HomeMy WebLinkAboutSchimnowski Engineering2
November 18, 2022
Josh Prust
Valdes Lawn Care & Snow Removal
Submitted by email: jpeterson@valdeslawn.com
RE: Timber Retaining Wall Upper Tier
Project Location: 2815 Casco Point Road, Wayzata, Minnesota
Project No. 22-6589
Dear Mr. Prust:
This letter includes important details regarding the completion of planned work at the above location.
These recommendations are based on my original design dated August 24, 2022, and my site
observations and discussion with you on October 31 and November 17, 2022.
This previously designed work is recommended to be completed at this time to improve the site grading
by reducing the steepness of some slopes and will reduce the chances of erosion at the top of the newly
built, tiered timber retaining wall system.
I recommend that the final, planned timber retaining wall be constructed 4 to 6 feet behind the uppermost
existing wall. The wall should extend from several feet inside both the east and west property lines. Most
of the wall will have a maximum exposed height of about 2-feet. The wall height will increase to about 4-
feet tall near each end where existing slopes increase.
Following completion of the final wall, erosion control should be established and maintained in all
disturbed areas. Areas of concentrated runoff should be directed away from the top of the walls.
As before, the attached typical section should be referenced for construction details. Special note should
be made of the wall embedment depth and the tieback/header and deadmen lengths. Refer to local
building codes, industry specifications, and American Wood Preservers Association for installation
information and details.
The design of the wall system assumes the following:
Wall location: 4 to 6 feet behind the top of the existing upper wall
Wall height(s): 4-feet to 2-feet as noted (maximum exposed heights)
Minimum embedment depth = 6” min., or as noted
Soil conditions: Silty/Clayey Sand, friction angle = 30.0 degrees, unit weight of 125.0 lb/ft3
Required minimum soil bearing capacity = 1500 psf
Surcharge load at top of wall: None
5:1 maximum slope at top and bottom of wall
Wall Type: 6”x5” Treated Timber
Connections: 3/8” galvanized or treated spikes
Drainage pipe: Required
As we discussed, you are planning to that the as-built conditions surveyed for city consideration. Please
forward this to me when it is completed.
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 2
These walls have not been designed for ground water surcharge loads. Direct all surface and
groundwater drainage away from the walls. Methods to do so include but are not limited to the following:
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 3
drainage swale, site grading, retention ponds, etc. Details of water control are left to the wall contractor or
the site civil engineer. Please contact Criterium-Schimnowski to provide additional site assessment
services if desired.
The wall design was performed using the design guidelines presented in timber retaining wall industry
guidelines and recommendations. Additional information requested by Criterium-Schimnowski Engineers
but not available includes: geotechnical site survey and soil data. If soil conditions, proposed wall layouts,
or other design parameters vary from that assumed, a revised analysis may be needed. Please call me if
you have any questions or need more information.
This design has been prepared in strict confidence with you as our client. Reliance upon our design by
other parties is strictly prohibited. If you choose to share our design, you agree to indemnify, defend and
hold harmless the Engineer from any third-party action. No reproduction or re-use is permitted without
express written consent. Further, we will not release this design to anyone without your permission.
Thank you.
Sincerely,
Paul Schimnowski, P.E.
MN #40126
I hereby certify that this plan, specification, or report was prepared
by me or under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of Minnesota.
Paul Schimnowski, P.E.
Date: November 18, 2022 License #: 40126 (MN)
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 4
Retaining Wall Completion Reports and
Construction Inspections
To: Retaining wall contractors and/or all clients utilizing our services for retaining wall engineering.
From: Paul Schimnowski, PE
Retaining Wall Engineer
Criterium‐Schimnowski Engineers (CSE)
Paul@CriteriumMN.com
Date: April 1, 2022
To help contractors and other interested parties navigate the changes that many cities and jurisdictions
are making regarding construction inspection requirements and final approval letters, we are making
the following recommendations:
1. Request that the City Building Official complete the Required Inspections of Retaining Walls
form, attached.
2. Notify your client of the potential for added cost depending on city/building official
requirements. Contact our office or refer to our service agreement for current fees.
3. Contact Criterium‐Schimnowski Engineers to schedule any required inspections. Adequate lead
time is required. Similar to typical City inspections, at least one week is recommended. We
cannot guarantee immediate service.
