Loading...
HomeMy WebLinkAbout200 Big Island - Building Plans: ResidentialEAST ELEVATION - LAKE SIDE SCALE: 1/2" = 1'-0" SOUTH ELEVATION SCALE: 1/2" = 1'-0" WEST ELEVATION - REAR SCALE: 1/2" = 1'-0" NORTH ELEVATION SCALE: 1/2" = 1'-0" 200 Big Island - Orono, MN 200 Big Island - Orono, MN GENERAL NOTES: 1.All questions and clarifications must be directed to the General Contractor. 2.These drawings represent the design intent. Although these drawings have been drawn to scale, it is the General Contractor and Sub-Contractors responsibility to field verify any and all conditions that might affect their work and areas of construction. 3.All construction is to fully comply with all local codes, laws and city ordinances. The General Contractor is responsible to comply with such codes, laws, city ordinances and lawful orders of public officials. 4.The General Contractor and Sub-Contractors responsibility for verifying all related conditions and dimensions prior to the purchase and installation of any and all materials. 6. All materials are to be installed in accordance with the manufactures instructions. Any deviance must be approved by the homeowner. 7. All mechanical, electrical and plumbing work and requirements are the responsibility of the respective sub-contractor(s). 8.The homeowner will provide basic home owners insurance to cover loss from building material theft, fire and wind storm damage. The General Contractor and Sub-Contractors will provide Workers Compensation and Liability Insurance per the laws of the state of Minnesota. 9.The General Contractor will secure and pay for the general building permit. Each sub-contractor shall secure and pay for all other permits, fees, inspections necessary for the completion of their work. 10.If a change of work is desired by the homeowner, the General Contractor will be provided written notification in the form of drawings or otherwise, of the change. The General Contractor shall submit in writing a firm proposal for any changes in cost and time resulting from the change. The agreement to proceed with the change in work is to be signed by both parties prior to commencement of the change. 11.All materials used in the construction are to be new, delivered to the job site in their original, unopened containers or wrapping with labels intact. 12.Each sub-contractor is responsible for helping to keep the construction site reasonably free of debris during construction. All related debris shall be picked up and removed prior to completion of such related work. SHEET INDEX: 1 - COVER SHEET 2 - SITE PLAN 3 - ELEVATION, EAST (LAKE SIDE) 4 - ELEVATION, WEST (REAR) 5 - ELEVATION, NORTH 6 - ELEVATION, SOUTH 7 - FLOOR PLAN, LOWER LEVEL 8 - FLOOR PLAN, MAIN LEVEL 9 - FLOOR PLAN, UPPER LOFT AREA 10 - FRAMING PLAN, EAST ELEVATION 11 - FRAMING PLAN, WEST ELEVATION 12 - FRAMING PLAN, NORTH ELEVATION 13 - FRAMING PLAN, SOUTH ELEVATION 14 - WALL SECTION 15 - ELECTRICAL, LOWER LEVEL 16 - ELECTRICAL, MAIN LEVEL 17 - ELECTRICAL, UPPER LEVEL ( LOFT) PROJECT GENERAL SCOPE: 1 - NEW LAKE HOME BUILD 2 - LANDSCAPE SURROUNDING AREA GENERAL CONTRACTOR: VILLAMIL CONSTRUCTION IAN VILLAMIL - 612.221.7511 ianvillamil@villamilconstruction.com 1 