COMMENTS: � � b��_� !� ti��� � -' .��t�r4,�v�%c��,r c S�.r-!� � �S 2.� .�c. - 4- �a� � O� —` <� � ri 4 ��s CKG�i�'��'u.T �— Q �t� `� Cf�ve ✓ � � Z � ' ��6� l/�il�i GJ c�f( �E ��'a r''� �..�-� � - , rcSl�G� � a W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � RECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT O CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED_CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-460� OwnerlContractor on site: Inspector. l.w White Copyflnspector's File Canary CopylSite Notice i G� D TE TIME �` ITY OF ORONO CALLED IN =�� INSPECTION N CE �j SCHEDULED PERMIT NO. � '���n0 COMPLETED ADDRESS � � OWNER TELEPHONE NO. �� ��� CONTRACTOR i DESCRIPTION ���-aYIJ�-� .,Q�(.��� l� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING y ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE ��PTIC INSTALL Z OWNERICONTtiACTOR MEET _YES_NO � COMMENTS:�C�Q'f'f I L�-�-�-/ ��f�-'�� a �� / j � ./ �" O � �.. , - � , � O � � W � Q � 2 W � W � � J O W� O RKSATISFACTORY:PROCEED O PROJECT COMPLEfE W RRECT YYORK 3 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0�%O`CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT �CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REWIRED.CALL TO ARRANGE ACCESS. Cal1 for the next inspection 2a hour,s,i� 52� 249-46�� � OwnerlContractor on site: �� Inspector: White Copyllnapector's File Canary CopylSite Notice �/'(� r DA E TIME �� CITY OF ORONO � CALLED IN �0" ��— INSPECTION NOTICE � CHEDULED �c�(,L_ PERMIT NO. ��f ��cOMPLEfED ADDRESS 0 �� -S/- OWNER TE PHONE NO.�P��-a�a-�"73�- CONTRACTOR � DESCRIPTION W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL 2 J ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERfCONTAACTOR TO MEET YOU:_YES_NO � COMMENTS: � W C. � J O � � O � W � Q � 2 W � W � j d W O WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � ❑CORRECT WORK 8 PROCEED F ❑ ISSUE CERTIFICATE OF OCCUPANCY w 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WFIL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in adve . 9-46�� OwnerlContractor on site: Inspector. White Copyllnspector's File Canary CopylSite Notice ��J ' DATE TIME ,/ CITY OF ORONO CALLED IN INSPECTION�N,,O, TICE SCHEDULED , -fS '3G PERMIT NO:•`�`� ��� COMPLETED ADDRESS 2-�-+� � � �✓�� �� OWNER TELEPHONE NO. Co��- 32c,� �� O� CONTRACTOR <«� �7�� �; DESCRIPTION .���a��`"� l� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ R ON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ AMING ❑ MECHANICAL FINAL ❑ RATED WALLS _�. � INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT J F NAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE ❑ SEPTIC INSTALL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � J O � � O � W � Q � Z W � W � � d W KSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � RECT YVORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR WILL RETURN ❑ STOP ORDEH POSTED.CALL INSPECTOR �CITATION ISSUED [� INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (g52 49-4600 OwnerlContractor on site: Inspector_ White Copyflnspector's Ffle Canary CopylSite Notice �` DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. ��q'-0��'�g COMPLETED •Z 3• ADDRESS 2�� ���n ��j' OWNER TELEPHONE NO. CONTRACTOR � DESCRIPTION ����M' �NJ�O� � -�� 1J l~i� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING y ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP 4! ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL v ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � O _ { a � J O �. � O � W � Q � 2 W � W � J d W ❑VI�RKSATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑ CORRECT UNSAFE CONDITION WITHIN HOURS. p pH0T0 TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOFi O CITATION ISSUED C� INSPECTION REQUIRED_CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (g52) 249-46�� OwnerlContractor on site: inspector. 'Y`���S White Copyllnspector's File Canary CopylSite Notice � �i `\\ ���7 �A ` ', \ �,� ,y/, ( � � / � � ` ;EL 2 � � � � F , , �.,� o, ��°�,_,, � =R � � � � '�R/Soo�Fqs\ � � � � '';. �', �. I \ � c ��6NT \��`�� � � I �� � S 89°48' � � 2�'` `� `' � � ��.� � I W� � � _ ` , 220 SF � !�' 91.0 j, �/� .�f 17���1 / � 931.5 266 SF � T �� � ;'SANITA�RY s��R �E�� � \�.y, ��y� _---____.___... Z4$6 SF /?2.5� EXIST. PARCEL � �) �— T<— -:-� <— -�- — ,< .-� �_: _. i �� _ _ � , , , 'ROPOSED PARCEL) � :..:_:�..�,__:-_. ._.::._�,_._,;�___:... ----__ � � � � / ,� I� ; ,o Y\��� `•, �' / DRA,'INAGE AND � I � I W ; �'�; � �, os,�,;, ��s�� � O i � —;�— — — — — - = 3092 SF ` w '�! t � -'•��'n i �� / � 2soo sF � I z z� �,� ��,. � \ ���� , °�'�- ; ; 5 = 150 SF � w��a�; Q� , �°` � �� S`''� i `, 1', _ �68 SF I ��Q 1 N°" q ` .��, �'���.�`\��!; , —��- PRO �OSEG , = 100 SF I c� , ' �' � i °� . S���. � ' EGRE 6110 SF / 24.Oq' � 30�, ; ,��; ,�SA , ,�o� `o �( ,i� , �:,` ,. - - - - - - - - � I i � a °'i iyq�T b� � ``� i_ Z� 75 OH � ' ( � + � �'� - - — F R E D I K o�����` �s�i �- °Rr�— .� �o, ,. �o��' � .,, MH -7 ; � � �;� Dc " Z STREET �,� � ,;— F � � ,�i �.' ; '`� � � , ,� � � � � , � EXISTING DRIVE TD� �- — —I i��o � I r: ��,� � 'r � '; `'. �.,, DGE OF EXISTING { : ; � i �h� o � � Y ON CARMAN S TREET _ � ; t� ;..-��� � °'` � 3 1� r � f,��'MO VE � WALL MlM/MUM 5 � ` � - I I - �' .��l��' ; i 1 W �;� N; '� W'�LK__A� I Z � � o �; � � I ���% PROPER� �M PROPER T Y L lNE �i,,, O� 15 .,�8 ; � � `�,� TlLITYS SHOWN ARE PER � �� �l ��' �� ;� � �� 11� � / i ��, �A TIONS AND ClT Y PLANS � Z ,' t ;' �N 1; '� °� s I I� �`�, 4LL L OCA TIONS) � � � ' k � �C� !�v h y- «� ', �I ' TN�'�945.5;� o � � 4 ' � ` ( � i , �i �P ''' r BN( 942 0,� � N ; �iu-;N o, — � �� � `�CO � /l ,�=-� � � �� 1%��' �'�yl\ 'r ' ( '�. . j � � �,�W � � n' 1 .0 '' \? % • �O K � ` I / � . I-� > �'' i � , , 12 5 N . RG, � !� 2 x I � � � ' � V �FE-94 .�5 ��:00 �' GFE=9 8.2 ;� � !' �," � TF�9 . ,� . �� EXISTING � , � � �Z ' ; 5.0 4� N l�RO O,S�D N �. 2 � , _-- HOUSE ,' �;" 1� , (� —, � h ''� M RCER :-'� I W� #2470 EXISTING � �' � '.� : ^ >� HOUSE I' � 0 ' � "'�H fJSE L F E-�3"4.0 ,,, I �� X LFE=�� ' ,� Z . rn �16. �y � ' '21.0 � �I '� ` '� (9 3.5) 20.82 `'� 33. - ' .6.� \ _ � � % Z ;i� ,, I h ��O • , '�� � \� ` - �-�`� ;� I � Q I �:' o � �� — � 95.7 LF/190.4 `�F PHOF I ;' �Q � ' � - _ oi n�� ! - i � ? ABOVE 938.85 50.39 I I ; � %�_ o � ''� � �' _., �_ K ;. � � � �.,.. _ DEC_...�-.._}�'_f�-�- °'� � , ,, o ` � � � � � � 9 S /; ;�10 ; � \ , , I�- pN�g�a" ;` ;' \ :� � � ' � � - ��� ` c��6 �/ � �. � � � � \ �_ , .- . , . :- : _.. I ` � �''O� � � � �' ? _ ._.. __ .. — � - � � %� , 9,, , 96.8 0 ,� �/� � ti , /' � ��� � �:W � .-� � �� - � � 3�' ~= �' � S 7�0 , � � '� ' ' �� � / � r QP\ � g5<<..- y - � � 30 60 90 � `� � �- � '�,.% � �� � � -�. i I -� � �. o �F �y �,�== � , � � '� �o ��� � i�"'" / �� 1�%�/ I N F E E T I :�. �0 � g�.,�-� � �� 1 � �-���' � � EXISTING SPOT ELEVATION. I £ '�,�=i i = PROPOSED SPOT ELEVRTION I ,.