4. Take daily construction progress photos for your records and for submittal to Criterium‐
Schimnowski Engineers upon request.
5. Complete the Statement of Conformance for your records and for submittal to Criterium‐
Schimnowski Engineers upon request. Form attached.
If a Wall Completion Report (Post‐built Conformance Letter), is requested of CSE, we will require that
you provide construction photos and Statement of Conformance. In addition, CSE will need to perform
a site visit once final grading is completed. Without these three items, we are unable to comment on
the construction/conformance of the wall.
We are here to help as much as possible. These inspection requirements are not coming from us.
Contact us if you have any questions.
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 5
Statement of Conformance
(for Retaining Wall Contractor)
Project Name/Address: _____________________________________
_____________________________________
_____________________________________
Form to be submitted with all construction progress photos by the retaining wall contractor at time of
wall completion. This form is required in order to request a wall completion letter from CSE:
_____ Wall type: _____________________________________________________________________
_____ Reinforcement type: _____________________________________________________________
_____ Description of site soils (i.e. sand, clay, loam): _________________________________________
_____ Leveling pad size and type of material: _______________________________________________
_____ Embedment depth (courses of block buried): _________________________________________
_____ Draintile type and diameter: _______________________________________________________
_____ Drainage aggregate type and layer thickness: _________________________________________
_____ Geogrid lengths and elevations: ____________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Compaction methods used: _______________________________________________________
I hereby certify that, to the best of my knowledge, the work is in conformance with the approved plans
and specifications, manufacturer recommendations and requirements, and/or the applicable
workmanship provisions of the code.
______________________________________________ Date ____________________________
Signature of Person in Responsible Charge
_____________________________________________________________________________________
Printed Name/Title/Company
Submit completed form to: Melissa@CriteriumMN.com
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 6
Required Inspections of Retaining Walls
(for City Building Official)
Project Name/Address: _____________________________________
_____________________________________
Permit Number: _____________________________________
Please choose one of the following:
_____ 1. No inspections are required.
_____ 2. The city will perform all needed inspections.
_____ 3. The retaining wall engineer‐of‐record must complete the following:
_____ Final site visit with wall completion letter. Contractor’s Statement of
Conformance is accepted in lieu of periodic site visits during construction.
_____ Periodic site visits with a wall completion letter that includes documentation of
the engineer’s construction observations.
Number of inspections required by building official: ________________
______________________________________________
Signature of Building Official or Authorizing Personnel
_____________________________________________________________________________________
Printed Name/Phone Number
________________________________
Date
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 7
DESIGN PROVISIONS:
1. REFER TO WOOD RETAINING WALL INDUSTRY GUIDELINES.
2. SEE PRODUCT MANUFACTURER INSTALLATION RECOMMENDATIONS FOR CONSTRUCTION SEQUENCE
AND INSTALLATION NOTES.
3. THE DESIGN OF THIS RETAINING WALL SYSTEM WAS BASED UPON THE EFFECTIVE STRENGTH
PARAMETERS SHOWN ON THE “SOIL VALUES” TABLE. UNLESS OTHEWISE NOTED, NO FORMAL SOIL
INFORMATION WAS PROVIDED BY THE OWNER OR OWNER’S REPRESENTATIVE. IF SOIL CONDITIONS
VARY AT TIME OF CONSTRUCTION, WALL ENGINEER MUST BE CONTACTED TO DETERMINE IF A REVISED
DESIGN IS NEEDED.
4. THE WALL DESIGN WAS BASED ON THE INFORMATION NOTED IN THE LETTER ABOVE.
5. REFER TO WALL CALCULATIONS FOR BEARING CAPACITY REQUIREMENTS.
6. NO PRODUCT/MATERIAL SUBSTITUTIONS WILL BE ALLOWED WITHOUT PRIOR WRITTEN PERMISSION OF
CRITERIUM‐SCHIMNOWSKI ENGINEERS.
7. FINAL SITE GRADES AND ROOF DRAINS SHALL DIRECT RUNOFF AWAY FROM ANY RETAINING WALL(S).
UNLESS OTHERWISE NOTED, THE WALL(S) HAS NOT BEEN DESIGNED FOR HYDROSTATIC SURCHARGE
LOADING.
