HomeMy WebLinkAbout1305 Spruce Place - Point Of Sale Inspection - CompliantDate Called in
ENO Date Scheduled
City Of Orono
Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form
��kEf HOPE
Property Address: 1305 Spruce Place
PID: 0711723410051
Owner Information
Name:
Mailing Address:
(if different from
Property)
Phone:
Email:
Inspector Information
Name:
Jimmy Nelson
Company/ Organization
City of Orono
License number:
Phone:
952-249-4686
Email:
Inspection
System
Standard
Pass
Fail
Roof Drains
Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation
Foundation drains are underground pipes that collect storm water from
Drains
around the base of a building and into a sump basket, where it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps
Sump pumps are designed to capture surface or ground. water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service
Sanitary Sewer Inflow & Infiltration (I/1) Compliance Inspection Sanitary
Line
Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. Details on back of this sheet
Notes:
6/22/2026 Replaced pipe from house towards main: Clean out right outside of the house + 4' to
a 22 degree bend + 12' + 22 degree bend + 6' hooked into existing 4" sch 40 PVC. All pipe is 4"
sch 40 PVC that was replaced. 22' of 4" liner + T of liner at the 4x6 transition. Task #105994
Toilet Removed
o Yes o No
For Ins ection:
Inspectors Signature: Date:
Owners Signature: Date:
City Review
Compliant
❑ Corrective Action Required
Certificate of Compliance Expires: 6/22/2036
Corrective Action Due by:
Date: 6/23/2026
Signature:
Name: Heather Smieja