Loading...
HomeMy WebLinkAbout2012-00891 (new structure) � � CITY OF ORONO • * 2 fd 1 2 — 0 0 8 9 1 * 2750 KELLEY PARKWAY DATE ISSUED: 10/02/2012 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 4495 BAYSIDE RD PIN : 06-117-23-21-0004 LEGAL DESC : UNPLATTED 06 117 23 : LOT 000 BLOCK 000 PERMIT TYPE : NEW STRUCTURE PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : S[NGLE FAM[LY ACTIVITY : 101-5[NGLE FAMILY HOUSES,DETACHED VALUATION : $ 339,000.00 NOTE: SEPERATE PERMITS REQUIRED:PLUMBING, MECHANICAL,SEPTIC,FIREPLACE,LAWN IRRIGATION, WELL(STATE), ELECTRICAL(STATE) NOTE: AS BUILT SURVEY REQUIRED PRIOR TO CERTIFICATE OF OCCUPANCY ISSUANCE. INITIAL:� NOTE: BE AWARE, IN THE EVEN"I'WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVEY AT TI IE TIME THG CERTIFICATE OP OCCUPANCY IS REQUESTED,A TEMPORARY CERTIF[CATE OF OCCUPANCY MAY BE ISSUED UPON REC IPT F A$10,000 ESCROW TO ENSURE COMPLETION OF THE AS-BUILT SURVEY AND ALL SITE IMPROVEMENTS. INITIAL: APPLICANT PERMIT FEE SCHEDULE 2,490.75 KATHER[NE TAYLOR HOMES, INC. STATE SURCHA.RGE(VALUATION) 169.50 120 RAILWAY STREET W PO BOX 35 TOTAL 2,660.25 LORETTO,MN 55357 (763)479-0301 Minnesota State License#: 4738 OWNER Preservation Properties LLC 145 RAILWAY ST W PO BOX 35 LORETTO, MN 55357-0035 AGREEMENT AIYD SWORN STATEMENT The work for which this pennit is issucd shall be performed according to the approved plans and specitications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specitied herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of I 80 days at any time alter work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Quilding Code."I�his permit may be revoke t any time for due cause. � r� , � , �� �-�� , , p ican Pe itee ignature Date Issued B gnature Dat SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABO . . City of Orono ���a, �S Building Permit Application for New Structures or Additions Mailing Address: O/o� q /-.�j,��,�.� PO Box 66 Permit number. a ��� � �� �\ � Crystal Bay, MN 55323-0066 Date received: 9`7'� �' '� n` i i ,�� Received by: � �,� �✓J�l,�-:'.� �,;; � Street Address:� '� ,`�., �'.'��Rw�� �ti'' � ' 2750 Kelley Parkway Plan review fee: —l�� � \\'�xESKog� � Orono, MN 55356 �� `_-—= Total Fee: � �L Main: 952-249-4600 Fax: 952-249-4616 www ci.orono.mn.us Lcj(j�j � , This application form must be completed in full and all required information must b mitted. 20t2_('��C�(p1 Incomplete applications will be returned. (Please print) GENERAL INFORMATION: Job Site Address: �1�J �JA.�5�i�c 1��-� Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes [� No If yes, a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: -1 � � T �-v2 S -�z�lu ll��- State License# Expiration Date: � j j�( Phone: �fyj'Z - �/�'� -�c'�O (office) COi�—3(�a(v' (ol�I (cell) Mailing Address "'� �3� Cit : � , ZIP: �- Contact Person: ��c,.�,rL-TN'c ' �µ, `V Applicant is: ontrac o / Homeowner (Circle One) Email and/or Fax. �t�y t�r � {�c?�t�tt-G'irta��c.rl�'�j'JOh'l,G'S, ����►�'� PROPERTY OWNER INFORMATION: Name: y ��C-� �Jc�ut-►� Phone (day): - 20-� Address: City: ZIP: Email and/or Fax --tvbi hc�J`�� �' G2AL GDYn ARCHITECT/ENGINEER INFORMATION: Name: �U hG�..� rj�-{'1n.2_ Phone (day): [o�J -1.��J�� ��5�, Address: c. �i' Cit : �U,r,ati: ZIP: �i Email and/or Fax: �j � :-/�3�-� �(� PROJECT INFORMATION: 1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply �New Construction �Single Family with �Residence Addition attached garage Garage/Accessory Bldg. ❑ Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial �Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water "Any earth movement may require ❑ Commercial ❑ Other(specify; MCWD review&permits. ❑ Industrial �,Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (speCify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation (excluding land) $ �J�J�t Uc��' c� Packet Last Updated: 03-06-2012 -21 - STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a. Length (ft.)