8. THE WALL DESIGN WAS PERFORMED USING DESIGN GUIDELINES PRESENTED IN THE THIRD EDITION OF
THE "DESIGN MANUAL FOR SEGMENTAL RETAINING WALLS" PUBLISHED BY NCMA.
DESIGN LIMITATIONS:
1. THE INFORMATION PROVIDED WITHIN THESE DOCUMENTS IS FOR THE STRUCTURAL DESIGN OF THE
PROPOSED RETAINING WALL(S) ONLY. THE REQUIREMENTS FOR AND/OR WORK RELATED TO
HANDRAILS, GUARDRAILS, OR OTHER LIFE/SAFETY ISSUES ARE EXCLUDED FROM THESE DOCUMENTS
AND ARE TO BE PROVIDED BY OTHERS.
2. SITE LAYOUT AND GRADING DESIGN ARE NOT INCLUDED IN WALL DESIGN SERVICES. THOSE SERVICE
ARE THE RESPONSIBILITY OF THE SITE CIVIL ENGINEER.
3. INTERNAL COMPOUND STABILITY (ICS) HAS BEEN CALCULATED FOR THIS PROJECT BY CRITERIUM.
HOWEVER, ICS IS NOT A SUBSTITUTE FOR A GLOBAL STABILITY ANALYSIS WHICH SHOULD BE
PERFORMED BY A QUALIFIED GEOTECHNICAL ENGINEER. ADDITIONAL SUBSURFACE EXPLORATION MAY
BE REQUIRED.
SUGGESTED QUALITY ASSURANCE REQUIREMENTS:
1. A QUALIFIED ENGINEER OR TECHNICIAN SHALL SUPERVISE THE WALL CONSTRUCTION TO VERIFY SITE
SOIL CONDITIONS. IF THE PROJECT GEOTECHNICAL ENGINEER DOES NOT PERFORM THIS WORK, A
QUALIFIED GEOTECHNICAL ENGINEER/TECHNICIAN SHALL BE HIRED TO ASSURE THE RETAINING WALL IS
CONSTRUCTED WITH PROPER SOIL PARAMETERS.
2. A QUALIFIED GEOTECHNICAL ENGINEER SHALL BE CONSULTED TO VERIFY THE SUITABILITY OF DESIGN
ASSUMPTIONS MADE BY CRITERIUM.
3. WALL EXCAVATION AND SOILS SHALL BE INSPECTED FOR GROUNDWATER CONDITIONS. THE
GEOTECHNICAL ENGINEER SHALL DETERMINE ADDITIONAL DRAINAGE PROVISIONS TO BE
INCORORATED INTO THE WALL DESIGN.
4. THE WALL DESIGN ENGINEER SHALL BE HIRED TO PERFORM A PRE‐CONSTRUCTION SITE VISIT.
5. THE WALL DESIGN ENGINEER CAN BE HIRED FOR CONSTRUCTION OBSERVATION SERVICES.
6. THE WALL CONTRACTOR IS RESPONSIBLE FOR MAINTAINING QUALITY CONTROL FOR THE
CONSTRUCTION OF THE WALL IN ACCORDANCE WITH CONTRACT REQUIREMENTS.
7. SEE PROJECT CONTRACT DOCUMENTS FOR SPECIFIC DETAILS ON THE SCOPE OF WORK THAT WILL BE
PROVIDED BY ALL PARTIES.
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 8
T E R M S A N D C O N D I T I O N S - Effective Nov.10.2020
This design is expressly made subject to the following terms and conditions to which all persons that receive and rely
thereon agree:
1. STANDARD OF SERVICE: Services performed by ENGINEER under this agreement shall be performed in a manner
consistent with the skill and care ordinarily used by members of the engineering profession practicing under similar
conditions at the time and in the locality the services are performed.
CLIENT recognizes that interpretations and recommendations of ENGINEER are based solely on the information
available to the company.
ENGINEER will be responsible for those interpretations and recommendations, but shall not be responsible for the
interpretation by others of the information developed.
Services provided reflect the professional judgment of ENGINEER, to the best of ENGINEER's knowledge,
information, and belief as of the date hereof.
No other warranty or guarantee, express or implied, is made.
2. SCOPE OF SERVICE: Services performed by ENGINEER are expressly limited by the scope of services ENGINEER
has been employed by CLIENT to perform.
