V -
SOIL TESTING SERVICES OF MINNESOTA, INC.
2405 ANNAPOLIS LANE SUITE 280
MINNEAPOLIS. MINNESOTA 55441 PHONE 612-559*1900
October 17, 1977
McNulty Construction Company
609 2nd Avenue South
Suite 800
Minneapolis, Minnesota 55^02
Attention: Mr. Richard Stover STS Job No. 91201
Re: Soil Percolation Test, Tract E, as Shown on Registered Land Survey No. 1358,
Maxwell Bay, Orono, Minnesota.
Gentlemen:
We were requested by you to perform soil percolation tests at the above refer
enced property (see attached sketch). The tests were performed on October 14, 1977»
The procedure was performed in accordance with the methods designated by the Minne
sota Department of Health, 1971. The attached log sheet indicates the observed
percolation rates at each of the test holes (P-1 through P-6). The observed perc
olation rates at five of the test holes (P-1 through P-3, P“5, P“6), were within
the maximum allowable rate of 60 minutes per Inch, as recommended by the Minnesota
Department of Health. Basea on these observations, the installation of an individual
soil absorption system will be acceptable in this portion of the area tested.
In addition to the above percolation test holes, one (l) test boring was
drilled to a depth of 8.0 feet. It is our opinion that the level of the ground
water table at the time of testing v/as below that depth.
Fluctuations in the water level may occur over a wi'^ range, depending upon
the amounts of precipitation, evaporation, surface runoff, and infiltration, which
will vary with seasonal changes.
William C. Kwasny. P.E.
John P. Gnaedinger. P.E.
Clyde N. Baker. P.E.
James H Overtoom, P.E.
R. Eric Zimmerman. Ph.D., P.E.
William M. Perpich. P.E.
CHICAQO, PEORIA, ROCKFORD, ILLINOIS • WASHINGTON, D.C. • CEDAR RAPIDS,
DAVENPORT, DES MOINES, IOWA • KANSAS CITY, WICHITA, KANSAS • BAY CITY,
DETROIT, GRAND RAPIDS, MARQUETTE, MICHIGAN • MINNEAPOLIS, VIRGINIA,
MINNESOTA • BISMARK, GRAND FORKS, NORTH DAKOTA • FAIRFAX, VIRGINIA
GREEN BAY, MILWAUKEE, WAUSAU, WISCONSIN • MADRID, SPAIN • JEDDAH,
SAUDI ARABIA
• Engineering Analysis/Reports
• Construction Quality Control
• Foundation Borings and Testing
• Environmental Testing and
Evaluation
V.
I
V -
I
i.
L
i - ■ :
^ •
Mr. Richard Stover
October 17. 1977
Page two
Based on the test results, installation of an individual soil absorption disposal
system would be acceptable in the area of test P-1 through P-3, P-5, and P-6, for
a recommended design rate of 46 to 60 minutes per inch, requiring a minimum of 330
square feet of absorption area per bedroom. The observed water table in the area is
at a depth of greater than 6.5 feet below the existing ground surface, making an
absorption system acceptable according to state codes and regulations.
The provisions of the "Ordinance and Code Regulating Individual Sewage Olsposal
Systems" (1971). as recommended by the Minnesota Department of Health, as well as
any local ordinances and codes, should be followed in the design and installation of
a disposal system.
If you have any questions with regard to this report, please do not hesitate
to contact us.
Very truly yours,
SOIL TESTING SERVICES OF MINNESOTA, INC.
Richard Covill
Soli Engineer
RKC/ljl
A
>
I
i
■ 4
r-
I
lOD
?-4e
«-•r
f.i
I
It-l
PErfecouA'flO'vl T£<r ♦Vout
^.oe»Ni(?j LocA-rio/4
O CcU-reiS 6^ >eoft>S€r7
^\i- »v3^oi5pnof4 C'^-sr£:>v\-2’>«2.'*
ay PER-^NiSru
Of ^joC^CkI Gsf A»4^ La,(i^
j:
3o' "*^12^ ,
•jC
*21?-5. ^'. u20_o
e-q^ (Be
/
CtJJtfcRuUf ^
if RM>Ce ^
:.i«^ \L
(i6m»M<^R.<.\HVVA-'»H I *>•*
5' t«Ee LOCATJ^ i'4,i'.u.. 4 S.E.wCntR
6^ \M,RE fEUCfe
---------1*^-------»<-----K ^—-
,, ftPPRo* 35'+siS'»oe6ui4E,iwH*v0feU.B>V'/
S?C^cUVf^o^^ M-& .UC!Wi^j4 _ _
£or 5«:AC.T Ej •Di:tC»i
ofo^O. lv,vlv|
SOIL TESTING SERVICES
OF lllilNNESOTA.INC.