= �� Number of bedrooms= ��' �N/ood/Frame b.Width (ft.)= �� Number of garage stalls: �Masonry Areas in spuare feet Attached =� ❑ Metal ❑ Pole Bldg. c. Basement= +��Z Detached=� ❑ ICF d. 1 S`Story = ��n� ❑ On-site Prefab e. 2"d Story= �Z� � ❑ Off-site Prefab f. 'h Story = ❑ Other(please specify): g. Total Area= � REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ Permit A lication ❑ Pro osed Buildin Plans ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form ❑ Surve (meetin all re uirements) ❑ Stormwater Pollution Prevention Plan ❑ Hardcover Calculation(s) ❑ Septic S stem Site Evaluation Re ort ❑ Access Permit ❑ Wetland Buffer Im rovement Plan ❑ En ineered Plans for Retainin Walls 4 feet or above ❑ Plan Review Fee ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; . Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a femporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. ApplicanYs Signature: —�����.�.����=(� Date: �'II7I lvL Owner's Signature: Date: Packet Last Updated: 03-06-2012 -22 - ���o C ITY OF ORONO � � Street Address: Mailing Address: Telephone(952)249-4600 � ` 2750 Kelley Parkway P.O. Box bb Fax (952)249-4616 F �,y �,�' Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us kF s H o� September 26, 2012 Courtney Taylor Katherine Taylor's Homes, Inc. PO Box 35 Loretto, MN 55357 Re: 4495 Bayside Road Building Permit Application#2012-00891 On September 7, 2012 the City received a building permit application for a new principal structure. Our engineer has reviewed the survey dated September 06, 2012 and has the following comments: • The survey shows there are two existing structures on the site. A review of the street file shows these structures were demolished in 2009. • It does not appear there are any planned retaining walls, but if walls are installed in final grading any walls over 4' in height or tiered walls which are not separated by 2x the higher wall (as measured from the face of the upper wall to the back of the lower wall)will need to be designed by a registered professional engineer. The following item must be submitted in order for your application to be considered complete and for the plan review to continue: 1. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project is $2,500. The escrow agreement is enclosed. The property owner must sign the escrow agreement and submit a check for$2,500. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by emai)at cmattson@ci.orono.mn.us if you have any questions. Sincerely, CITY OF ORONO ' �11'� � Ch ' t e a tson Planning Assistant c ctaylor@katherinetavlorshomes.com; lisa@katherinetavlorshomes.com Mark&Shelley Souers at tobihouse@aol.com enclosures Jesse Struve From: Jesse Struve Sent: Friday, September 14, 2012 4:50 PM To: Melanie Curtis Cc: Christine Mattson Subject: 20120914 4495 Bayside Rd -2012-00891 I reviewed the permit application for a new house and have the following comments: • There are two existing structures on the site. Are these structures going to be removed with the construction? • It does not appear there are any planned retaining walls, but if walls are installed in final grading any walls over 4' in height or tiered walls which are not separated by 2x the higher wall (as measured from the face of the upper wall to the back of the lower wall) will need to be designed by a registered professional engineer. Since both of these items do not need to be addressed on this survey but can be updated on the as-built survey, I signed the permit and stamped the plans approved. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661 - Direct (952) 249-4616- Fax www.ci.orono.mn.us i Melanie Curtis From: Melanie Curtis Sent: Friday, September 28, 2012 1:57 PM To: 'David Crook' Cc: 'lisa@katherinetaylorshomes.com'; 'shelley@cityofwoodlandmn.org'; 'ktaylor@katherinetaylorshomes.com'; 'Courtney Taylor' Subject: 4495 Bayside Road /#2012-00891 Dave I am reviewing the survey & plans for a new home at 4495 Bayside Road and I need more information to continue my review, specifically first floor and lowest floor elevations. Our engineer has already approved the grading plan but I need the floor elevation information for the zoning review of building height. You can email me the information but before I can issue the permit I will need 2 scaled copies of the survey with the information. Thank you. Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning &Zoning Office 952.249.4620 Email: mcurtisCa�ci.orono.mn.us Website: www.ci.orono.mn.us City of Orono Office Hours Monday - Friday 8:00 am - 4:30 pm 1 , , . Melanie Curtis From: Courtney Taylor[ctaylor@katherinetaylorshomes.com] Sent: Monday, October 01, 2012 8:34 AM To: Melanie Curtis Subject: RE: 4495 Bayside Road /#2012-00891 Hi Melanie, I sent the survey in for printing and should have that to you by 11 am today. Courtney COURTNEY TAYLOR PARTNER&DESIGNER KATHERINE TAYLOR'S HOMES, INC. P.O. BOX 35 145 RAILWAY STREET WEST LORETTO, MN 55357 (0)952-473-6500 (F)952-473-6501 http://www.katherinetaylorshomes.com From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Friday, September 28, 2012 1:57 PM To: 'David Crook' Cc: 'lisa@katherinetaylorshomes.com'; 'shelley@cityofwoodlandmn.org'; 'ktaylor@katherinetaylorshomes.com'; 'Courtney Taylor' Subject: 4495 Bayside Road / #2012-00891 Dave I am reviewing the survey & plans for a new home at 4495 Bayside Road and I need more information to continue my review, specifically first floor and lowest floor elevations. Our engineer has already approved the grading plan but I need the floor elevation information for the zoning review of building height. You can email me the information but before I can issue the permit I will need 2 scaled copies of the survey with the information. Thank you. Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning &Zoning Office 952.249.4620 Email: mcurtisCa�ci.orono.mn.us Website: www.ci.orono.mn.us City of Orono Office Hours Monday - Friday 8:00 am - 4:30 pm 1 ��r�.�+a�nr+um�eaams.t�w;��waa�s�r.y.;,;?�4 .:s,in„tq�,�-'�anzhrtin:-rr�ans�ueu^..s»�«at.v�:+�°try.�rxres�s�.�.:�.vwa�#ra�n7€qIISC��:��:�� ;� �'} � Plan Revievv Checklist for �Vew Structures / Adc�itions r F� Address/ PID/ Legal: ��� � ,� �� �� ��� �� (� � r �' Description of work: �� �� � �� �� Septic review by: � Date Approved: �s E� '� ( � Zoning review by: (/V � Date Approved: �����- Buifding revievv by: Date Approved: �'� �. �"�`� Grading review by: .y�- Date Approved: � i Zoning File#: Resolution #: Resolution Date: Zonin District Fire Department Post Office School District ��� � b � , i Zoning: Lot Area: � .ID��� �fi`�� SF/AC Width: ��� Depth: ���-� Survey Submitted: es � No Date of Survey: � � �� Proposed Setbacks: � Front( ke} Rear(Str ) � N S E W ) c N Side W { Other�uildings V1letland � ���� � � �� E � ��� � z Building Defined Height: Building Peak Height: � � #of Stories Ok?: Y S ' ' � FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDA In: � � START WITH the distance between the basement floor/crawl START the distance belween the slab and the highest space floor and the highest roof peak,the top of WITH roof peak,the top of the cornice of a flat roof, c� the cornice of a flat roof,the deck line of a the deck line of a mansard roof, or the mansard roof, or the uppermost point on a round uppermost point on a round or