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T CO V E R P A G E NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 Reviewed for Code Compliance Nicole Post RPS24-000077 7-3-24 Approved plans must be on site for the duration of the project. Plans must be available to inspector. Please call 952-249-6000 to schedule all inspections. Have permit number and address when calling. Homeowner should check with septic professional to ensure project does not affect the absorption area. Please plan accordingly. The City will not issue a Temporary Certificate of Occupancy (Temp CO) for new homes during the growing season from May 1st to November 1st. Issuance of a Certificate of Occupancy requires all permits associated with the project to be finaled and an as-built survey approved by the City. If vegetation is not fully established at the time of CO issuance, the erosion control escrow will continue to be held. Separate Permits Required Plumbing Mechanical Electrical Septic EAST ELEVATION - LAKE SIDE SCALE: 1/2" = 1'-0" 3 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T EL E V A T I O N - E A S T ( L A K E S I D E ) NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 5'-0" Truss specs will be on site WEST ELEVATION - REAR SCALE: 1/2" = 1'-0" 4 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T EL E V A T I O N - W E S T ( R E A R ) NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 SOUTH ELEVATION SCALE: 1/2" = 1'-0" 5 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T EL E V A T I O N - N O R T H NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 NORTH ELEVATION SCALE: 1/2" = 1'-0" 6 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T EL E V A T I O N - S O U T H NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 Handrail ends shall be returned or shall terminate in newel posts or safety terminals per MRCR311.7.8.4 Handrail required with 4 or more risers 34"-38" UDH-G2 2420-3WUSFDR 12070 UD H - G 2 2 4 2 0 UC A 3 0 4 8 - L R UC A 3 0 4 8 - L R 26 7 0 50 7 0 3070 SOUTH ELEVATION EAST ELEVATION (LAKE SIDE) UDH-G2 2432-2UDH-G2 2432-2 NORTH ELEVATION WEST ELEVATION (REAR) 2670 26 7 0 UC A 3 0 4 8 - L H UTILITY ROOM BATHROOM #3 BATHROOM #2 OFFICE/DEN BATHROOM #3 LOWER LEVEL - 1428 SQ/FT SCALE: 1/2" = 1'-0" 4'-7 13/16"9'-0 3/4"9'-0 3/4"11'-2 11/16"8' 27'15' 42' 3' - 1 0 " 23 ' - 6 1 / 4 " 10 ' - 5 3 / 4 " 34 ' 7'-8 7/8"10'-3 1/2"8'-11 5/8"15' 42' 12 ' - 2 3 / 4 " 10 ' - 4 1 / 4 " 11 ' - 5 " 5' - 5 " 9' - 7 " 10 ' - 0 1 / 2 " 8' - 1 1 1 / 2 " 10'-5 1/4" 9' - 1 1 / 2 " 6'-5 5/32" 10'8'-8 1/8" 5'-7" EXTERIOR DIMENSION NOTE: ALL DIMENSIONS ARE INDEXED FROM THE OUTSIDE FACE OF THE FOUNDATION. FRAMING PLACEMENT IS FLUSH WITH THE OUTSIDE EDGE OF THE FOUNDATION. CM U B L O C K E N E R G Y W A L L 2x10 BALLOON FRAMED WALL CMU BLOCK ENERGY WALL 2x 6 W A L L CM U B L O C K E N E R G Y W A L L 2x10 BALLOON FRAMED WALL 2x6 WALL 2x6 WALL 7 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T FL O O R P L A N - L O W E R L E V E L NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 See Engineering Under Stair Protection Enclosed space under stairs that is accessed by a door or access panel shall have walls, under-stair surface and any