���� � i,�g29� • ��� � DIRECTION SURFAr`�" no��*���� = CANTILE� = OVERHEA � GARAGE � � TOPOFF . _...--- �' _. -,i v� _ , �v �v -- -- - -- .� —' n N G� O \ri U� --• v,? -F' U� lTt C� --� �, h) /1 � .. . "_� � Bi \o��. J • ..«� 0 • a f O 4 O e • fJ O O \ \ �v � ��! • a �y- • �'�\ n n •. ` _ l o �iT..l �Sl V�'� � LJ CA O � �v s � �3l N �J O � "� `� ixJ d �i 1 , '� - �`7; ` ' O � !� ;� �� t\.) O rJ �.� N N O C O O r � � � . . - . . .. -- -- . -, -t� i- � -h , a. -i.. + -i- -#. V' � - _ ' .... ._ .. 's , � �� � �� / DATE TIME� CITY OF ORONO CALLED IN INSPECTION NOTICE G�HEDULED `���`6`y",�, /O-�� PERMIT NO. C�dtoMPLETED ADDRESS � � � � c � �m�h `� OWNER TELEP�i�� ��Z'���� ��y CONTRACTOR .�— �, �-���� � DESCRIPTION �� � � � ��-�'�� Q —� ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING AI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE S PTIC INSTALL Z OWNERfCONTRACTOR TO MEET YOU• YES_NO v�i COMMENTS: � W � opj�,,v� Go.�-a� alJ,/�/� ! .:./v l�c� � � O � W � Q � 2 W � W � � d � �ORlf'SATISFACTORY:PROCEED ❑ PROJECT COMPLEfE W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O �CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR NfFIL RETURN O CITATION ISSUED ❑STOP ORDEH POSTED.CALL INSPECTOR ❑ INSPECTIONREQUIRED.CALLTOARRANGEACCESS. Call for the next inspection 24 hours in advance. (952� 249-4600 OwnerfContractor n site: c Inspector. White Copyllnspector's File Canary CopylSite Notice ��� DATE TIME •V� CITY OF ORONO CALLED IN INSPECTION NOTICE �`��U SCHEDULED � , PERMIT NO. COMPLETED ADDRESS ��-�-� Q � �c r �'Yl�1'1 S-�' • OWNER TELEPHONE NO� ��- CONTRACTOR �`�brE-�l��'��_ � DESCRIPTION � � I �a�"�-- � +�f C � � � ly� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE ❑ PTIC INSTALL 2 OWNERICONTRACTOR TO ._YES_NO � COMMENTS: ��� l�in.r�j�,� �"� " `� � P � � INh• £�t e� �a�P� G� � �c� � � c o�C �N r +�v• n rw 0 G !'s e r/o� /1 �-� '' ��� -�c, �r� „O �r � rCl// .,?/ /hN"b4.t�r,�Y �'� ��'�I�/� ` �af'/�w• ��-c � /� �rov-��a " b � C d/ D t -G r n�,� o��r cj�or�.� Q ri � � �'6 v�O G �s✓�� �4. L� cSG''(i�-`� � M b Iv nd� s rc.Gl� �n�s� ��t, � W � la�,E � ` ao r ,;, r�-� � ��� d (,tlCG�� PrbvidG Ti l�•SG�' G �.o Nt W ❑WORKSATISFA RY:PROCEE 5��� yy�x. ❑ PROJECT COMPLEfE � ❑CORRECT WORK 8 PROCEED 7� t ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION y TEMPORARY V BEFORE C01/ERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED �LPECTION REQUIRED.CALL TO ARRANGE ACCESS. � � Call for the next inspection 24 hours in advance. (952� 249-4600 OwnerlContractor on site: s��-'v� .� Inspector. White Copyilnspector's Ffle Canary CopylSite Notice � 1� ` � � �� DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTIC �( SCHEDULED '� PERMIT NO. ��� �U COMPLETED �� ADDRESS �y C��' l _ c�/-ir'7'Y�l�I :�'f OWNER TELEPHONE NO. ��a ��y�-�7a� CONTRACTOR � [C � DESCRIPTION �� � � � � ty ❑ FOOTING ❑ DEMO-FINAL II S�PTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT �INAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE ❑ EPTIC INSTALL 2 OWNERlCONTRACTOR TO MEEi YOU:�YES_NO � COMMENTS: ` -_ � , � I�1G-��'� �Yf �� � /9 �rGrit90 �i5 �L��i•L�' �i.�v�-� O � I/'Ov�t7c. L`o w�.,rOfi��o�-t � � �-'n�L i r s�ca�p.� �, ,�� � �� �.�r+� _t i��� 4 r .S ht'� O - � •�' �yZ C waP o s �'e r � s�ie�, � � -�p W � Q � �db�'` d � �'cy r r.����s�*-.S ,Ar o ��y e� � � �i� wo�K �� 6�s. �s �,..,.