other arch-type or other arch-t e roof roof ��!),�;, SU , - If the distance between the highest window and SUBTRACT half the distance between the highest window �� e i hest roof eak of a itched roof and hi hest roof eak of a itched roof � ( SUBTRACT the distance between the basement floor/crawl ADD the distance between the slab and the highest ot�` j �, e space floor and the highest existing grade within existin rade within the foundation the foundation or 10 feet,whichever is less. EQUALS Defined buildin hei ht EQUALS d buildin hei ht � Lot Coverag : ' �� SF �� % Shoreland District MGWD Permit Receivec! Avera e Lakeshore Setback �luff � Yes � No ❑ N/A � Yes No 0 Yes No ❑ Yes � No �/A Permit Number. � Setback: ; Nardcov r Zones Existin �roposeci �lariance Requi ci CUP Re uired � - 5' Q Yes No � Yes No 7 -�50' Type(s}: Type(s): 2 500' 50 -� 000' REMARKS (in-house): Updated: 09/11/2009 z:\forms\plan review checklist.docx Fees to be Char eci YES NO Permit Plan f�eview State Surcharge Investigation Fee SAC—tVumber of SAC Units �,� �`° Sewer Connection Water Connection � Park Fee Site.Inspection Other(specify) Miscellaneous Fees ; Calculated By: S uare Foota e $ er S uare Foota e Basement X = $ 1 S' Floor X = $ 2nd FlOOr X = $ Garage X = $ Estimated Construction Value: $ ���,�f�� �� Orono Inspections Required Work Requiring Separate Permits Requireci State Permits � � Site �Plumbing 0 Grading / Filling �Well 0 Hardcover Removal Ja'Mechanical 0 Fire �Electrical ,P�Footing �Septic � Water Connection �Poured Wall �Fireplace � Sewer Connection �Foundation Survey C] Masonry ,0� Lawn Irrigation �'Radon Rock Bed �Mfg. �'Framing 0 Other(specify) �Insulation �'As-Built Survey �Final �` 0 Other(specify) REMARKS (in-house): Qther f2e�ieav: Reviewed by: Date Approved: Access:Existing: ❑ YES � NO New: ❑ YES 0 NO REMAI�KS (�O BE NOT'ED ON PERMIT AIVD IN171ALLED BY PERSON PUL�ING PERM{Tj Updated: 09/11/2009 t` z:\forms\plan review checklist.docx �:,: „ � Y. .:.., , :.;.. , . � � _ �;.�:�����-�`��.��°�'"'� . . - _ '�`�. ' °��� . .. . � . • • . • • 1 . emo To: Finance Department From: Chnstine Mattson, Planning Assistant CC: Street File Date: September 4, 2013 G/L: 101-22205 �' � Re: Escrow Refund Building Permit#2012-00891 pertaining to 4495 Bayside Road is complete. The Applicant, Mark 8� Shelley Souers, has requested a refund of their$10,000 escrow. The following is attached: • Email from Bolton & Menk indicating no unbilled WIP on this project • Email from Campbell Knutson indicating no unbilled WIP on this project • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Mark 8 Shelley Souers 4495 Bayside Road Maple Plain, MN 55359 w:�.street fileslbayside road44495\escrow refund memo 2012-00891.doc Christine Mattson From: David Martini [davidma@bolton-menk.com] Sent: Wednesday, September 04, 2013 9:23 AM To: Christine Mattson Subject: RE: Unbilled WIP Chris, It looks like the only WIP we have for these projects is an hour of Mark Perry's time ($87)for 3245 Watertown Road. Let me know if you have questions. Thanks. David P. Martini, P.E. Bolton 8� Menk, Inc. P: (952) 448-8838 ext. 2458 M: (612) 756-4315 email: davidma(c�bolton-menk.com From: Christine Mattson [mailto:CMattson@ci.orono.mn.us] Sent: Wednesday, September 04, 2013 8:20 AM To: David Martini Subject: FW: Unbilled WIP Hi Dave, I need to prepare my escrow refund memos this morning. Will you have a chance to look for any unbilled WIP? Thanks! Chris^' From: Christine Mattson Sent: Friday, August 30, 2013 11:42 AM To: David P. Martini; 'Sherry Charboneau' Subject: Unbilled WIP Hello, Any unbilled WIP for the following: Building Permits 2013-00119 3245 Watertown Road Carl &Andrea Rhame 2012-00891 4495 Bayside Road Mark&Shelley Souers 2012-00728 2280 Fox