soffits protected on the enclosed side with 1/2" gypsum board Unprotected portions of floor shall not exceed 80 Sq Ft.Mechanical Ventilation Required Showerhead shall not discharge directly at the entrance to the compartment so the bather can adjust the valves before stepping into the shower spray. Door location should be changed. UD H - G 2 2 4 2 0 - 2 W UDH-G2 2420 UAWN3020-2W UD H G 2 2 4 3 2 30 7 0 USFDR6070USFDR12070UDH-G2 2432 50 7 0 2870 26 7 0 2670 2668 24 7 0 EAST ELEVATION (LAKE SIDE) WEST ELEVATION (REAR) SOUTH ELEVATION UDH-G2 2432 UA W N 3 0 2 0 - 2 W UD H G 2 2 4 3 2 NORTH ELEVATION UD H - G 2 2 4 2 0 UD H - G 2 2 4 2 0 U P DOWN OPEN ABOVE LOFT ABOVE BEDROOM #1 BATHROOM #1 BATHROOM #2 MAIN LEVEL - 1428 SQ/FT SCALE: 1/2" = 1'-0" 5'-10 7/16"7'-10 1/8"7'-10 1/8"12'-8 13/16"7'-8 1/2" 15'27' 42' 4' - 6 " 9' - 3 " 7' - 1 1 3 / 4 " 8' - 5 1 / 4 " 3' - 1 0 " 34 ' 6'-1 3/16"15'-1 13/16"20'-9" 4' - 2 " 9' - 9 9 / 1 6 " 9' - 0 1 5 / 1 6 " 10 ' - 1 1 1 / 2 " 10 ' - 8 9 / 1 6 " 6' - 6 " 16 ' - 9 7 / 1 6 " 34 ' 3'-4 1/2" 5' - 8 3 / 3 2 " 10'-10 1/2" 6' - 6 " 11'-7 1/2"3'-4 1/2"7'-8 1/2"7'-9 1/4" 42' 11'-6 1/4" 2x 6 B A L L O O N F R A M E D W A L L 2x6 BALLOON FRAMED WALL OPEN ABOVE EXTERIOR DIMENSION NOTE: ALL DIMENSIONS ARE INDEXED FROM THE OUTSIDE FACE OF THE FOUNDATION. FRAMING PLACEMENT IS FLUSH WITH THE OUTSIDE EDGE OF THE FOUNDATION. 2x10 BALLOON FRAMED WALL 2x6 BALLOON FRAMED WALL 2x6 WALL2x6 BALLOON FRAMED WALL 2x6 WALL 2x 6 W A L L 2x 6 W A L L 2x10 BALLOON FRAMED WALL 2x6 WALL 2x6 WALL 2x 6 B A L L O O N F R A M E D W A L L 8 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T FL O O R P L A N - M A I N L E V E L NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 See Engineering Handrails shall be 34-38" in height and continuous for the full length of the flight. Handrails shall be returned or terminate in newel post. Mechanical Ventilation Required Per MNF&G 505.4 Hoods exhausting in excess of 400cfm must provide heated makeup air at a rate approx equal to exhaust air rate Energy Calcs show 300 cfm Hood Fall protection required UCA POLY TRAPEZOID / UAWN7224 UCAPOLY - TRAPEZOID U P U P OPEN BELOW LOFT UCAPOLY - TRAPEZOIDUCAPOLY - TRAPEZOID WEST ELEVATION SCALE: 3/4" = 1'-0" WEST ELEVATION (REAR) SOUTH ELEVATION EAST ELEVATION (LAKE SIDE) 36" FS 71" FS 36" FS 143" FS 56 " F S 92 " F S 12 7 1 / 2 " F S EAST ELEVATION SCALE: 3/4" = 1'-0" 72" FS 23 1 / 8 " F S 10 7 1 / 8 " F S 48 " F S UAWN3020 UPPER LEVEL (LOFT) - 362 SQ/FT SCALE: 1/2" = 1'-0" RAILING CENTER WINDOW IN WALL CENTER WINDOW IN WALL 2'-2 1/2" 27' 17 ' - 2 9 / 1 6 " 126.8750 2x6 BALLOON FRAMED WALL 2x6 WALL 2x 6 K N E E W A L L 2x 6 B A L L O O N F R A M E D W A L L 2x 6 B A L L O O N F R A M E D W A L L 2x10 BALLOON FRAMED WALL 9 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T FL O O R P L A N - U P P E R L E V E L ( L O F T ) NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 See Engineering Guards shall be located along open sides of floors, stairs, ramps and landings located more tahn 30" from floor or grade below. Guards shall not be less than 36" in height Attic access is required. Shall be not less than 22" x 30" and be located in an accessible location. 