3. TERMS OF PAYMENT: ENGINEER may require a retainer fee to be paid before commencing any project. Extended
engagements may require interim invoicing on a weekly, monthly, or other basis. At the completion of the project, we
will issue a final invoice. Payment of each invoice is due upon presentation. Failure to pay invoices within the allotted
time period will constitute a breach of contract and may result in suspension of work until such time as all overdue
payments are made in full. Should any suspension occur because of overdue payments, the time for contract
completion, if any is stated, shall be extended by the period of the suspension. Invoiced balances remaining unpaid for
thirty (30) days after the date of invoice may be charged a finance charge in the amount of ½ percent per month from
the date of invoice. If an invoice remains unpaid and it becomes necessary, in the ENGINEERS’ opinion to initiate
collection procedures, the CLIENT hereby agrees to pay all collection costs including, but not limited to, reasonable
fees for attorneys retained by ENGINEER and court costs at our standard billing rate for time necessitated in court
appearances or presentation of claim to the appropriate court jurisdiction. Exceptions to payment terms must be
specified in writing.
4. OWNERSHIP OF DOCUMENTS: All reports, field data, field notes, calculations, estimates and other documents
(‘reports’) prepared by Engineer, as instruments of service, shall remain the property of Engineer. CLIENT agrees that
all reports furnished to CLIENT or his agents, which are not paid for, will be returned upon demand and will not be used
by CLIENT for any purpose whatever. ENGINEER will retain all pertinent records relating to the services performed for
a period of five years following submission of the report, during which period the records will be made available to
CLIENT at all reasonable times.
5. COPIES OF DOCUMENTS: ENGINEER agrees to furnish CLIENT with an electronic copy of our report, drawings, or
documents relating to the services performed. Hard copies, bound or unbound, may be provided upon request at
charge of cost plus 10 percent, at ENGINEERS’s sole discretion. ENGINEER shall retain an electronic copy of the final
documents in its files for a period of five years.
6. INSURANCE: ENGINEER represents and warrants that it is protected by Workers Compensation insurance and has
such coverage under Public Liability and Property Damage insurance policies which ENGINEER deems adequate.
Certificate for all such policies of insurance shall be provided to the CLIENT upon request in writing. ENGINEER shall
not be responsible for any loss, damage or liability arising from any acts by CLIENT, its agents, staff and other
consultants employed by it.
7. TERMINATION: This agreement may be terminated by either party by written notice. In the event of termination,
ENGINEER shall be paid for services performed and expenses incurred up to the termination notice date. Neither
CLIENT not ENGINEER may delegate, assign, sublet or transfer his/her duties or interest in this Agreement without the
written consent of the other party.
8. LIMITATION OF LIABILITY: To the fullest extent permitted by law, CLIENT and ENGINEER
(a) waive against each other, and the other's employees, officers, directors, agents, insurers, partners, and
consultants, any and all claims for or entitlement to special, incidental, indirect, or consequential damages
arising out of, resulting from, or in any way related to this report,
(b) agree that ENGINEER’s total liability to CLIENT shall be limited to the total amount of compensation received
by ENGINEER,
(c) agree that CLIENT will defend, indemnify, and hold harmless ENGINEER from and against any claims,
liabilities, actions, demands, losses, damages, costs and expenses sustained by any third-party not granted
reliance on ENGINEER’s reports and services,
(d) agree that any action arising out of or related to the services provided must be brought to ENGINEER’S
attention no later than two (2) years after the date of the services, and
(e) if an action is brought against the ENGINEER and the ENGINEER prevails, ENGINEER shall be entitled to
recover costs and expenses, including reasonable attorneys' fees and costs.
9. FORCE MAJEURE: The engineer shall not be responsible or liable for any failure or delay in the performance of its
obligations under this contract arising out of or resulting from any cause or event beyond our control, such as war,
strike, crime, epidemic/pandemic, regulations and/or restriction imposed by any government agency, or other event.
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 4
Retaining Wall Completion Reports and
Construction Inspections
To: Retaining wall contractors and/or all clients utilizing our services for retaining wall engineering.
From: Paul Schimnowski, PE
Retaining Wall Engineer
Criterium‐Schimnowski Engineers (CSE)
Paul@CriteriumMN.com
Date: April 1, 2022
To help contractors and other interested parties navigate the changes that many cities and jurisdictions
are making regarding construction inspection requirements and final approval letters, we are making
the following recommendations:
1. Request that the City Building Official complete the Required Inspections of Retaining Walls
form, attached.