�v��� � � OK -#s �ss�d Gc� J d � ❑WORKSATISFACTORY:PROCEED �2ROJECTCOMPLEfE � ❑CORRECT V1fORK&PROCEED v�6SdE CERTIFICATE OF OCCUPANCY O O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CWERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (g52) 249-4600 OwnerfContractor on site: ��cv�� Inspector. � � i�"" % ✓ White Copyllnspector's File Cenary CopylSite Notice . � . . • • � • emo To: Finance Department From: Christine Mattson, Planning Assistant /J'v ' 1 CC: Street File ` Date: September 20, 2016 G/L: 101-22205 Re: Escrow Refund Zoning Permit #2014-01488 pertaining to 2490 Carman Street is complete. Please refund $10,000 to the property owner, Eric Mercer. The following is attached: • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Eric Mercer 2490 Carman Street Wayzata, MN 55391 w:�.street files\carman street�2490\escrow refund 2014-01488.docx TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW AGREEMENT Orono Building Permit#2014-01488 AGREEMENT made this �2 day of �� •1 , 2016, by and between the CITY OF ORONO, a Minnesota municipal corporation ("Cit�')and �L�( C /VI.GY(�� ("Owners"). Recitals 1. Construction of the new residence located at 2490 Carman Street, the ("Subject Property"), legally described as Lots 10 and 11, Block 1, Navarre, and that part of Lot 5, Block 1, Lehman Lagoon, lying West of the Northerly extension of the East line of Lot 10, Block 1, Navarre, in Orono, Hennepin County Minnesota, is the subject of building permit application number#2014-01488 has been completed. 2. Winter conditions currently prohibit completion of exterior improvements,final grading, and vegetation establishment. An as-built survey cannot be accurately conducted at this time. 3. Owners request the City issue a temporary certificate of occupancy("TCO")to the Owners so that the Owners may occupy the new residence. 4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of exterior improvements, continuation of erosion control and submittal of an as-built survey to the City. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement,the Owners shall deposit$10,000 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to assure comp�etion of any exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of$500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit#2014- 01488 if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when all requirements related to the project are complete. City Staff shall review the terms of this escrow agreement two times per year to determine whether the requirements of the project have been successfully completed and whether it is appropriate to return the funds. Owner may also request the release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification that all requirements of the project have been successfully completed. 155441 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. 7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents, employees, officers and contractors; the right to enter upon the subject property for the specific purpose of inspecting and compieting any exterior improvements, final grading, establishment of vegetation and the restoration of the subject property should the Owners not complete the work by the specified dates. CITY: CITY OF ORONO OWNERS: By: Its: � _� � r � Internai Use Only: G Original to Finance Department G Capy to Street file 155441 4634 ERIC,!.MERCER �7-1/810 515 JEREMIE D.MERCER 2-0isa�sas1 2420 ZIRCON LANE tJ �!