August 16, 2007
Dear Owner of 410 BIG ISLAND:
This is a friendly reminder to all Orono property owners with non-compliant, on-site septic systems:
Septic System Upgrade Deadline is Fast Approaching
Beginning in the mid-1990s the City began to identify those septic systems that made use of trench
drainfields, a majority of which do not maintain the minimum required vertical separation above
seasonal water tables. Each existing system was subjected to soil borings to determine the seasonal
water table depth. When a system was identified as non-compliant, the owner was notified of the need
to bring the system into compliance and given several years to complete the upgrade.
The deadlines to upgrade were divided into whether or not the property was in the Shoreland District
(within 1000' of a lake or within 300' of a protected tributary stream). Properties in the Shoreland
District were given until December 31, 2007 to become compliant. Properties outside the Shoreland
area with non-compliant systems were allowed until December 31, 2010 to conform to the septic code.
The above noted property is located in the Shoreland District and needs to be updated before
December 31, 2007.
Don't wait until the last minute! The City is strongly recommending that property owners not wait
until the deadline arrives to bring their systems into compliance. The process to upgrade your septic
system can be quite lengthy. The first step in the process is to hire a site evaluator and designer to
determine what type of system is required and provide the blueprint for the system installation.
Secondly, the property owner must then contract with a septic system installer to have the system
constructed.
The installation of a septic system is very weather dependent, especially for mound systems, which can
only be installed when the ground is relatively dry, i.e. typically June through September. Contractors'
schedules fill up quickly, so it's important to start your planning and design process now to ensure a
timely installation. The period of time from deciding to update your septic system to the actual
installation can easily exceed three to four months, or more. Please contact the Building and Zoning
Department at 952-249-4600 with any questions you may have about bringing your septic system into
compliance.
For a list of licensed designers and installers you may go to www.ci.orono.mn.us, click on
City Departments, click on Septic, then click on the link to www.pca.state.mn.us.