12 12 42'4" 9' - 2 1 / 2 " 2' 1 1 / 2 " 11 ' - 1 1 5 / 8 " 39 ' - 1 9 / 1 6 " EAST ELEVATION - LAKE SIDE TOP OF SLAB 0'-00" TOP OF FLOOR TRUSS 11' - 0" TOP OF DOUBLE TOP PLATE 20' - 1-1/8" TOP OF ROOF TRUSS 30' - 1-1/4" 11 ' 9' - 1 1 / 8 " 10 ' - 0 5 / 3 2 " 12 12 1 1 / 2 " STUD SPACING 16" ON CENTER 72 1 / 2 " R O 30 5/8" RO 144" RO 86 1 / 2 " R O 72 1 / 2 " R O 30 5/8" RO 144" RO 56 3 / 4 " R O 12 8 3 / 4 " R O 73 5/8" RO 86 1 / 2 " R O 88 3/4" RO 48 1 / 2 " R O 59 1/2" RO 72 1 / 2 " R O 144" RO 86 1 / 2 " R O 59 1/2" RO 72 1 / 2 " R O STUD SPACING 16" ON CENTER 2x6 WALL 10 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T FR A M I N G P L A N - E A S T E L E V A T I O N NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 12 12 4" 9' - 4 " 2' 1 1 / 2 " 8' - 1 1 5 / 8 " 39 ' - 1 9 / 1 6 " WEST ELEVATION - REAR TOP OF SLAB 0'-00" TOP OF FLOOR TRUSS 11' - 0" TOP OF DOUBLE TOP PLATE 20' - 1-1/8" TOP OF ROOF TRUSS 35' - 10-5/16" 11 ' 9' - 1 1 / 8 " 19 ' - 0 7 / 1 6 " 12 12 9' - 6 5 / 3 2 " CMU BLOCK WALL 42' 24" FLOOR TRUSS DESIGNED AND ENGINEERED BY TRUSS MANUFACTURE 24" FLOOR TRUSS DESIGNED AND ENGINEERED BY TRUSS MANUFACTURE STUD SPACING 16" ON CENTER 2x6 WALL 24" PARALLEL ROOF TRUSS DESIGNED AND ENGINEERED BY TRUSS MANUFACTURE 48 1 / 2 " R O 20 1 / 8 " R O 73" RO 59 1/2" RO 61" RO 71 7 / 8 " R O 10 8 3 / 8 " 20 1 / 8 " R O 31" RO 2x6 WALL 11 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T FR A M I N G P L A N - W E S T E L E V A T I O N NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 6 12 4 12 34'4" 9' 2' 1 1 / 2 " 8' - 8 5 / 8 " 30 ' - 1 1 / 4 " SOUTH ELEVATION TOP OF SLAB 0'-00" TOP OF FLOOR TRUSS 11' - 0" TOP OF DOUBLE TOP PLATE 20' - 1-1/8" TOP OF ROOF TRUSS 30' - 1-1/4" 11 ' 9' - 1 1 / 8 " 10 ' - 0 5 / 3 2 " BOTTOM OF SLAB - 0 '- 4" CMU BLOCK WALL ROOF TRUSS DESIGNED AND ENGINEERED BY TRUSS MANUFACTURE STUD SPACING 16" ON CENTER48 1 / 2 " R O 30 5/8" RO 48 1 / 2 " R O 30 5/8" RO 48 1 / 2 " R O 58 1/2" RO 48 1 / 8 " R O 61" RO 48 1 / 8 " R O 31" RO 48 1 / 8 " R O 61" RO 12 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T FR A M I N G P L A N - N O R T H E L E V A T I O N NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 NORTH ELEVATION 4" 9' 2' TOP OF SLAB 0'-00" TOP OF FLOOR TRUSS 11' - 0" TOP OF DOUBLE TOP PLATE 20' - 1-1/8" TOP OF ROOF TRUSS 34' - 1-3/4" 11 ' 9' - 1 1 / 8 " 19 ' - 1 3 / 1 6 " BOTTOM OF SLAB - 0 '- 4" CMU BLOCK WALL 39 ' - 2 5 / 1 6 " 34' STUD SPACING 16" ON CENTER 2x10 WALL 48 1 / 2 " R O 30 1/4" RO 72 1 / 2 " R O 30 1/4" RO 72 1 / 2 " R O 30 1/4" RO 86 1 / 2 " R O 38 7/16" RO 20 1 / 8 " R O 61" RO 2x6 WALL 13 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T FR A M I N G P L A N - S O U T H E L E V A T I O N NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 12 12 4" 42 " 8" 18" 2" STYROFOAM VAPOR BARRIER 4" ROCK OR SAND 4" CONCRETE ALUMINUM SOFFIT ROOFING UNDERLAYMENT 1/2" PLYWOOD DECKING ALUMINUM FASCIA SIDING WRB 1/2" PLYWOOD SHEETING 9-5/8" CMU 24" ENGINEERED FLOOR TRUSS 24" ROOF TRUSS DESIGNED AND ENGINEERED BY TRUSS MANUFACTURE ALUMINUM SOFFIT ROOFING UNDERLAYMENT 1/2" PLYWOOD DECKING ALUMINUM FASCIA SIDING WRB 1/2" PLYWOOD SHEETING 9-5/8" CMU ROOF TRUSS DESIGNED AND ENGINEERED