_ ''6 PLYMOUTH,MN 55447 GZ� Da[e Pay to the /► �� ,4,/ ����.... ---J � �J B'O� � Order of_SQ •"" � � ��'L/�'�/�A- "_ _ /��~'v ":�,:: Dollars 8 6:,.u.o� l ` �� f wdlaFaqoBankNa. � - . . .: . � Minnewta . . . ' , . wellstargo+com . ._ . . � MI' Q For ���. C�.✓t � nC r ��'`-1 - - ' 04634 City of Oron� 2750 Kelley Parkway Orono MN 55356 952-249-A600 Receipt No: 3.015431 Apr 22, 2016 Eric Mercer Planning and Zoning Temp C G for� 2409 Carman 7,500.00 Street 101-222�5 Ueferred Rev-Developer Deposit --------------- Total: 7,500.00 --------------- --------------- Check Check No: 4634 7,500.00 Payor: Eric Mercer Total Applied: 7,500.00 --------------- Change Tendered: .00 --------------- --------------- 04/22/2016 03:59PM � CITY OF ORONO * 2 0 1 6 - 0 0 4 1 7 * 2750 KELLEY PARKWAY DATE ISSUED: 04/22/2016 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 2490 CARMAN ST PIN : 20-117-23-12-0065 LEGAL DESC : LEHMAN LAGOON : LOT 2 BLOCK 1 PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT NOTE: THIS$2500 ESCROW IS TIED TO BUILDING PERMIT 2014-01488 FOR A TEMPORARY CERTIFICATE OF OCCUPANCY APPLICANT ESCROW FEE-BUILDING 7,500.00 MERCER, ERIC&JEREMIE TOTAL 7,500.00 2420 ZIRCON ST Payment(s) PLYMOUTH,MN 55441- CHECK 4634 7,500.00 OWNER MERCER,ERIC&JEREMIE 2420 ZIRCON ST PLYMOUTH,MN 55441- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. . / / Applicant Permitee Signature Date Issued By Signature Date � . BUILDING PERMIT ESCROW AGREEMENT � Orono Building Permit#2014-01488 and Land Use Appiication 14-3676 AGREEMENT made this�day of , 20 V by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") Jeremie and Eric ercer("Owners"). Recitals 1. A building permit application has been filed a new single family horne located at 2490 Carman Street the ("Subject Property"), legally described as Lots 10 and 11, Block 1, Navarre, and that part of Lot 5, Biock 1, Lehman Lagoon, lying West of the Northerly extension of the East line of Lot 10, Block 1, Navarre, Hennepin County, Minnesota. 2. Owners request the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, enqineerin_q, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous r.�nr��r���� �������•�-� �-�ith the work and to repair any damage to public property or infrast nning, engineering, or legal consultant review) associated wi I Use Application 14-3676 if compliance with the approved buildi � ���„/ "/ (� w' 3. MONTHLY BILLING. As the City receives � n turn send a bill to the Owners. Owners shall be responsible fc ar�Q�� Q,� . vners' receipt of bill. T�� 4. DISBURSEMENT FROM ESCROW ACCOUI ��� � � " yment to the City within the timeframe outlined in #3 above, shall iss� Y ��� (� T— enses invoiced pursuant to #3. The City may draw from the escr �� i - �� � srs to reimburse the City for eligible expenses the City has incurred. �,/ 5. CLOSING ESCROW. The Balance on de w� /� � � •�((w . o the Owners when all requirements related to the project are corr � ;crow agreement two times per year to determine whether the . sfully completed and whether it is appropriate to return the funds ��,�� � � ands, and such funds shall be released upon City Staff receiving tf �� 15• � �, � '�'��fJNltti� �f the project have been successfully completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: C TY OF ORONO OW R: r By: 1� �ts: �an � � - _ i � Interinal Use Onty: �Original tn Pianning C]Capy to Property Owner : O Gopy#o