HomeMy WebLinkAbout1986-03-10 Lot & Soil Conditions Report«
j
«S-P TESTING, INC,
951 KATYDID LANE
ST. MICHAEL. MN 55376
487 3566
STEVE SHIRMERS
March 10, 1986
Ned Dayton
French Creek
Orono, NN
Lot 3^ Block 1
This site has been compacted from construction traffic from Lot 4, block
1. A mound system was proposed for this site. A soil boring was
completed in the proposed treatment area showing sandy soil after a
depth of 60 . If the upper soils to a depth of 60" is removed, a
standard system may be istalled. I feel that the original soil is
oo compacted to install a septic system.
Lot 1, Block 2 I FK*.'t CZ r? r K ^
A soil boring was completed west of the 970 contour (top of hill located
9 on tree line) finding soil to be typical of the boring in site 1.
Mottling is present at 60". A standard system may be used with the
trenches 24" deep or less. A pumping chamber will need to be installed
to. lift the effluent to the treatment area. I see no problem moving
the system to this site. •
Lot 8, Block 2
A soil boring was completed east of site #1, finding soils typical of
the previous soil test. Hotting is present at 18" to 20". Be sure
the sand below the rock bed (mound) is adequate to keep a 3' separation
from the mottled layer of soil, (seasonally high water table). I
see no problem moving the system to this site.
r
Steven B. Schirmers
♦
SBS/ds
t Soil mod Por€olmiion Te§t§
Soplir Syaieni Dotign
«,v .
4
-