2. Notify your client of the potential for added cost depending on city/building official
requirements. Contact our office or refer to our service agreement for current fees.
3. Contact Criterium‐Schimnowski Engineers to schedule any required inspections. Adequate lead
time is required. Similar to typical City inspections, at least one week is recommended. We
cannot guarantee immediate service.
4. Take daily construction progress photos for your records and for submittal to Criterium‐
Schimnowski Engineers upon request.
5. Complete the Statement of Conformance for your records and for submittal to Criterium‐
Schimnowski Engineers upon request. Form attached.
If a Wall Completion Report (Post‐built Conformance Letter), is requested of CSE, we will require that
you provide construction photos and Statement of Conformance. In addition, CSE will need to perform
a site visit once final grading is completed. Without these three items, we are unable to comment on
the construction/conformance of the wall.
We are here to help as much as possible. These inspection requirements are not coming from us.
Contact us if you have any questions.
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 5
Statement of Conformance
(for Retaining Wall Contractor)
Project Name/Address: _____________________________________
_____________________________________
_____________________________________
Form to be submitted with all construction progress photos by the retaining wall contractor at time of
wall completion. This form is required in order to request a wall completion letter from CSE:
_____ Wall type: _____________________________________________________________________
_____ Reinforcement type: _____________________________________________________________
_____ Description of site soils (i.e. sand, clay, loam): _________________________________________
_____ Leveling pad size and type of material: _______________________________________________
_____ Embedment depth (courses of block buried): _________________________________________
_____ Draintile type and diameter: _______________________________________________________
_____ Drainage aggregate type and layer thickness: _________________________________________
_____ Geogrid lengths and elevations: ____________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Compaction methods used: _______________________________________________________
I hereby certify that, to the best of my knowledge, the work is in conformance with the approved plans
and specifications, manufacturer recommendations and requirements, and/or the applicable
workmanship provisions of the code.
______________________________________________ Date ____________________________
Signature of Person in Responsible Charge
_____________________________________________________________________________________
Printed Name/Title/Company
Submit completed form to: Melissa@CriteriumMN.com
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 6
Required Inspections of Retaining Walls
(for City Building Official)
Project Name/Address: _____________________________________
_____________________________________
Permit Number: _____________________________________
Please choose one of the following:
_____ 1. No inspections are required.
_____ 2. The city will perform all needed inspections.
_____ 3. The retaining wall engineer‐of‐record must complete the following:
_____ Final site visit with wall completion letter. Contractor’s Statement of
Conformance is accepted in lieu of periodic site visits during construction.
_____ Periodic site visits with a wall completion letter that includes documentation of
the engineer’s construction observations.
Number of inspections required by building official: ________________
______________________________________________
Signature of Building Official or Authorizing Personnel
_____________________________________________________________________________________
Printed Name/Phone Number
________________________________
Date
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 7
DESIGN PROVISIONS:
1. REFER TO WOOD RETAINING WALL INDUSTRY GUIDELINES.
2. SEE PRODUCT MANUFACTURER INSTALLATION RECOMMENDATIONS FOR CONSTRUCTION SEQUENCE
AND INSTALLATION NOTES.
3. THE DESIGN OF THIS RETAINING WALL SYSTEM WAS BASED UPON THE EFFECTIVE STRENGTH
PARAMETERS SHOWN ON THE “SOIL VALUES” TABLE. UNLESS OTHEWISE NOTED, NO FORMAL SOIL
INFORMATION WAS PROVIDED BY THE OWNER OR OWNER’S REPRESENTATIVE. IF SOIL CONDITIONS
VARY AT TIME OF CONSTRUCTION, WALL ENGINEER MUST BE CONTACTED TO DETERMINE IF A REVISED
DESIGN IS NEEDED.
4. THE WALL DESIGN WAS BASED ON THE INFORMATION NOTED IN THE LETTER ABOVE.
5. REFER TO WALL CALCULATIONS FOR BEARING CAPACITY REQUIREMENTS.
6. NO PRODUCT/MATERIAL SUBSTITUTIONS WILL BE ALLOWED WITHOUT PRIOR WRITTEN PERMISSION OF
CRITERIUM‐SCHIMNOWSKI ENGINEERS.