Street File LAND USE APPLICATION ESCROW AGREEMENT Application#_�_- 3�q AGREEMENT made this � day of 1 , 20�, y and between the CITY OF ORONO, a Minnesota municipal corporation ("City") VQ.Vi -����d [a corporation—optional] ("Owners"). Recitals 1. Owners have filed Zo�nin�g Application # �4' - 3�Q�q formally requesting the City to review plans for a Si�YQ� L-�tbRU�- � located at the property addressed: Z410 �w�,1�1 S Mt�. (the "Subject Property') legally described as 2. Owners request the City to review said plans which requires City approval and may require consulting legal and/or engineering review. 3. The City is willing to commence its review of the application and incur costs associated with said review only if the Owners establish an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $��p�with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, or legal consultant review) or will incur in meeting with the Owners, reviewing the plans, and preparing agenda packet material for City Council review of application # �a' - l03 F� . Eligible expenses shall be consistent with expenses the Owners would be responsible for under a land use application. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bili to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall cease all reviews until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CITY OF ORONO OWNER • By:��W�[V� By: • its: � �� its: internal Use O.nly: � Original to Finanae Department � Copyto Zoraing File � Copy to Street File Packet Last Updated: March 2014 . Page 10 of 27 b CITY OF ORONO * 2 0 1 4 - 0 0 9 2 2 * 2750 KELLEY PARKWAY DATE ISSUED: 08/20/2014 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 2470 CARMAN ST PIN : 20-117-23-12-0060 LEGAL DESC : LEHMAN LAGOON : LOT 005 BLOCK 001 PERMIT TYPE : ESCROW FEE-APPLICANT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-APPLICANT NOTE: THIS $2500 ESCROW IS TIED TO ZONING PERMIT# 14-3689 APPLICANT ESCROW FEE-APPLICANT 2,500.00 ESCROW FEE-DEVELOPER 0.00 STONEWOOD, LLC TOTAL 2,500.00 153 E LAKE STREET Payment(s) WAYZATA, MN 55391- (612)462-4000 CHECK 12931 2,500.00 Minnesota State License#: BUIL-BC594315 OWNER LIND, MR. &MRS.THOMAS 2470 CARMAN ST , MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this rype of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construc[ion authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. / / Applicant Permitee Signature Date Issued By Signature Date �€ « ��3�� Z4-Zd �rr�� s�-rce,� _� �-�� �� ---, � , � � � �. � � j C iW I ! ���� � ; �o� I i PARCEL 2 �o� � ! NO ADDRESS ASSIGNED ��z� ! PID NO 201 172312009 `� �M � � EXISTING LEGAL DESCRIPTION ��z�o I ; THE NORTH 62 FEET OF LOT 10, EXISTING �ti�� � I ; HousE BLOCK 1, NAVARRE. .x �, �` � '� AND PID NO 201 1723120010 m�w N LI LOT 11, AND THAT PART OF LOT 10 `�d�'� �cowrn �� - LYING SOUTH OF THE NORTH 62 FEET -� � �� L DECK_J THEREOF, BLOCK t, NAVARRE. 