My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LA20-000042 2520 Casco Pt Rd, VAR, Ex B Proposed Plans
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2520 Casco Point Road - 20-117-23-21-0017
>
Land Use
>
LA20-000042, VAR
>
CC 08132020
>
LA20-000042 2520 Casco Pt Rd, VAR, Ex B Proposed Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2026 12:22:08 PM
Creation date
6/9/2026 12:21:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake <br /> <br /> <br /> <br /> <br />M <br />i <br />n <br />n <br />e <br />t <br />o <br />n <br />k <br />a <br />Casc <br />o <br /> <br /> <br /> <br /> <br />P <br />o <br />i <br />n <br />t <br /> <br /> <br /> <br /> <br />R <br />o <br />a <br />d <br />S1Minnetonka, Minnesota 55345 <br />Phone (952) 474-7964 <br />17917 Highway 7 <br />Web: www.advsur.com <br />Advance <br />Surveying & Engineering, Co. <br />LAKE COUNTRY BUILDERS <br />2520 CASCO POINT ROAD <br />CLIENT NAME / JOB ADDRESS <br />ORONO, MN <br />SHEET TITLE <br />PROPOSED SURVEY SHEET NO. <br />SHEET 1 OF 1 <br />DRAWING ORIENTATION & SCALE <br />40200 200919 JR <br />DRAWING NUMBER <br />LEGAL DESCRIPTION: <br />The southwesterly half og Lot 4, TOWNSITE OF LANGDON PARK, Hennepin County, Minnesota. <br />SCOPE OF WORK & LIMITATIONS: <br />1.Showing the length and direction of boundary lines of the legal description listed above. The scope of our services <br />does not include determining what you own, which is a legal matter. Please check the legal description with your <br />records or consult with competent legal counsel, if necessary, to make sure that it is correct and that any matters of <br />record, such as easements, that you wish to be included on the survey have been shown. <br />2.Showing the location of observed existing improvements we deem necessary for the survey. <br />3.Setting survey markers or verifying existing survey markers to establish the corners of the property. <br />4.This survey has been completed without the benefit of a current title commitment. There may be existing <br />easements or other encumbrances that would be revealed by a current title commitment. Therefore, this survey <br />does not purport to show any easements or encumbrances other than the ones shown hereon. <br />5.Showing elevations on the site at selected locations to give some indication of the topography of the site. We have <br />also provided a benchmark for your use in determining elevations for construction on this site. The elevations <br />shown relate only to the benchmark provided on this survey. Use that benchmark and check at least one other <br />feature shown on the survey when determining other elevations for use on this site or before beginning <br />construction. <br />6.While we show a proposed location for this home or addition, we are not as familiar with your proposed plans as <br />you, your architect, or the builder are. Review our proposed location of the improvements and proposed yard <br />grades carefully to verify that they match your plans before construction begins. Also, we are not as familiar with <br />local codes and minimum requirements as the local building and zoning officials in this community are. Be sure <br />to show this survey to said officials, or any other officials that may have jurisdiction over the proposed <br />improvements and obtain their approvals before beginning construction or planning improvements to the property. <br />7.Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding and <br />or stucco of the building. <br />8.While we show the building setback lines per the City of Orono web site, we suggest you show this survey to the <br />appropriate city officials to be sure that the setback lines are shown correctly. Do this BEFORE you use this <br />survey to design anything for this site. <br />STANDARD SYMBOLS & CONVENTIONS: <br />"●" Denotes iron survey marker, set, unless otherwise noted. <br />SHEET SIZE 22 X 34 <br />SCALE - 1" = 20'# <br />LICENSE NO. <br />DATE <br />JUNE 9, 2020 <br />DATE DRAFTED:JUNE 9, 2020# 52716 <br />Joshua S. Rinke <br />MAY 15, 2020DATE SURVEYED: <br />SURVEYED BY <br />ADVANCE SURVEYING. & ENG., CO. <br />GRADING & EROSION CONTROL NOTES: <br />BEFORE DEMOLITION AND GRADING BEGIN <br />·Install silt fence/bio roll around the perimeter of the construction area. <br />·Sediment control measures must remain in place until final stabilization has been <br />established and then shall be removed. Sediment controls may be removed to <br />accommodate short term construction activity but must be replaced before the next rain. <br />·A temporary rock construction entrance shall be established at each access point to the <br />site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from the street into <br />the site and shall be underlain with permeable geotextile fabric. The entrance shall be <br />maintained during construction by top dressing or washing to prevent tracking or flow <br />of sediments onto public streets, walks or alleys. Potential entrances that are not so <br />protected shall be closed by fencing to prevent unprotected exit from the site. <br />·Contractor shall install inlet protection on all existing storm sewer inlets in accordance <br />with the city standard details. Inlet protection shall also be provided on all proposed <br />storm sewer inlets immediately following construction of the inlet. Inlet protection must <br />be installed in a manner that will not impound water for extended periods of time or in a <br />manner that presents a hazard to vehicular or pedestrian traffic. <br />DURING CONSTRUCTION: <br />·When dirt stockpiles have been created, a double row of silt fence shall be placed to <br />prevent escape of sediment laden runoff and if the piles or other disturbed areas are to <br />remain in place for more than 14 days, they shall be seeded with Minnesota Department <br />of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray <br />mulch. <br />·A dumpster shall be placed on the site for prompt disposal of construction debris. <br />These dumpsters shall be serviced regularly to prevent overflowing and blowing onto <br />adjacent properties. Disposal of solid wastes from the site shall in accordance with <br />Minnesota Pollution Control Agency requirements. <br />·A separate container shall be placed for disposal of hazardous waste. Hazardous wastes <br />shall be disposed of in accordance with MPCA requirements. <br />·Concrete truck washout shall be in the plastic lined ditch and dispose of washings as <br />solid waste. <br />·Sediment control devices shall be regularly inspected and after major rainfall events and <br />shall be cleaned and repaired as necessary to provide downstream protection. <br />·Streets and other public ways shall be inspected daily and if litter or soils has been <br />deposited it shall promptly be removed. <br />·If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the <br />site in the rock entrance areas <br />·Moisture shall be applied to disturbed areas to control dust as needed. <br />·Portable toilet facilities shall be placed on site for use by workers and shall be properly <br />maintained. <br />·If it becomes necessary to pump the excavation during construction, pump discharge <br />shall be into the stockpile areas so that the double silt fence around these areas can filter <br />the water before it leaves the site. <br />·Temporary erosion control shall be installed no later than 14 days after the site is first <br />disturbed and shall consist of broadcast seeding with Minnesota Department of <br />Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray <br />mulch. <br />·Erosion control measures shown on the erosion control plan are the absolute minimum. <br />The contractor shall install temporary earth dikes, sediment traps or basins and <br />additional silt fencing as deemed necessary to control erosion. <br />SITE WORK COMPLETION: <br />·When final grading has been completed but before placement of seed or sod an “as <br />built” survey shall be done per City of Orono requirements to insure that grading was <br />properly done. <br />·When any remedial grading has been completed, sod or seeding shall be completed <br />including any erosion control blankets for steep areas. <br />·When turf is established, silt fence and inlet protection and other erosion control devices <br />shall be disposed of and adjacent streets, alleys and walks shall be cleaned as needed to <br />deliver a site that is erosion resistant and clean. <br />·Contractor shall maintain positive drainage of a minimum 2% slope away from <br />proposed building.
The URL can be used to link to this page
Your browser does not support the video tag.