HomeMy WebLinkAbout1985-12-30 Memo, Septic System Summary of Corrective Actions5
I
Ir;
r.'
►
r:
f
rot
Proas
Date:
Subjects
Pile - 2905 Fox Street» Orono
Michael P. Gaffronr Assistant Zoning Administrator
December 30# 1985
Kenneth Daniels# 2905 fox Street - Status of On-Site
Sewage System
This memo is to document the action to date on the septic system at
the above subject property.
December 1# 1976 City received a complaint from (John Peterson -
Farview Properties) of sewage coming from Mr. Daniels
septic system and onto the road.
December 9# 1976 Letter sent to Mr. Daniels from A1 Olson# giving him
10 days to correct the violation.
December 27# 1976
thru
January 28# 1977
There were a number of calls and inspections made with
Mr. Daniels - No Compliance.
February 11# 1977 Mr. Daniels sent a letter to Mr. Olson that he would
have the system fixed so it would comply to City
ordinances.
February 1977
April 22# 1977
May 13# 1977
A number of inspections made - verified system was
failing again.
Mr. Olson made a site inspection and confirmed the
septic tank was pumped out.
Mr. Olson sent a letter to Mr. Daniels about effluent
from septic system was flowing on the surface of the
ground and that corrections must be made within 60
days.
June 6# 1977
June 27# 1977
July 15# 1977
An Inspection was made - septic effluent flowing on
surface of ground.
Olson and Widmer made site inspection to locate a site
for septic system.
Letter sent from Mr. Olson giving the following dead
lines:
1. Within 48 hours# have your tanks pumped again and
continue to monitor and pump the tanks until a drain-
field is installed.
2. Within 15 days# have a site analysis done on the
potential drainfield area; i.e., have an engineering
firm take at least 6 percolation tests and a soil
boring. Have the engineer report the result of these
tests and a recommended drainfield design to the City.
r
f
.
.
i
L
2905 Fox Street, Orono
December 31, 1985
Page 2 of 4
3. Within 15 additional days, by August 15, 1977,
have the drainfield installed and operational. This
installation must be authorized by City permit.
August 7, 1977
August 18, 1977
A test report was completed by Carl Borg.
Letter was sent to Mr. Daniels approving the report
and asking for a design.
September 15, 1977 A permit was issued to Carl Widmer to repair system.
September 15, 1977 An inspection was made by Thomas Jacobs, noting IbOO
square feet of drainfield was installed.
February 22, 1982 An inspection report by Mike Gaffron was sent to Mr.
Daniels requiring him to pump tanks as often as
necessary to stop seepage.
February 22, 1982 Letter was sent to Mr. Daniels from Mike Gaffron about
complaints from property owners on Farview of septic
system overflowing on Farview Lane.
February 22, 1982
April 1, 1982
July 30, 1982
Memo to file from Mike Gaffron.
Inspection made by Mike Gaffron - noted some seepage.
A letter was sent to Mr. Daniels that no work had been
started and that work on the system must start within
10 days.
August 16, 1982
August 19, 1982
August 23, 1982
Carl Widmer picked up permit for new system.
System was inspected by Mike Gaffron.
Inspection of mound finished; no pump or alarm
installed.
September 7, 1982 Complaint and inspection made by Tom Jacobs and Mike
Gaffron. Sewage flowing on Farview Lane - photos
taken. Mike Gaffron gave the following orders:
1. Have tank pumped within 24 hours.
2. Immediately connect pump in septic system with
extention cords.
3. By September 21, 1982, install permanent wiring to
pump. Tags will be issued if work is not completed.
September 7, 1982 Letter to Mr. Daniels from Mike Gaffron - items that
must be completed.
2905 Pox Street, Orono
December 31, 1985
Page 3 of 4
September 20, 1982
September 20, 1982
October 8, 1982
December 13, 1982
December 15, 1982
December 20, 1982
January 13, 1983
January 24, 1983
January 28, 1983
February 7, 1983
February 11, 1983
February 18, 1983
March 11, 1983
March 28, 1983
Inspection made by Mike Gaffron and Tom Jacobs -
sewage flowing in street 2/10 of a mile long, photos
taken. Talked to Mrs, Daniels told her to get tank
pumped right away and that a citation will be issued
and that if the problem continues a citation will be
issued for each day the violation exits.
Citation issued to Mr. Daniels - Violation Orono
Ordinance #82.030(a) sewage flowing on surface of
ground.
An inspection was made by Mike Gaffron which verified
that electricity had been connected to pump.
Call from Carl Widmer indicating that the new mound
systm was overflowing and that he would investigate
and get back to Gaffron.
Letter from Widmer to Daniels regarding extraneous
water flows.
Letter from City to Daniels, noting the new problem
and possible corrective or investigative measures.
Letter from City to Daniels noting no progress and
requesting compliance. Photos taken.
Call from Mr. Prudden, 2927 Farview complaining about
discharge.
Letter to Daniels discussing possible solutions.
Phone conversation with Daniels regarding trying to
get Carl Milo of City view Plumbing to look at plumbing
in house.
Call from Milo - he told Mrs. Daniels to shut off all
water before bed, mark water tank level in glass
cylinder, see if it drops overnite.
Call from Daniels - he will check tank out this week
end.
Inspection, dye test of downspouts, memo indicating no
new information obtained.
System was flowing perceptibly on March 28 noted snow
of 2 days before is now melting.
I-
r
!■
't
It
2905 Fox Stre c, OrL.io
December 31,
Page 4 of 4
April 18, 1983
April 20, 1983
April 22, 1983
Noted system is flowing rapidly - 12" snow from 4 days
ago is melting. Flow from east pipe.
Call to Daniels - will meet Michael Gaffron on April
23, 1983, 9 a.m.
Letter to Daniels threating legal action and
requesting compliance.
April 23, 1983
April 25, 1983
Gaffron discussion with Daniels at the the site.
Letter to Daniels noting discussion, requesting
compliance.
April 29, 1983
May 25, 1983
Pumped #2 compartment but ground too wet to make
second trip.
Sewer line from house to tanks televised - indicated
no "branches" or unusual extraneous pipes.
May 28, 1983
July 15, 1983
August 15, 1983
.4Well water tested enA^vOK by Field Engineering, Inc.
Letter to file regarding status of system.
Water meters installed in basement and initial
readings taken.
(Additional meter readings taken 9/1/83, 9/15/83, 10/4/83, 11/3/83,
1/25/85, 1/30/85, 12/27/85)
November 4, 1983
December 27, 1985
Letter to Daniels noting initial water use measure
ments.
Site inspection with Carl Widmer - noted no outflow
from mound, minor standing water at crest of mound.