7. FINAL SITE GRADES AND ROOF DRAINS SHALL DIRECT RUNOFF AWAY FROM ANY RETAINING WALL(S).
UNLESS OTHERWISE NOTED, THE WALL(S) HAS NOT BEEN DESIGNED FOR HYDROSTATIC SURCHARGE
LOADING.
8. THE WALL DESIGN WAS PERFORMED USING DESIGN GUIDELINES PRESENTED IN THE THIRD EDITION OF
THE "DESIGN MANUAL FOR SEGMENTAL RETAINING WALLS" PUBLISHED BY NCMA.
DESIGN LIMITATIONS:
1. THE INFORMATION PROVIDED WITHIN THESE DOCUMENTS IS FOR THE STRUCTURAL DESIGN OF THE
PROPOSED RETAINING WALL(S) ONLY. THE REQUIREMENTS FOR AND/OR WORK RELATED TO
HANDRAILS, GUARDRAILS, OR OTHER LIFE/SAFETY ISSUES ARE EXCLUDED FROM THESE DOCUMENTS
AND ARE TO BE PROVIDED BY OTHERS.
2. SITE LAYOUT AND GRADING DESIGN ARE NOT INCLUDED IN WALL DESIGN SERVICES. THOSE SERVICE
ARE THE RESPONSIBILITY OF THE SITE CIVIL ENGINEER.
3. INTERNAL COMPOUND STABILITY (ICS) HAS BEEN CALCULATED FOR THIS PROJECT BY CRITERIUM.
HOWEVER, ICS IS NOT A SUBSTITUTE FOR A GLOBAL STABILITY ANALYSIS WHICH SHOULD BE
PERFORMED BY A QUALIFIED GEOTECHNICAL ENGINEER. ADDITIONAL SUBSURFACE EXPLORATION MAY
BE REQUIRED.
SUGGESTED QUALITY ASSURANCE REQUIREMENTS:
1. A QUALIFIED ENGINEER OR TECHNICIAN SHALL SUPERVISE THE WALL CONSTRUCTION TO VERIFY SITE
SOIL CONDITIONS. IF THE PROJECT GEOTECHNICAL ENGINEER DOES NOT PERFORM THIS WORK, A
QUALIFIED GEOTECHNICAL ENGINEER/TECHNICIAN SHALL BE HIRED TO ASSURE THE RETAINING WALL IS
CONSTRUCTED WITH PROPER SOIL PARAMETERS.
2. A QUALIFIED GEOTECHNICAL ENGINEER SHALL BE CONSULTED TO VERIFY THE SUITABILITY OF DESIGN
ASSUMPTIONS MADE BY CRITERIUM.
3. WALL EXCAVATION AND SOILS SHALL BE INSPECTED FOR GROUNDWATER CONDITIONS. THE
GEOTECHNICAL ENGINEER SHALL DETERMINE ADDITIONAL DRAINAGE PROVISIONS TO BE
INCORORATED INTO THE WALL DESIGN.
4. THE WALL DESIGN ENGINEER SHALL BE HIRED TO PERFORM A PRE‐CONSTRUCTION SITE VISIT.
5. THE WALL DESIGN ENGINEER CAN BE HIRED FOR CONSTRUCTION OBSERVATION SERVICES.
6. THE WALL CONTRACTOR IS RESPONSIBLE FOR MAINTAINING QUALITY CONTROL FOR THE
CONSTRUCTION OF THE WALL IN ACCORDANCE WITH CONTRACT REQUIREMENTS.
7. SEE PROJECT CONTRACT DOCUMENTS FOR SPECIFIC DETAILS ON THE SCOPE OF WORK THAT WILL BE
PROVIDED BY ALL PARTIES.
2815 Casco Point Road, Wayzata, Minnesota
November 18, 2022
Page | 8
T E R M S A N D C O N D I T I O N S - Effective Nov.10.2020
This design is expressly made subject to the following terms and conditions to which all persons that receive and rely
thereon agree:
1. STANDARD OF SERVICE: Services performed by ENGINEER under this agreement shall be performed in a manner
consistent with the skill and care ordinarily used by members of the engineering profession practicing under similar
conditions at the time and in the locality the services are performed.
CLIENT recognizes that interpretations and recommendations of ENGINEER are based solely on the information
available to the company.
