HomeMy WebLinkAbout1989-03-27 Septic System ApprovalA //y^p CjoPf
CITY OF ORONO
SEPTIC SYSTEM APPROVAL
Permit #/-A?/
Fee $
Entered By
The General Contractor will be given a copy of this report and is
responsible for its distribution to all sub-contractors. Septic system
design is not considered as approved unless tWs sheet is attached.
LOCATION: j
GENERAL CONTRACTOR:
SEPTIC CONTRACTOR: h/V| I_ _ _ _
OWNER: *7^ !L ^
PHONE:
JEC approved
□ CONDITIONALLY APPROVED: Note Changes Below
COMMENTS://)no~/000- /000> f
<; ■^. 77ge<^cH-e-s P/pr^
Mie- DieoP ./y^ ry^^ucH fc.trP7~>/
/
-n^A^fc
notice to installers* Any changes to the approved plan and specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
NOTICE TO GENERAL CONTRACTORS: Drainfield sites must be protected prior to
and after system installation to avoid compaction of the natural soil.
Drainfield areas must be fenced off to eliminate all traffic over them.
•? >7-7-9^
1