HomeMy WebLinkAbout2007-P10700 (demo) PERMIT
�ITY OF ORONO
2750 Kelley Parkway- PO Box 66 Permit Number: P10700
�rystal Bay, Minnesota 55323 Permit Type: Demolition
(952) 249-4600 Date Issued:
2/1/2007
SITE ADDRESS: 3295 Carman Rd Unit#
Excelsior,MN 55331
PID: 20-117-23-14-0014
DESCRIPTION: UBC Occupancy R3
Construction Type VN
Proposed Use: Residential
Census Code 645
Permit Class: Building
Permit Type:
Demolition Permit Sub-type(s): Demo-Principal Structure
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
Foundations/all demo debris to be removed from ground&disposed of off site per PCA regulations. Wells
must be abondoned. Inspection before backfilling.
FEE SUMMARY: Permit Fee: $ 50.00 valuation: $ 0.00
State Surcharge Fee: $ 0.50
TOTAL FEE: $ 50.50
APPLICANT: Robert Craig Homes OWNER: Mr. &Mrs. Thomas Lowe
565 Big Woods Blvd 3295 Carman Rd
� Chanhassen,MN 55317 Excelsior MN 55331
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
_.._ . �
(�C_-' �� ,
APPLICA PERMITEE SIGNATURL UED BY SIGNATURE
Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1
�
O,� ['OR CITY USE ONLY
i 0¢ ��� '��' � � Date Received: !�� Permit# �( �: �C!(i `��
�.��.� ', �
�y, �1�� �� � \ � Amount: $�'� SAC Credit: C a
�'r�
�'< ��,rJ,!�J� I v .�X.
�ESK�P Homeowner(s)Signed: ❑Yes /
�C� Resolutions(if any)Signed:Q✓ Yes ❑None Required
Zonin Disdosure Si ed: ❑Yes ❑None Re uired
�,i 1�Y OF �RONO - DEMOLITION PERMIT
(All permits must be approved by the Building Official and/or 7_oning Department)
7ob Site/ Owner Infornlation:
Type: [� Residential ❑ Coimnercial
Site Address: JZ`)� CA�'m c��,' /Z,�)
Owner: � ���+'� �-[� i.�•� C Mailing Address:
City: Zip:
Home Phone: Alteniaie Phone:
Contractor/Applicant Infonnation:
Contractor/App.: �t;n,�=2i Lt�Ai�„ ��-am�_� ContactPerson: '���
Address: `� t�5 1�1� W�0�S ���—V D State License#: ��`��
City: �-j�'��t^hi�'1�N Zip: �'�'� � Expiration Date: -������ �]
Phone: ��S� -�I�v-� (✓(� s t'i Alternate Phone: ��!Z- (ov o � 7�� 3
` SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT �
General Instnlctioils:
1. You may be required to obtain other permits, i.e.: well abandoliment, sewer, etc.
2. Worlc must not begin unless the pennit card is available on the job site.
3.._, A 24-4811our notice is required for all inspections. Call (952) 249-4600.
}� 4. �'Sewer must be discontinued at the City service by qualified contractor before demo pez-cnit is
� ;� issued.
P�•`�� �( \�� �� �
� � ,n0�,`'\�'k�\.
�`b � 'fleniblitioil by means of: ❑ Manual Disassernbly � Heavy Equipment ❑ Other
\
Permit(s) Issued: ❑ Sewer Disconnection ❑ Well Abandorunent #
In retunl for issuance of said Denlolition Pe�nlit, the undersigned owner hereby a,�rees as follows:
i. The struciure(s) shall be kept enclosed andior secured until such time as demoliiiori is
complete.
�
2. Demolition debris will be kept off adjoining property and/or the public rights-of way unless
specific prior approval is obtained in writing for temporary use thereo£ �
3. Foundations shall be completely removed from the ground.
4. All demolition debris shall be coinpletely disposed of off site in accordance with all
applicable PCA requirements.
5. Water wells must be abandoned in accordance with State Health Department regulations.
6. Inspection required when all debris has been removed, before backfilling.
7. Within 5 working days of superstructure removal, a final inspection shall be requested. The
site shall be left clean and clear of all debris, with any excavation filled with earth level with
the adjacent ground elevation (except when such excavation is to be used as part of a new
building and such new building is actually under construction).
8. Septic systems must be abandoned per Mirulesota Rules Chapter 7080. All septic tanks
inust Ue puinped, crushed and filled with native soils. An inspection is required after the
tanks are pumped and before the tanks are crushed and filled.