BY TRUSS MANUFACTURE 6 12 12 ' - 2 7 16 " F I E L D V E R I F Y 7' - 0 1 32 " F I E L D V E R I F Y WEST ELEVATION - REAR WALL SECTION SOUTH ELEVATION WALL SECTION WEST ELEVATION - REAR STAIR SECTION AT LOFT 4" 42 " 2" STYROFOAM VAPOR BARRIER 4" ROCK OR SAND 4" CONCRETE 10" 7 7 16 " 7 7 16 " FLOOR TRUSS DESIGNED AND ENGINEERED BY TRUSS MANUFACTURE 8" 18" STAIR RUN/RISE TYPICAL TO BE FIELD VERIFIED 14 17 DE S C R I P T I O N : EN G I N E E R : DA T E : SHEET OF DR A W N B Y : AR C H I T E C T : CO N T R A C T O R : dp1,elev34-6,e1,d1,SX1,SY1 SU T T E R - L A K E H O M E 20 0 B I G I S L A N D - L A K E M I N N E T O N K A - O R O N O , M N PE R M I T S E T WA L L S E C T I O N S NE W H O M E VI L L A M I L C O N T R U C T I O N - I A N V I L L A M I L OS W E L L E N G I N E E R I N G A N D C O N S U L T I N G N/ A 6. 1 1 . 2 0 2 4 Je f f H o f f m a n - 6 1 2 . 7 2 0 . 1 3 9 7 Vapor Barrier should be on the warm side. Foundation insulation required Project Name: Sutter Lake Home Project #: 24-048 Site Address: 200 Big Island Oswell Engineering and Consulting, L.L.C. Page S1 of S4 Orono, MN I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota. Craig Oswell, PE (MN #42341) 6/5/2024 1901 E Hennepin Ave, #201 Minneapolis, MN 55413 Phone: 612-720-4639 Fax: 612-886-2966 www.oswellec.com SCOPE & NOTES Client Name: Villamil Construction ISSUED FOR CONSTRUCTION SCOPE OF WORK: Structural engineering design and detailing for the lateral brace wall requirements, beams, headers, footings, and foundation walls at a proposed single-family lake home. Design is in accordance with the 2020 Minnesota State Building Code and the amended 2018 International Residential Code. The scope is limited to the new specific structural items noted. Means and methods of construction, as well as all non-structural items, are to be by others as required per the Code and standard industry practice. Refer to the architectural drawings for more information. LOADING: Floor:40 psf live and 20 psf dead Roof:35 psf snow and 15 psf dead Deck:10 psf dead plus worst case of 40 psf live or 50 psf ground snow Wind:115 mph ultimate (90 mph allowable) - Exposure Category C Soil:Assumed clay with 60 psf/ft effective active lateral pressure (85 psf/ft at rest) MATERIALS: Concrete:5000 psi minimum compressive strength at 28 days for footings 4000 psi minimum compressive strength at 28 days for walls and slabs Grout:3000 psi minimum compressive strength at 28 days Rebar:Grade 60 (Fy = 60 ksi) Wood/Timber:SPF #2 grade or better for headers, sill plates, king, and bearing studs SPF stud grade or better for all other wood Steel:Fy = 50 ksi LVL:E = 2.0 ksi and Fb = 2600 psi or better Soil:Assumed clay with 1500 psf allowable soil bearing capacity NOTES: 1.The details and plans contained in these drawings are illustrative only and all dimensions are approximate. The contractor is to verify all conditions and dimensions noted and is to contact the engineer prior to performing the affected work should any significant discrepancies be found. 2.The lateral brace wall review was performed in accordance with IRC section R602.10 as applicable. The lower level does not require bracing due to the grade and shape of the structure. 