Street Lynn &Anders Myhran 2012-00554 3186 North Shore Drive Michael Jones Thank you! 1 Christine Mattson From: Sherry Charboneau (SCharboneau@ck-law.com] Sent: Friday, August 30, 2013 12:52 PM To: Christine Mattson Subject: RE: Unbilled WIP Christine: No unbilled WIP for Campbell Knutson. Enjoy the Labor Day Weekend! Sherry Sherry L. Charboneau Legal Assistant CAMPBELL KNUTSON P.A. 1380 Corporate Center Curve•Suite 317• Eagan,MN 55121 "�" (651)234-6230• Fax: (651)452-5550 � scharboneauCa�ck-law.com•www.ck-law.com From: Christine Mattson [mailto:CMattsonCa�ci.orono.mn.us] Sent: Friday, August 30, 2013 11:42 AM To: David P. Martini; Sherry Charboneau Subject: Unbilled WIP Hello, Any unbilled WIP for the following: Building Permits 2013-00119 3245 Watertown Road Carl &Andrea Rhame 2012-00891 4495 Bayside Road Mark&Shelley Souers 2012-00728 2280 Fox Street Lynn &Anders Myhran 2012-00554 3186 North Shore Drive Michael Jones Thank you! Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356 (physical addressJ PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ � 952.249.4620 � 952.249.4616 I� cmattson@ci.orono.mn.us � www.ci.orono.mn.us Summer Office Hours: (Monday, May 20 through Friday,August 30,2013) Monday-Thursday: 7:30 am to 5 pm 1 TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW AGREEMENT Orono Building Permit#2012-00891 AGREEMENT made this �� day of , 20�, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") nd Mark& Shelley Souers ("Owners"). Recitals 1. Construction of the new residence located at 4495 Bayside Road the ("Subject Property"), legally described as see Attachment A, is the subject of building permit application number 2012-00891 has been completed. 2. Winter conditions currently prohibit completion of exterior improvements, final grading, and vegetation establishment. An as-built survey cannot be accurately conducted at this time. 3. Owners request the City issue a temporary certificate of occupancy ("TCO") to the Owners so that the Owners may occupy the new residence. 4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of exterior improvements, continuation of erosion control and submittal of an as-built survey to the City. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow , Agreement, the Owners have already deposited with the City $2,500, an additional $7,500 shall be �i, deposited, for a total of $10,000. All accrued interest, if any, shall be paid to the City to reimburse the �� City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of I Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2012-00891 if corripliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 155441 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. 7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents, employees, officers and contractors, the right to enter upon the subject property for the specific purpose of inspecting and completing any exterior improvements, final grading, establishment of vegetation and the restoration of the subject property should the Owners not complete the work by the specified dates. CITY: CITY OF ORONO OWNE�S ' ) i. �� � By:���C�l%���i2�'�-�J !� � ;'j.�� `�,�� � �ts: I��thnr-r�► ���� C'�'�r��-- ` � `—� ' ,�� Internal�e' � � k�� � .r��._ ������t ... ._.n.. .. ,_.._�,��p� A��'�e �_,, �.. ..s����- .__� .� e,.�,,�.._� . . �..._ � , s.��_.' �, 155441 BUILDING PERMI7 ESCROW AGREEMElVT Orono Bullding i'ermit#2012-00891 ATTACHMENT A-LEGAL DESCRIPTION � � That port of fhe Northeast Quarfer of the Northeast Quorter of the Northwest Quvrter, Secfion 6, Township 117, Ronge 23, described os follaws; ommencing af the Northwest corner of said Norfheost Quorter o the Northeast Quorter of t�e N Q orter Quorterr� 165 feet; East alon the North I1ne of sord Duo fhence S uth parolle! wifh the West li�e of sQid Quorter 4uorter CJuanter 8 feet; thence West poral/e/ with the Nort`h fine of said Quarter or#er Quvrter 165 feet; to o point in the West line of soid Quorter arter Quarter; thence North ofong said West line 528 feet fo the p ' t of beginning, occording to the United Sfotes:.Govemrrjent Survey th reof ond situote in Hennepin County, Minnesota. i . . .. .'