ENGINEER will be responsible for those interpretations and recommendations, but shall not be responsible for the
interpretation by others of the information developed.
Services provided reflect the professional judgment of ENGINEER, to the best of ENGINEER's knowledge,
information, and belief as of the date hereof.
No other warranty or guarantee, express or implied, is made.
2. SCOPE OF SERVICE: Services performed by ENGINEER are expressly limited by the scope of services ENGINEER
has been employed by CLIENT to perform.
3. TERMS OF PAYMENT: ENGINEER may require a retainer fee to be paid before commencing any project. Extended
engagements may require interim invoicing on a weekly, monthly, or other basis. At the completion of the project, we
will issue a final invoice. Payment of each invoice is due upon presentation. Failure to pay invoices within the allotted
time period will constitute a breach of contract and may result in suspension of work until such time as all overdue
payments are made in full. Should any suspension occur because of overdue payments, the time for contract
completion, if any is stated, shall be extended by the period of the suspension. Invoiced balances remaining unpaid for
thirty (30) days after the date of invoice may be charged a finance charge in the amount of ½ percent per month from
the date of invoice. If an invoice remains unpaid and it becomes necessary, in the ENGINEERS’ opinion to initiate
collection procedures, the CLIENT hereby agrees to pay all collection costs including, but not limited to, reasonable
fees for attorneys retained by ENGINEER and court costs at our standard billing rate for time necessitated in court
appearances or presentation of claim to the appropriate court jurisdiction. Exceptions to payment terms must be
specified in writing.
4. OWNERSHIP OF DOCUMENTS: All reports, field data, field notes, calculations, estimates and other documents
(‘reports’) prepared by Engineer, as instruments of service, shall remain the property of Engineer. CLIENT agrees that
all reports furnished to CLIENT or his agents, which are not paid for, will be returned upon demand and will not be used
by CLIENT for any purpose whatever. ENGINEER will retain all pertinent records relating to the services performed for
a period of five years following submission of the report, during which period the records will be made available to
CLIENT at all reasonable times.
5. COPIES OF DOCUMENTS: ENGINEER agrees to furnish CLIENT with an electronic copy of our report, drawings, or
documents relating to the services performed. Hard copies, bound or unbound, may be provided upon request at
charge of cost plus 10 percent, at ENGINEERS’s sole discretion. ENGINEER shall retain an electronic copy of the final
documents in its files for a period of five years.
6. INSURANCE: ENGINEER represents and warrants that it is protected by Workers Compensation insurance and has
such coverage under Public Liability and Property Damage insurance policies which ENGINEER deems adequate.
Certificate for all such policies of insurance shall be provided to the CLIENT upon request in writing. ENGINEER shall
not be responsible for any loss, damage or liability arising from any acts by CLIENT, its agents, staff and other
consultants employed by it.
7. TERMINATION: This agreement may be terminated by either party by written notice. In the event of termination,
ENGINEER shall be paid for services performed and expenses incurred up to the termination notice date. Neither
CLIENT not ENGINEER may delegate, assign, sublet or transfer his/her duties or interest in this Agreement without the
written consent of the other party.
8. LIMITATION OF LIABILITY: To the fullest extent permitted by law, CLIENT and ENGINEER
(a) waive against each other, and the other's employees, officers, directors, agents, insurers, partners, and
consultants, any and all claims for or entitlement to special, incidental, indirect, or consequential damages
arising out of, resulting from, or in any way related to this report,
(b) agree that ENGINEER’s total liability to CLIENT shall be limited to the total amount of compensation received
by ENGINEER,
(c) agree that CLIENT will defend, indemnify, and hold harmless ENGINEER from and against any claims,
liabilities, actions, demands, losses, damages, costs and expenses sustained by any third-party not granted
reliance on ENGINEER’s reports and services,
(d) agree that any action arising out of or related to the services provided must be brought to ENGINEER’S
attention no later than two (2) years after the date of the services, and
(e) if an action is brought against the ENGINEER and the ENGINEER prevails, ENGINEER shall be entitled to
recover costs and expenses, including reasonable attorneys' fees and costs.
9. FORCE MAJEURE: The engineer shall not be responsible or liable for any failure or delay in the performance of its
obligations under this contract arising out of or resulting from any cause or event beyond our control, such as war,
strike, crime, epidemic/pandemic, regulations and/or restriction imposed by any government agency, or other event.