3.Follow all manufacturer recommendations for hardware and materials. 4.All wood in contact with masonry or concrete or in an exterior environment is to be treated or otherwise separated. 5.Unless otherwise noted, the exterior faces of all exterior walls are to be sheathed continuously with 7/16" minimum thick OSB or plywood nailed with 8d (0.131" diameter x 2.5") nails at 6" on center at all panel edges and at 12" on center in the field. 6.Unless noted otherwise, the opposite face of all shear wall panels is to be sheathed with 1/2" sheetrock with standard fastening. 7.Exterior wall sheathing is to extend to the roof line at gables. 8.Unless noted otherwise, all horizontal sheathing edges at all panel locations minimum are to be fastened to 2x full width horizontal blocking. 9.The roof is to be sheathed with 7/16" minimum thick OSB or plywood nailed with 8d (0.131" diameter x 2.5") nails at 6" on center at all panel edges and at 12" on center intermediate. 10.The floors are to be sheathed with 3/4" minimum thick OSB or plywood nailed with 8d (0.131" diameter x 3") nails at 6" on center at all panel edges and at 12" on center intermediate. 11.Provide all general nailing and/or alternative screw/staple options as required per IRC tables R602.3(1), R602.3(2), and R702.3.5. 12.Staples (minimum of 16 GA x 1.5" long) may be used in the exterior plywood/OSB roof and wall sheathing at half the spacing noted. 13.Block the roof truss heels and floor spaces at all shear wall panels per IRC figures R602.10.8(1) and (2) and R602.10.8.2(1), (2), and (3). 14.Lap all rebar at least 60 bars diameters when required. 15.Bend or hook all horizontal rebar at least 30" around all corners and each way at intersections. 16.Place the center of anchor bolts for walkout walls at least 2" from the edge of both the sill plate and foundation wall. These bolts are to be 0.5" diameter spaced at 72" on center maximum with standard washers and 7" embed. 17.Place the center of anchor bolts for full height walls (9' clear height) at least 2.5" from the edge of both the sill plate and foundation wall with at least 1" to from bolt edge to inside of face shell at masonry. The anchor bolts at these walls are to be spaced at 36" on center maximum for concrete and 32" on center for masonry. The bolts are to be 0.5" diameter with 0.125" thick x 2" round or square countersunk washers and 7" embed. 18.Concrete full height walls are to be reinforced with (2)#4 continuous horizontal bars. Vertical reinforcing is not required. 19.The full height masonry walls require #6 vertical bars at 24" on center placed 3" from the inside face. 20.The strip footings for masonry walls require (2)#5 continuous horizontal bars. 21.Provide at least two anchor bolts per section of sill plate with one within 12" of each end. 22.Attach the floor trusses to the full height wall sill plate with a Simpson or equal A35 clip on each side. 23.Dowel the foundation walls to the strip footings with #4 x 2'-0" long bars at 72" on center with 5" minimum embed. 24.Provide standard non-bearing wall floor blocking at the top of the foundation wall at 24" on center connected to the sill with face mount hangers capable of at least 1100 lb. 25.Grout all top courses and the first course below the slab ledge solid for CMU walls. 