HomeMy WebLinkAbout1989-01-19 Septic System Approval0(2os>o CoPy
CITY OP ORONO
SEPTIC SYSTEM APPROVAL
Permit ff_ _ _ _
Pee S 75'g-
Entered By
The General Contractor will be given a copy of this report and la
responsible for its distribution to all sub-contractors. Septic system
design is not considered as approved unless this sheet is attached.
LOCATION:/2-OS~"
GENERAL CONTRACTOR:.
SEPTIC CONTRACTOR:PHONE:
OWNER: M **
□^APPROVED
CONDITIONALLY APPROVED: Note Changes Below
COMMENTS: S' ^
^07 5.4-. T-)t^cH€S &.t>xes ; "hock
•p^lgg /OOP - lO&O - /2-m Mfi
^ 5C--P T-<?s.rfAifA &r3/6/o C^aseU^ ^
— \>o AJOT Pig/AAAAV I»<e. At^TT s/rs-z
— tAio^j<- 00/rK OtAiAJer^gftinjrgAe^it Pe- ^o<-.4-becAc
LOC^O*^ t^JHfe’KV TA»Jk-S ,/
gfF€g7=^«ag-
ID(CM}l^/fy\ C>
NOTICE TO INSTALLERS: Any changes to the approved plan and specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
NOTICE TO GENERAL CONTRACTORS: Drainfield sites must be protected prior to
and after system installation to avoid compaction of the natural soil.
Drainfield areas must be fenced off to eliminate all traffic over them.
/-/y-8’<
Date Approved By