1 � � ---- - ' AREA = 19900 SF _L� _ _--�� " � � � PROPOSED LEGAL DESCRIPTION � � LOT 11, AND THAT PART OF LOT 10 � j � L YING SOUTH OF THE N�RTH 62 FEET � �� ,-- -� ' THEREOF, 8L OCK 1, NA VARRE. � Q O � r" TOGETHER WITH THAT PART OF LOT 5, � � (� �� BLOCK 1, LEHMAN"S LAGOON, L YING WEST �Q ' OF THE NORTHERL Y EXTENSION OF LOT 10, � BL OCK 1, NA VARRE. j � � O / AREA = 25500 SF / 6375 SF MAX HC Q � W� j � �� p0 � OO ✓A TIONS � = 9425 70R = 944.85 ATION = 9428 (VARIES) =934.0 TER FOOTPR/NT OF g �ECEIVED >E lS WITHIN 6 FEET ^ � 1N FLODR ELEVATION (944.85) � � AUG 2 0 2014 � � : g o a ��1 � ��1''447��.J � O Oi � ,,. g W " Z n � ry � � c to � g `c � � � � � City o7 uronu ?750 Kelley F'arkway �Jrono MN !i5356 952-249-46U0 Receipt No: 3.011604 Aug 20, 2014 Stonewocd LLf, Planniny and Z�ning 2470 Carmen St Escrow 2.500.00 101-22205 Deferred Rev-Developer Deposit Planning and Zoning 2470 Carmen Street 700.00 14-3689 i01-34420 Cond Use-Variance-Dev Fees -------------- Total: 3,200.00 --------------- Check Check No: 12931 3,200.00 Payor: Stonewood LLC 7ota1 Applied: 3,200.OU Change Tendered: pp 08j20/2014 11:23AM Christine Mattson From: Christine Mattson Sent: Wednesday,January 07, 2015 125 PM To: 'eric j.mercer@us.pwc.com' Cc: 'Gustafson, Sven'; Melanie Curtis; Lyle Oman Subject: FW: 2490 Carman Street/#2014-01488 Attachments: Escrow Agreement - Building Permit w Erosion Control 2014-01447.pdf Eric, I had your email address incorrectly entered the first time around. My sincere apologies. From: Christine Mattson Sent: Wednesday, January 07, 2015 1:24 PM To: 'Gustafson, Sven' Cc: 'eric.j.mercer@vs.pwc.com'; Melanie Curtis; Lyle Oman Subject: 2490 Carman Street/ #2014-01488 Sven, The application submitted for Carman Street was addressed of 2470 Carman Street; however the actual address for the newly created lot is 2490 Carman Street(PID 20-117-23-12-0065). Please update your records. After a cursory review of the building permit application: • Based on a FFE of 944.85' the lowest level of the home does not meet the definition of a basement. The third story is not a half story therefore the house is defined as a three-storey house. Please have the surveyor show the 938.85'contour(944.85' less 6 feet=938.85') on the survey. easement means that portion of a building that is partly or completely below the existing ground level.A basement shall be considered as a story for purposes of determining the number of stories in a building, when the finished surface of the floor above the basement is more than six feet above the existing ground level for more than 50 percent of the basement's perimefer. The perimeter of the basement does not include portions of the house or garage that do not have a lower level but are merely "unexcavated".Artificially raising the grade adjacent to the foundarion of a structure(by filling or by a combination of filling and retaining wallsJ above the surrounding natural terrain shall not be allowed as a method for converting a defined story to a defined basement, regardless of any other benefits to the property of such action. Finished grade that increases more than one foot from existing ground level shall be considered as artificially raising the grade. However, artificially raising the grade when such action merely restores a previously excavated site to its original natural grade may used as a method for converting a defined story to a defined basement. • The resolution needs to be signed by the Mercers. They will both need to come into the office with a valid form of identification to have their signatures notarized. • Enclosed is an updated escrow agreement. Our records indicate the variance escrow for#14-3676 was paid by Stonewood, LLC. Please have the property owners sign the updated escrow agreement and note that the escrow money is refunded to the property owner of record at the time of escrow refund request. � • Your project