My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1977-07-15 Letter, Timeline for Septic Repair
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
2905 Fox Street - 04-117-23-34-0007
>
Septic
>
1977-07-15 Letter, Timeline for Septic Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2026 10:33:02 AM
Creation date
6/4/2026 10:20:10 AM
Metadata
Fields
Template:
x Address Old
House Number
2905
Street Name
Fox
Street Type
Street
Address
2905 Fox Street
PIN
0411723340007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mkmm <br />r <br />& <br />Tp’f-phone 473-7.S57 <br />CITY of ORONO <br />Post Office Box 66•Crystal Bay, Minnesota 55323•Municipal Offices <br />On the North Shore of Lake Minnetonka <br />July 15, 1977 <br />Mr. Kenneth Daniels <br />2905 Fox Street <br />Long Lake, Minnesota <br />Mr. Daniels: <br />I have been working with your contractor, Carl Widmer, for some time now tiying to resolve your septic system dis^arge problem. On May 13, 1977, <br />you were given 60 days to have a drainfield system installed. To date, <br />this has not been done. It is imperative that you solve the problem <br />without further delay as the effluent from your system is still spilling <br />across onto your neighbor’s lot. <br />1. <br />2. <br />Within 48 hours, have your tanks pumped again and continue <br />to monitor and pump the tanks until a drainfield is <br />installed. <br />Within 15 days, have a site analysis done on the potential <br />drainfield area; i.e., have an engineering firm take at <br />. least 6 percolation tests and a soil boring. Have the <br />engineer report the results of these tests and a <br />reconBiiended drainfield design to the City. <br />3. Within 15 additional days, by August 15, 1977, have the <br />drainfield installed and operational. This installation <br />must be authorized by City permit. <br />Failure to conplete these items within the time specified will be grounds <br />for tagging of the piAlic nuisance and possible condemnation of occupancy <br />until the situation is resolved. <br />Sincerely, <br />A. P. Olson <br />Asst. Zoning Administrator <br />APO: be
The URL can be used to link to this page
Your browser does not support the video tag.