Loading...
HomeMy WebLinkAbout1989-01-19 Septic System Approval0(2os>o CoPy CITY OP ORONO SEPTIC SYSTEM APPROVAL Permit ff_ _ _ _ Pee S 75'g- Entered By The General Contractor will be given a copy of this report and la responsible for its distribution to all sub-contractors. Septic system design is not considered as approved unless this sheet is attached. LOCATION:/2-OS~" GENERAL CONTRACTOR:. SEPTIC CONTRACTOR:PHONE: OWNER: M ** □^APPROVED CONDITIONALLY APPROVED: Note Changes Below COMMENTS: S' ^ ^07 5.4-. T-)t^cH€S &.t>xes ; "hock •p^lgg /OOP - lO&O - /2-m Mfi ^ 5C--P T-<?s.rfAifA &r3/6/o C^aseU^ ^ — \>o AJOT Pig/AAAAV I»<e. At^TT s/rs-z — tAio^j<- 00/rK OtAiAJer^gftinjrgAe^it Pe- ^o<-.4-becAc LOC^O*^ t^JHfe’KV TA»Jk-S ,/ gfF€g7=^«ag- ID(CM}l^/fy\ C> NOTICE TO INSTALLERS: Any changes to the approved plan and specs must have prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. NOTICE TO GENERAL CONTRACTORS: Drainfield sites must be protected prior to and after system installation to avoid compaction of the natural soil. Drainfield areas must be fenced off to eliminate all traffic over them. /-/y-8’< Date Approved By