may trigger the Minnehaha Creek Watershed District's (MCWD) perrnitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please don't hesitate to contact us if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway C Orono � MN � 55356 (physical addressJ PO Box 66 � Crystal Bay ( MN f 55323-0066 (mailing address) 'li" 952.249.4620 � 8 952.249.4616 � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Monday,January 19, 2015 z , , ������ DATE TIME CITY OF ORONO CALLED IN INSPECTION NOT CE SCHEDULED lIS " PERMIT NO. ' -' �! � COMPLETED _l�- ADDRESS �-��� �lrrY�(di'� ��. OWNER TELEPHONE NO. CONTRACTOR � DESCRIPTION � �l ���C V�� S/ � U�l� ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERlCONTHACTOR TO MEET YOU:_YES_NO c�., COMMENTS: � W a / J i.�%!r 1�1�/� b'eix /^L' �l`eG S G P�/�I'l�� � oi�ir�l�� �����f�m ots• � � ���S ��.r�� o � � Q `7�.�-� s ,���� -���a 6�s h�.d � � W � W � J d � O WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE W ❑CORRECT VYORK&PROCEED O ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (g52) 249-46�� OwnerlContrac n site: Inspector. White Copyflnspector's File Canary CopyfSfte Notice r Christine Mattson From: Adam Edwards Sent: Friday, September 09, 2016 10:18 AM To: Christine Mattson Cc: Melanie Curtis Subject: RE: 2490 Carman Street/#2014-01488 Chris, The as-built appears to conform to the intent of the approved plan. An inspector should conduct a site visit and confirm the following: 1. The survey accurately depicts conditions on the ground. 2. The site is stabilized to the point the any remaining erosion control can be removed. Adam From: Christine Mattson Sent: Wednesday, September 07, 2016 4:18 PM To:Adam Edwards<aedwards@ci.orono.mn.us> Cc: Melanie Curtis<MCurtis@ci.orono.mn.us> Subject: 2490 Carman Street/#2014-01488 Adam, Attached is an electronic copy of as-built survey for 2490 Carman Street. Please review and provide comments. Thank you. Street file and proposed survey is in your inbox. Chris� From: Melanie Curtis Sent: Wednesday, September 07, 2016 4:07 PM To: 'eric.j.mercer@us.pwc.com' <eric.i.mercer@us.pwc.com> Cc: Christine Mattson<CMattson@ci.orono.mn.us> Subject: RE: Mercer as-built survey Thank you, Eric. Yes, I will need a hard copy version as the proper printing size exceeds i1x17 paper. We will begin our review, please submit the paper version of the survey at your earliest convenience. I will note that you wish to pick up the escrow refund check, tentatively ready the week of September 26tn Melanie Curtis �'952.249.4627 �mcurtis@ci.orono.mn.us 1 From: eric.l•mercer@us.pwc.com [mailto:eric.i.mercer@us.pwc.com] Sent:Wednesday, September 07, 2016 3:51 PM To: Melanie Curtis<MCurtis@ci.orono.mn.us> Subject: Mercer as-built survey Melanie: Attached please find our"as-builY' survey including the hardcover calculation. Please let me know if you will need for me to provide a hard copy version. Also, when the check is prepared, could you let me know and we will pick it up from your office? Thanks, Eric Eric J.Mercer�Partner�Advisory Services�PricewaterhouseCoopers�Telephone:(612)596 6307�Mobile:(612)840 3412�eric.i.mercerCa�us.owc.com The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the sender and delete the material from any computer. PricewaterhouseCoopers LLP is a Delaware limited liability partnership. This communication may come from PricewaterhouseCoopers LLP or one of its subsidiaries. z