HomeMy WebLinkAbout1994-11-04 On Site Sewage Treatment Inspection ReportCZTY OP OROMO
Municipal Officts
Post Office Box 66
Crystal Bay, MN SS323-0066
Owner:Qi 1
O o
nix ’ill1.ffs0<msm
ON-8ZTB SINXOB TRBJmmiT
INSPECTION NBPONT
^Address:Sh
Permit #•
City ordinance rxjnber 100 requires that each on*site sewage treatinent system in Orono be inspected on a regular basis.
The on*8ite sewage treatment system at the above address has been inspected and appears to fal'. into the category
checked below.
(This is an existing system [ ] new construction)
1
2
SYSTEM COWFOWMITY (1-3); ^
*'C00E SYSTEM"*A system which meets all the location, design, and construction standards of the current City
Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input
without discharging any pollutants into ground or surface waters.
"CONfOMMIN'i SYSTEM"*A system which does not meet all the location, design, and construction standards of the
current City Codes, but was installed according to the code in effect at the tin« of installation, and which
is operating satisfactorily by treating and disposing of the entire current sewage input without discharging
any pollutants into ground or surface waters.
"NON-CONrORMING SYSTEM'**A prohibited system; a system located within a designated 100-year floodplain; any
system which may or may not meet all the location, design, 'xi construction standards of the current City
and which is failing for any reason; and any system w less than 3 feet of unsaturated soil or s^
n the distribution deyice end the limiting'sou chArBCtertstles:—FTT TT \~1~^ \-Q1
ioil characteristichas or [ 1 has not been identified atfthis tll^. If the litMi
has not been identified, this classification may be subject to reyision.)
9
Codes
between
(The limiting soil
characteristic "
I ting soil
TANK COMOITIOM (5-10);
Tank inspection indicates:
5 Punpout not needed at this time.
6 Solids acciflsulation in tanks indicates they should be punped out this year to help preyent future problems.
7 Solids accumulation in tanks is at a critical leyel. Tanks should be punped out as soon as possible.
8
9
System
Inspection
I is discharging to the surface. Tanks must be punped out within 48 hours to eliminate surface discharge,
tion risers missing-tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in each
tank at next punpout. If tanks have not been punped out within the last three years, they should be pu^wd
out now.
toy Inspection pipe is located directly over tank baffle (does not give accurate measurement of solids accunulation).
If tanks have not been puipeci out within the last three years, they should be punped out now.
DBAIMPIELD COMPITIOW (11-14):JX
Dcmfffield inspection indicates: njy Orainfield is dry, no surfacing
^ Some evidence of surfacing, not
13
14
evident,
critical yet.
Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector
immediately. Repairs must be completed within 90 days.
Orainfield extent and cordition unknown.
LIMITING SITE FACTORS (slooe.setbacks.etc.1: _ _ _ _ _
POTENTIAL FOR SYSTEM FAILURE Cdeoends on soils.water table.etc.): /7l^/y,7YUy^^
COMMENTS:^
Note:
property.
In the event that this inspection report is used to satisfy the requirements for a mortgage or other t
y, be advised that this report does not guarantee or certify that an existing system will continue t
y, but is merely an opinion of the ade^cy of the system under current conditions based on the
transfer of
to function
available
This report must be kept on the premises with the system location and pusping records.
WHITE COPY /Inspactors File YELLOW COPY HomaoMmar
j