.;.. .. ....._ ' . . . . . . . ...I i�,l i r .` �nnvi 4 . . .,)i� �tC�lt.'i }:� . . � _ . . .. i .. l�yf.iYlLl �h,� 'rr��;�tiety � � . � . �J . ��� �f}� rryfi ,I "h�Cifl,ri:J !'iE���j�� �i�: :. �EtJ�+b�u I i riCt!` � '�,°iw i �rP' Vfl�,"�i .'jGl,t„a�._ I ���li� �'� ' '�� Ysl?�y 1 � d bl��(� � � �� � 4�-�k`i� �~ C�� ^ �F f''�sf 7 f F:� ,.��r' �,y�f � f�L�RE:L�J�`� � ' . . .. � "`!{'�."Y`�3� �y.s:t....(u. .. .. . . S! il� .:�.',]5 . ���";;+;;;'� i�4,3.' _ � l; i .•`iEL``r, �`�� i : ('�'�'Ce� J`��i� ;,�r. . .�� ...._ __- . , '}ttY;"sY + ' .:ir';1�i•�r � �+d � �.Lrp.^ °J�G.. fdCh`=Z*';:; � a �-`�? �1�7 � � r ''�'��' '��r:;�e� ` ` -- — � � �:�. �ja�%�;�5;�r,1.,� is� �. �-_ . �`� � aiD; I _I � j i /�I��'C �`-� ` DATE r TIME � CITY OF ORONO CALLED W � � � L INSPECTION NOTICE /��-.� SCHEDULED �a PERMIT NO. ��DI� LJ[iC��1COMPLETED ADDRESS � �� � F� �-���1�� � OWNER TELEPHONE NO. �� � a:3� � �i�I CONTRACTOR `'1 - � K >; DESCRIPTION ��r �- �I Yl�', � �►� C = �, � � t� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS � O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL � ❑ PLUMBING RI ❑ S�FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU: YES_NO � COM ENTS: W �' '� �{— 0. � �. �3l o � v �� � ��� � � tl• A•"A �-I tC R g�G�S EN '�-r r%U�' W C3 Asen�t-e�- ,�Q�ctS C���n.��J � Q � � _ .� � �• • � � W � � � a W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK R PROCEED G ISSUE CERTIFICATE OF OCCUPANCY W 0��QRRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL RETURN �STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. �952� 249-46�� OwnerlContractor on site: Inspector. ` White Copyllnspector's File Canary CopylSite Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION OTIC SCHEDULED PERMIT NO. �C �� ��--��� �COMPLETED ADDRESS L��� � i3 ��� j' �'� OWNER TELEPHONE�VO. CONTRACTOR � �1 �"� ��� �'-�v►^^�S �: DESCRIPTION �_��l-�• C � O ` � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: Q � , .. ,S �. S � � : .�� � �/ �,�/ , 1 , ��/� 0 �f n ,�G. � X � cs -�c>.l' �'r--!!�c� d/l � � � D �.- U� w,� �` � s�,� � C3 �f ��i � �s,ad�3 � _ � � i3�� 1 -�- ���U��f ~r� ������`s � Q � Z � �-- �' � �'C�S.s ��s ,�.� �c�.,� t �1-� c� � W � � � � d � ❑WORK SATISFACTORY:PROCEED i�ROJECT COMPLETE W ❑CORRECT WORK 8 PROCEED �UE CERTIFIC CCUPANCY � ❑CORRECT WORK,CALL FOR REINSPECTION EMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pH0T0 TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952� 249-4600 OwnerlContractor on si : Inspector. White Copyllnspector's File Canary CopylSite Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOT^ICE/y�R Q� SCHEDULED d av �-- PERMIT NO.?A I e�"WV COMPLETED ADDRESS �-I�-�.� S� � � � � � � �G OWNER �^•��`"<<d � TELEPHONE NO. CONTRACTOR ���-S � DESCRIPTION ( "� �O� / ��l� � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORFJWETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q �FIADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEEf YOU:_YES_NO � COMMENTS: � W a � J � _-l� � �u. 0 � W � Q � Z W � W � � d � RK SATISFACTORY:PROCEED I; PROJECT COMPLEfE W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALI FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CAIL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. �952� 249-460� OwnerlContractor on s' e: Inspector. ^ White Copyllnspector's File Canary CopylSite Notice � ���� DATE TIME 1 / CI OF ORONO CALLED w Z Z�� �2 �� INSPECTION NOTICE SCHEDULED Z �� PERMIT NO.,�'�I���� COMPLETED ADDRESS �/y �`.