26.Fasten the bottom flange of steel beams to their bearing with a 0.5" diameter lag screw with 3" embed on each side of the web. 27.Block the web solid for face mount joist attachment with 0.5" diameter thru bolts at 24" on center staggered. 28.Provide wood 2x top and bottom plates as needed on steel beams with 0.5" diameter bolts at 48" on center staggered. 29.Block or brace all beams at their ends and along their lengths against movement and rotation. 30.Unless otherwise noted, fasten all beam lams together from each side with two rows of 0.131" diameter x 3" long nails at 12" on center staggered. Use three rows at beams 14" or deeper. 3' - 0 " 5' - 0 " 3'-01 4"9'-51 2"9'-51 2"3'-81 4"7'-11 2"6'-51 2" 3'-21 4"19'-3" UDH-G2 2432-2 UDH-G2 2420-3W UD H - G 2 2 4 2 0 UC A 3 0 4 8 - L R UC A 3 0 4 8 - L R UDH-G2 2432-2 USFDR12070 MECH 9'-1" x 13'-0" BATHROOM 6'-7" x 5'-6" BEDROOM 11'-6" x 13'-7" LIVING ROOM 22'-9.5" x 25'-7.5" BEDROOM 9'-8" x 13'-7" 42'-0" 34 ' - 0 " 4' - 0 " 9' - 2 " 5' - 8 " 10 ' - 8 " 4" 4" 7' - 6 " 11 ' - 8 " 5' - 2 " (2x4) 4.5" FURRING WALL TYP (2x4) 4.5" INTERIOR WALL TYP (2x6) 6.5" EXTERIOR WALL TYP 10" CMU/CONC FND TYP UNO 8" CMU/CONC FND W/ 2" LEDGE @ WALKOUT LOWER FLOOR PLAN1NOT TO SCALE 24" FLOOR TRUSSES @ 19.2" O.C. 12"12" UP 14'-113 4"27'-01 4" 26 7 0 26 7 0 3070 2670 18 " x 8 " 22 " x 8 " 16 " x 8 " 16 " x 8 " 18" x 8" 18" x 8" 18 " x 8 " 4" 4' FTG STEP 12'+/- FROM WALKOUT 4' FTG STEP 12'+/- FROM WALKOUT 3'-21 4" (2)9.25" LVL ALL LF HEADERS ARE (2)2x10 UNO. USE (2) BRG & (1) KING STUD TYP UNO. (2)+(3)(2)+(3) 24" FLOOR TRUSSES @ 19.2" O.C. 24" FLOOR TRUSSES @ 19.2" O.C. 24" FLOOR TRUSSES @ 19.2" O.C. GROUT EXTERIOR CMU FND WALLS @ STAIRWELL SOLID W/ BOND BEAMS W/ (2)#5 CONT AT TOP & MID-HEIGHT OF WALL EXTENDING AT LEAST 32" BEYOND EACH END FLUSH (3)2x12 12 ' - 0 " 4'-0" 8' - 0 " 11'-21 4"13'-0"10'-91 2"11'-01 4" 13 ' - 0 " 13 ' - 0 " FLUSH (3)2x12 FLUSH (3)2x12 FLUSH (3)2x12 FL U S H ( 2 ) 2 x 1 2 FL U S H ( 2 ) 2 x 1 2 FLUSH (2)2x10 BEAR 3" ON HOUSE WALL 2x10 LEDGER W/ 0.5" DIAM THRU BOLTS @ 24" O.C. STAGGERED TYP 24" DIAM 24" DIAM 2x 1 0 D E C K J O I S T S @ 1 6 " O . C . ( 5 0 0 L B HA N G E R S ) 24" DIAM16" DIAM (2 ) 2 x 1 0 R I M S T Y P 16" DIAM 16" DIAM 16" DIAM 16" DIAM INSTALL (1)1500 LB TIE BACK ANCHOR AT EACH END OF EACH DECK SECTION (4 TOTAL) UP 24" x 24" x 12" THICK CONC FTG PAD 1" 4" 50 7 0 OFFICE 10' x 13'-7" 4" PT LOAD ABOVE Project Name: Sutter Lake Home Project #: 24-048 Site Address: 200 Big Island Oswell Engineering and Consulting, L.L.C. Page S2 of S4 Orono, MN I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota. Craig Oswell, PE (MN #42341) 6/5/2024 1901 E Hennepin Ave, #201 Minneapolis, MN 55413 Phone: 612-720-4639 Fax: 612-886-2966 www.oswellec.com LOWER FLOOR PLAN (NOT TO SCALE) Client Name: Villamil Construction ISSUED FOR CONSTRUCTION 2'-4" 8'-51 2"4'-81 4"7'-11 2"7'-11 2" 7'-01 2" 3'-4" 8'-51 2"4'-81 4" 13'-6" 5'-51 4"5'-51 4" 3'-41 2" 5'-61 2" BATH 5'-0" x 5'-1.5" M BEDROOM 15'-11.25" x 14'-3" GREAT ROOM (OPEN TO ABOVE) 22'-9.5" x 26'-3.5" M BATH 10'-2.75" x 14'-3" 42'-0" 34 ' - 0 " 12"12" 4' - 0 " 9' - 2 " 4' - 4 " LO F T F L O O R - 9. 