Loading...
HomeMy WebLinkAbout1983-11-17 Septic System Design Report. « Sv. k I *• -C hf.A A. I:: »% ^ ■■■ i;. ■ V I ft A E- ROBEr^T if JOAN DmYTCN LOT I, BLOCK 1 JCHN’i.rONS PRT^.KCH L/iKE SECOND addition Il-l7re3 System Design 1 • Percolation Hate. Tvr.e of System. 1.75 minutes rer inch. Stanaerd System. Pporosed Plow Rate. 75C a.P.D. 3. Soil Treatment Areci Required. 0.03 percolation factor x 75^ G.P.D. is 6A‘^ So. Ft. minimum. 4. Size and Fumber of trenches. 4 trenenes 65 feet lon£^ x 3 feet wide is 76C So. Ft. These trenches i%culd be rc.-.ced 7,5 feet apart center to center, ind be L-3 feet deep in tne iij-tiral soil. 5. Drainficid rock Heoili-ecJ. 43.5 cubic yds. of rock is needed to have Ic inches jnder end e. Inches ever a )+ inch distribution pipe. 6. Septic Trunks. 2 seotic tanks each of 1000 g-allons are recominendcd. In ada- Itlcn, a third pumping tank with a pumr or else a pumping ccmpartirient in the second tank is needed to reach the higher drainfield area. Another ootlon is to run gravity from the first floor end use an e;5ector pump from the basement bath- roo:r.s. 7. Additional Information. Since the drinfield arte is rartly in an area thj-.t v.'-s not tested, if soils ether than sand are encountered, then i'.tre drainfield area will be needed. Sincerely, FERCCR, INC. S. Oronbsrg, F.Er ■ 1 :V. % 1 « i A , ' J -i » ■ ■-■=>■ ..mBHBWiBWi**>*^*****^*^*|a 4 . V V- f- t;- L-; r t '« . r i r- • JOHNSTON PROPSRTT LOT 2» BLOCK 1 Raaulti ffglit »^9ii P-1 p.2 P-3 P-4 P-5 P-6 Coarse Send Coarse Sand Lt. Bm« Fine Sand It* Bm* Fine Sand Coarse Sand Lt* Bm* Ked* Sand avg. percolation rate for holes l-4(prlxnary site) « 1*6 UI. The arg, percolation rate for holes 5-6(alt* site) • 2,1 i:?!. Pereolation Rate 1*1 mn./inoh 1.0 1.7 2.5 1.3 2.9 Soil Borings SJI. # 1 DepthCft,) 0*0-1*0 1*0-2*0 2*0-3.5 3.5-6.0 6*o-e*o Katerial Black Loan Oray Brown Loam Bro)«m Kediton Sand I t* Bm* Kediun Sand Lt* Oray Brn. Pine Sand No mottled soil or water table after 24 hours. S,B. / 2 DepthCft.) 0*0-1.2 1.2-1.5 1.5- 1.7 1.7-3.0 3.0-3.6 3.6- 5.0 3.0-6.5 Katerial Black Loan Hard Brown Clay > Broim Clay Loam Brown Loam % Brown Medium Sand Lt* Brown Fine Sand Coarse Sand(Rock encountered) No mottled soil or water table after 24 hours* s.B. Material Black Loan Brown Clay Loam Brown Loam Brown Medittr. Sand Dapth(ft«) 0*0-1.3 1.3-2.6 '.2.6-3.7 3.7-i>.5 ^•3-6.0 Oray'Bm. No mottled soil or water table after 24 hours. '1-. 4 4- ti r >; )■ L' •? I' fc.. .1- *- «- 0 ' 'V. '• CITY OF ORONO SEPTIC SYSTEM APPROVAL 1 7// w LOCATION2^,%ux^l^ ^ ^r>r^.CJ^9UGENERAL CONTRACTOR SEPTIC CONTRACTOR_ _ _ _ _ _ _ _ _ _ _ _ OWNER ^a«err~ f T>A*f7T>/0 APPROVED APPROVED: NOTE CHANGES BELOW ( 3 COMMENTS Cr2S S--C. -btU^A/Z^lt^ i^/AJ, t^etP U 2--)ODO -nuJI^S. A<se, iagiH^ T/^k/ W srg»h/>w 0F ^v^C4<ps«r %AX/^C, ^jiCAy/TV 6Vy*<e»<- pLcc^e^ Pur^/^ ^S»*^TT Tt> W^S’ jr/mfLAc^ 5io/L^ A1 o/C //-2S1-B3^ DATE APPROVED -2^ BY: « PROTECT DRAir’FlELD AREA DESIGNATED DRAINFIELO SITES SHALL BE STA­ KED OFF PRIOR TO COMSTRUCTION OR EXCAVA­ TION IN THE AREA. THE DRATiFILLO AREA SHALL REMAIN LMlISTRHOEO L'N'HL CRAIuMELD CON- STFuiCTIO'! IS COMMEIISiO. I'.O VEHICULAR TR.''': 0 <■'>■ STOCkPILIMO I.- ERl SHALL RE ALI' ''LR ' .'i i;.^ DESiS:".;:;'; C" 'Nr(E;.D AUKA OR A T;'. IM E OR AriM. i. l-INA'l;:) ll-“’'''L; LAttOtL ' t Li/\i iiw•Iii)«> Or THE Co •-. KEtJ^ OFF DnAwVFIF'.i:(?»• • I* ir 4 9 irm> I 3 3 2 O a. ui(D o‘o /I %\ \ ' O'V - :v - -i V->,c(.ri« 00 t»e •?/. o /I t i \\*•\ *• a ?\itr VK<\\a IS i♦-OD $w *•Or-I n •6 ■i.•D \ o \ I \\• r; —v'm^^ * 1 ?«“ s5*/ ^ ‘ I -I' ! I' ^/ IlKKBm^ / } i * t i I. MKm-jNi I M I M is ■ \ V' w' / i< > ?\ '--W^ / ' 1 ? s J I 8 3 X' . V- > ^—»— rP!! Acs I !S 4 t 'i 2? AMk- >'J i /9 t \ \\ *■•*4 X V f:\ \\t I // *> 2< (7 &I * II i >t I: t as* it 58 - « 3 “ 3 sl M\ ? H I » . ''' \ s n i i M s I ■< < ! ?«3 U S 11l|; I I * I • ^ 3 ij 5 4U i ^ I H - , . • ' • t .fL^«