-� ��-�->Si �� /2�,i OWNER TELEPHONE N . 11'�:� � 3�'!� ��(3� CONTRACTOR � � � %�`nro� � DESCRIPTION /�a/'�/�t� ,,L�,��/C� � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEP C FINAL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOH TO MEET YOU: YES_NO � COMMENTS: -�C� (f v1�! �l Z�G'i� > � ' ���i Z. W a o �T`.A� ����i �,/'.� /\I�/G�c�� �` �O� � - v-� L 1 C��V �-<c�,,�rt- � g-,�.� ��►-��- PC��{ � W . � Q � z W � W � � d W I�IMORKSATISFACTORY:PROCEED G PROJECTCOMPLEfE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. O PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call forthe next inspection 24 hours in advance. �95Z� Z49-4600 OwnerlContractor on site: Inspector. White Copyllnspector's File Canary CopylSite Notice �— � �v� DATE TIME ` � CITY OF ORONO CALLED IN J -�-/3 �� INSPECTION NOTICE G SCHEDULED /-�-�3 a�'� PERMIT N0.Q���1—��/� C MPLETED ADDRESS � -� OWNER .TE�EP,H NE NO. �I-Sa� �j��-���- CONTRACTOR 4✓' 4� >; DESCRIPTION ��� �L���� '� ` � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL � ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOFi TO MEET YOU:_YES_NO � COMMENTS: � W a � J O >. � O � W � Q ti 2 W � W � � a W ��VORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALI INSPECTOR �CITATION ISSUED O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call forthe next inspection 24 hours in advance. (952) 249-46�� OwnerlContractor on sit : Inspector. �.-� �� u � White Copy/lnspector's File Canary Copy/Site Notice DATE TIME Clfli OF ORONO CALLED IN INSP�CTION NOTICE SCHEDULED � PERMITNO. ��2 "��I COMP ETED b'1'"1-: ADDRESS ' � � OWNER TELEPHONE NO. CONTRACTOR �: DESCRIPTION � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHOREM/ETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOH TO MEEf YOU:_YES_NO � COMMENTS: � ��t ��- �u��� — �� a � J O � � O � W � Q � Z W � W � � d W WORKSATISFACTORY:PROCEED CI PROJECTCOMPLETE � �O CORRECT WORK 8 PROCEED C' ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CAIL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWiTHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ IfVSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. (J52� 249-4600 OwnerlContracto o site: Inspector. _ � , White Copyllnspector's File Canary CopylSite Notice � �TE TIME � CITY OF ORONO CALLED IN �0 ,L� �—�— INSPECTION NOTI E SCHEDULED /� _L� PERMIT N(3?Za����/ MPLETED N Z N ADDRESS � � � �- OWNER HONE NO�� � 3 8� CONTRACTOR � � �: DESCRIPTION /����i S �� G����" � � OOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL O ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION , Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W 0. � J O � � O � W � Q � 2 w � W � � d W ORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITION WITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952� 249-4600 Owner/Contractor Inspector. White Copyllnspector's File Canary CopylSite Notice c7`� � ��T TIME � CITY OF ORONO CALLED IN � INSPECTION OTICE � ' SCHEDULED /O /Z ��� PERMIT NO. � COMPLE7ED P ADDRESS ��J ��.'[''C�L`,`-� �<-'`=' OWNER - TELEPHONE NO.��z 3�"8 � �� CONTRACTOR /� i������Z !�C-�.. �: DESCRIPTION ��� �� � tL ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION O WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOH TO MEET YOU:_YES_NO � COMMENTS: � W C O �� 1� '�' <<� � � � O � W � Q � Z W � ti � � GW �ORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE � O CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL RETURN ❑ GTATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. �952� 249-46�0 OwnerlContractor on site• ' Inspector. l��l.�l�� — (� White Copylinspector's File Canary CopylSite Notice