My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
940 Brown Road South - PID: 10-117-23-12-0004
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:18:35 PM
Creation date
2/8/2016 12:24:10 PM
Metadata
Fields
Template:
x Address Old
House Number
940
Street Name
Brown
Street Type
Road
Street Direction
South
Address
940 Brown Road South
Document Type
Septic
PIN
1011723120004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' .r.''�F� <br /> , i� " ,.� f"r�'���t"� <br /> � O� �',� � ��'`�� r� CITY OF ORONO <br /> �}.. <br /> ., <br /> ���;� EPTIC S�'STiEM APPROVAL <br /> � �� � , ,�,;;, <br /> ��4`� � � ' �� �I'�'Y of ORO�TO <br /> F `.�� �' . �'.:�r <br /> � � l <br /> � ' . � ��n� MLLf11C1�Q�1CCS <br /> � �� // yE ),. �t � . <br /> L ���' <br /> ,� � '� ���� ti `� ����'` Post Of'Pke Box 66 <br /> �� ��•�tr�{ ����''�� Crpstal Bay,Minnesota 55323-0066 <br /> kESH�� <br /> LOCATION: 940 Brown Rd. S. <br /> OWNER: Alex & Cathy Johnston <br /> GENER.AL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S-P Testing REPORT DATE: February 4, 1998 <br /> The City of Orono has Approved your on-site syste�design as of February 9, 1998 <br /> (approved-disapproved) (date) <br /> with die f 'ng conune ts: <br />' � <br /> THIS IS NOT A PERMIT. This is a design a f r ich must acco th it pl . A permit must <br /> be issued to a licensed septic contractor pri insta ation. A list of cu e ic ept' contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and s cs m ve ior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF RONO <br /> By � >� ----._ <br /> .� <br /> Stephen c an, On-site Systems Manager <br /> TELEI'I iONE-473-7357• FAX-473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.