5 " T J I 2 1 0 J O I S T S @ 1 2 " O . C . (6 0 0 L B H A N G E R S ) 10 ' - 3 1 2" 4" 5'-9" 7' - 6 " 6' - 7 1 2" MC 6'-0" x 10'-6.5" 3' - 0 " MAIN FLOOR PLAN1NOT TO SCALE UDH 2432 USFDR12070 USFDR6070 8' - 3 " UD H - G 2 2 4 2 0 UD H - G 2 2 4 2 0 UD H - G 2 2 4 2 0 - 2 W 4" 7' - 1 1 1 2" 3' - 6 " UP DOWN 12" 2.5"2.5" VAULTED ROOF TRUSSES ABOVE VA U L T E D R O O F TR U S S E S TOILET 3'-0" x 5'-3" 1.5"1.5" FLUSH BOTTOM LOFT BEAM (RAISED ABOVE FLOOR) STEEL W14x22 (5" WIDE) OR (3)18" LVL UDH-G2 2420 UAWN3020-2W UA W N 3 0 2 0 - 2 W UD H G 2 2 4 3 2 UD H G 2 2 4 3 2 30 7 0 UAWN3020-2W 6' - 4 1 2" 2668 50 7 0 2870 26 7 0 2670 24 7 0 A WSP BRACE LINE REQUIRED LENGTH = 11' < 14'-8" PROVIDED B 1 2 5' - 8 " P A N E L 5' P A N E L 4' P A N E L WSP BRACE LINE REQUIRED LENGTH = 11' < 14'-3" PROVIDED 6' - 8 " P A N E L 7' - 7 " P A N E L WSP BRACE LINE REQUIRED LENGTH = 18' < 19'-10" PROVIDED (NO HORIZ BLKG REQD) 8'-8" PANEL11'-2" PANEL 7'-7" PANEL 4'-7" PANEL 8" ALL MF HEADERS ARE (2)2x8 UNO. USE (1) BRG & (1) KING STUD TYP UNO. (2)7.25" LVL, (2)2x12, OR (3)2x10 (2 ) 7 . 2 5 " L V L , ( 2 ) 2 x 1 2 , OR ( 3 ) 2 x 1 0 (2 ) 7 . 2 5 " L V L , (2 ) 2 x 1 2 , O R (3 ) 2 x 1 0 (2)7.25" LVL, (2)2x12, OR (3)2x10 (2)7.25" LVL OR (2)2x10 (2)7.25" LVL OR (2)2x10 (3)11.25" LVL BETW HI & LOW FLUSH (2)2x12 UDH 2432 WSP BRACE LINE, REQD LENGTH = 9' < 15'-8" PROV 3'-9" PANEL CA 3'-6" (1)BRG FOR 2' WINDOW + (6)9.25" LVL KING (FACE MOUNT PATIO DOOR HEADER TO KINGS W/ 1400 LB HANGER) CONNECT LVL KINGS TO SILL PLATES @ TOP & BOTTOM OF WALL W/ 1400 LB FACE MOUNT HANGER TYP (BLOCK ROOF TRUSSES AT TOP AS REQUIRED) (2x4) 4.5" INTERIOR WALL TYP (2x6) 6.5" EXTERIOR WALL TYP UNO (2x10) 10.25" EXTERIOR WALL @ GREAT ROOM (NON-FIREPLACE SIDE) LO F T F L O O R 9 . 5 T J I 11 0 J O I S T S @ 1 6 " O . C . (5 0 0 L B H A N G E R S ) (2) FL U S H (2 ) 1 1 . 2 5 " L V L R=2K PANTRY 4'-3" x 7'-4" R=1.5K (2) (3) (3) FLUSH (2)2x12(2)(2) 26'-10" 17 ' - 6 1 4" Project Name: Sutter Lake Home Project #: 24-048 Site Address: 200 Big Island Oswell Engineering and Consulting, L.L.C. Page S3 of S4 Orono, MN I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota. Craig Oswell, PE (MN #42341) 6/5/2024 1901 E Hennepin Ave, #201 Minneapolis, MN 55413 Phone: 612-720-4639 Fax: 612-886-2966 www.oswellec.com MAIN FLOOR PLAN (NOT TO SCALE) Client Name: Villamil Construction ISSUED FOR CONSTRUCTION 3'-0"23'-31 2" 23 ' - 4 " 10 ' - 8 " LOFT PLAN1NOT TO SCALE DOWN UCAPOLY - TRAPEZOIDS ABOVE PATIO DOOR UCA POLY TRAPEZOID / UAWN7224 LOFT SPACE GREAT ROOM (OPEN TO BELOW) 27'-21 2" VAULTED ROOF TRUSSES DOWN RO O F T R U S S E S B E L O W VAULTED ROOF TRUSSES H = 9'-1"+/-H = 9'-1"+/-H = 22'-3"+/-H = 16'-3"+/- H = 16'-3"+/- OPEN RAILING Project Name: Sutter Lake Home Project #: 24-048 Site Address: 200 Big Island Oswell Engineering and Consulting, L.L.C. Page S4 of S4 Orono, MN I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota. Craig Oswell, PE (MN #42341) 6/5/2024 1901 E Hennepin Ave, #201 Minneapolis, MN 55413 Phone: 612-720-4639 Fax: 612-886-2966 www.oswellec.com LOFT PLAN (NOT TO SCALE) Client Name: Villamil Construction ISSUED FOR CONSTRUCTION