2405 ANNAPOLIS LANE
MINNEAPOLIS. MINN. 55441
^V4KCI*0
Percolation Test
Summary Sheet
STS .InhNn 91201
Clisnt McNulty Construction Company •w
Sit6 Tract E. Maxwell Bay. Orono. Minnesota
HOLE NUMBER
P-1 P-2 P-3 p-it
DEPTH OF HOLE
3.0'
Surface Elevation
+110.8' 3.0'
Surface Elevation
+110.3'3.0'
Surface Elevation
+107.9'
Surface Elevation
3.0' +108.0
PERCOLATION RATE
MINUTES/INCH 22 i|8 A8 120
SOIL PROFILE DEPTH DESCRIPTION DEPTH DESCRIPTION DEPTH DESCRIPTION DEPTH DESCRIPTION
0-0.5'
.5-2.5
2.5-3'
Black organic sandy
silt topsoil - (OL)
Brown sandy clay -
(CL)
Brown clayey fine
to medium sand -
(SC)
0-0.5
.5-3.0
Dark gray sandy
silt topsoil -
siightly organic -
(ML)
Brown sandy clay -
(CL)
0-0.5'
.5-3.0
Dark gray sandy
silty clay topsoil
siightly organic -
(CL)
Brown sandy clay -
(CL)
0-1.0 I
2-3.0'
2-3.0'
Black organic
sandy silt
topsoil - (OL)
1
Brown sandy clay
(CL)
Brown sandy claye
silt - (ML)
REMARKS
-ji
lD-td'l7
Percolation Test
Summary Sheet
STS .InhNn 91021 »•'
Client McNulty Construction Company
Sjt0 Tract E, Maxwell Bay, Orono, Minnesota
A
HOLE NUMBER
P-5 P-6 B-1
DEPTH OF HOLE Surface Elevation
3.0' +120.7'
Surface Elevation
3.0' +116.8*7.8 I
Surface Elevation
+110.0*
PERCOLATION RATE
MINUTES/INCH 34 22
SOIL PROFILE
.i.
[.
J V'
iT...■‘f, \
^ ■.
t'rh
WJ.
DEPTH DESCRIPTION DEPTH DESCRIPTION DEPTH DESCRIPTION DEPTH
0-1.0'
1-2.5
2.5-3'
Black organic
sandy silt topsoil
(OL)
Brown sandy clay ~
(CL)
Brown clayey fine
to medium sand to
sandy clay with a
1ittle gravel -
(SC-CL)
0-0.5* Dark brown silty
fine to medium sand
to sandy silt top-
soi1 - siightly
organic - (SM-ML)
.5-2.5'Brown clayey fine
sand to sandy clay
(SC-CL)
2.5“3' Brown clayey to
silty fine sand -
(SC-SM)
0-0.5'
.5-8.0
Dark gray sandy
silty clay top
soil - slightly
organic - (CL)
Brown sandy clay -
(CL)
DESCRIPTION
REMARKS Water Level:
Dry AB
Dry 24 hours AB
McCOMBS-KNUTSON ASSOCIATES, INC.
CONSULTING ENGINEERS! LAND SURVEYORS SITE PLANNERS
December 8, 1977
Thomas Jacobs
City of Orono
P.O. Box 66
Crystal Bay, Minnesota 55323
oimiDwiTiTi
DEC 12 19'? ■
y
1.
VILLAGE OF 0RQN4
Subject:Septic System Application Review
McNulty Construction at 3250 Fox Street
Dear Tom:
At your request of December 5, 1977, we have reviewed the
subject application. Based on the percolation test results,
we concur with the recommended design factor of at least
330 S.P. of adsorption area per bedroom. Water table
problems are not expected to pose a problem, so a standard
system is acceptable. We request that the applicant submit
a design layout for the septic system (location of proposed
house, septic tanks, and drainfield) for both a primary site and
alternate site. The elevations of lot corners, the septic
system area (both primary and alternate site), and the house
foundation should be included in the submittal. Until this
information is received, we will be unable to complete our review
of the application.
If you should have any questions, please advise.
Very t^uly ^urs,
McCOllbS-KNli^ON/;^SSOCIATES , INC.
GF:tS
e Frank, P.E.
j.;
12805 OLSON MEMORIAL HIGHWmY. MINNEAPOLIS, MINNESOTA 55441 TELEPHONE (612) 559-3700
22 NORTH MAIN STREET, HUTCHINSON, MINNESOTA 55350 TELEPHONE (612) 879-8029
SOUTHWEST ENGINEERING DIVISION, MARSHALL, MINNESOTA 56258 TELEPHONE (507) 532-5820
pifriiyil on Kicvded papui
r.-i-..
i
?
■
A
McCOMBS-KNUTSON ASSOCIATES, INC.
CONSULTING ENGINEERS! LAND SURVEYORS! SITE PLANNERS
December 16, 1977 lrI .re 19 1977
i
Tom Jacobs
City of Orono
P.O. Box 66
Crystal Bay, Minnesota
Vjl.i AGE OF4 ORONO i
55323
Subject:Septic System Application Review
McNulty Construction at 3250 Fox Street 1
Dear Tom:
. t
We have reviewed the additional septic system application
information submitted on the subject site. The proposal
is to install a standard on-site septic system with complete
gravity flow. The system will consist of two tanks (1000 gallons
and 750 gallons) followed by 4 drainfield lines, each 125 feet
long X 7 ft. center-to-center x 3 ft. wide trenches. The net
drainfield area is therefore 1500 S.F., which is more than adequate
for four bedrooms based on the reported percolation rates
(ranged from 22 to 48 mpi). The septic system was designed on
the basis of 330 S.F. per bedroom, which is the minimum recommended
for a percolation rate of 60 mpi.
We recommend approval of the application.
Very^truly yours,
JTSC)N ASSOCIATES, INC.
GF:ts
McCOMBS-
u
F enk, P.E.
12806 OLSON MEMORIAL HIGHWAY. MINNEAPOLIS. MINNESOTA 55441 TELEPHONE (612) 558-3700