9. The undersigned owner shall and hereby does indemnify and hold harmless the City of
Orono, its agents, employees and assigns from and against all claims, damages, losses or
expenses, including attorney fees, against the City, its agents, employees and assigns arising
out of or resultin� from the demolition described herein as perfoi7ned by the property o��mer,
his employees, agents, subcontractors or assi�:s.
PERMIT TYPE AND FEE CALCULATION
� $50.00—Principal Stnicture
❑ $30.00—Accessory Stnicture (how many) (what)
1. Subtotal of above permit requested $
2. State Surcharge $ .50
3. TQ'?'A?, P�KMIT FEE (add lines 1-2 above) �
The undersigned herby applies to the City of Orono for issuance of a Demolition Pennit, agrees
to do all the work in a strict accordance with tlle ordinances of the City and the regulations of
the State of Minnesota, and certifies that all statements made on this application are complete,
tnie and correct.
Applicant's Signatua-e: %'�'���;-� Date: � - � � `' 7
O�vner's Signature: Date: �- 25= (]"�
Approved By: � �� J Date: � ' Z Z `07
(Buildii Official)
* Zoning Disclosure Required? []' YES ❑ NO
*This must be filled out by Zoning Department—For either answer, a Zoning Official must sign all applications.
* Approved By: M ' C • Date:
(Zoning Official)
, o�'°�o
�;,, , Principal Dwelling Demolition Permit
a��'�`� ,� ZONING DISCLOSURE & DECLARATION
� � ���
, .y}V'��5 G
�ggg08�
To the property owner: Demolition of the principal dwelling structure on a
property may automatically terminate certain rights which may have accrued to the property by virtue of the
continued existence of that building.
• Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot
area or width standards) will, with few exceptions, require variance approval by the City Council, and
such approval is neither automatic nor guaranteed but requires that a hardship be demonstrated.
• Additionally, all current zoning standards will have to be met by the new principal dwelling including
setbacks, lot coverage by structures, hardcover(impervious surface), height limits, etc.
• Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage
treatment system is mandatory.
• Unless specifically approved by the City, all accessory structures must be removed at the time of
principal dwelling demolition.This also applies to seasonal and permanent docks,which may not be re-
installed until a new principal dwelling has reached the framing stage.
The following information is presented for the purposes of advising the property owner ofthe implications ofremoval
of the rincipal dwellin on the rope
1. Property 3295 Carman Rd PIN# 2011723140014
Address:
Required Lot Area 43,560 s.f./1.0 Required Lot Width 140'
2. Zoning acre
District: LR-1 B 19,917 s.f./0.45 147'@ OHWL 114'
Actual Lot Area acre Actual Lot Width @�5' Setback
Lot area varian e is/' not required. Lot width variance is/�s not quired.
3. Required Setbacks: Front n/a Rear n/a Side 10' Side Street n/a
Lakeshore Lot: Lake(Front) 75' Street(Rear) 30'
Average Lakeshore Setb ck: must be met/ not a licable.
4. Lot Coverage by Structur : limited to 15% of lot area does not a 1 lot area>2 acres
5. Hardcover limitation • are applicable/ re not applicable. 0-75'zone= 0%allowed
75-250'zone=25%allowed 250-500'zone—30%allowed 500-1000'zone=35%allowed
6.✓ Municipal sewer is available. Municipal sewer is not available;on-site system testing and design must be
provided confirming that two conforming drainfield sites are available.
7. nla Wetland(s)present.
The undersigned property owner hereby acknowledges receipt of the above information. Staff Initi s
.,
, ,`/
/ -'� % 2�= D.7
Property wn�'s Sig ture Date
✓
Form ZDD—Revised 5-23-OS (Original: Street File; Copy: Property Owner)
�- � �'
�D`A� TIME �
CITY OF ORONO CALLED IN
INSPECTION N TICE SCHEDULED o2'L � •�
PERMIT NO. ��� COMPLETED
ADDRESS
OWNER CONTR.
TELEPHONE NO. �P�o� ,��� 5a5S
� DESCRIPTION �
l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADWG/FILUNG
� 02 FRAMING 13 MECHANICAL FINA� 19 LAKESHORE/WETLANDS
ti
O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q OS FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
� 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS: "
�
a S
�
�
� � L �` Q v t!�
0
Q_SD c (�(��'� d rs� ,.
�
Z
W
�
W
�
�
d
W WORKSATISFACTORY:PROCEED Ci PROJECTCOMPLETE
� ❑CORRECT WORK&PROCEED � ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. �:; PHOTO TAKEN
INSPECTOR WlLL RETURN
❑ CITATION ISSUED
❑STOPORDER POSTED.CAII INSPECTOR
G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� Z49-46QQ
OwnerlContra site:
, �
Inspector.
White Copyllnspector' File Canary CopylSite Notice