HomeMy WebLinkAbout1994-11-08 On Site Sewage Treatment Inspection ReportC--
CITY OF ORONO
Municipal Offices
Post Office Box 66
Crystal Bay, MN 55323-0066
O O
A >i ON-SITE SEWAGE TREATMENT
INSPECTION REPORT
Owner:Address:P39i HoxSh
Permit #*gt ^CTlOl Dates: Contractors;
City ordinance number 100 requires that each on-site sewage treatment system in Orono be inspected on a regular
The on-site sewage treatment system at the above address has been inspected and appears to fall into the c
checked below.
basis.
category
(This is ^ an existing system [ ] new construction)
(
SYSTEM CONFORMITY (1-3):
2
3
“CXE SYSTEM"-A system which meets all the location, design, and construction standards of the current City
Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage ir^xjt
without discharging any pollutants into ground or surface waters.
"CONFORMING SYSTEM"-A system which does not meet all the location, design, and construction standards of the
current City Codes, out was installed according to the code in effect at the time of installation, and which
is operating satisfactorily by treating and disposing of the entire current sewage input without discharging
any pollutants into ground or surface waters.
"NON-CONFORMING SYSTEM"-A prohibited system; a system located within a designated 100-year floodplain; any
system which may or may not meet all the location, design, and construction standards of the current City
Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand
between the distribution device and the limiting soil characteristics.
(The limiting soil characteristic has or
characteristic has not been identified, this
I ] has not been identified at this time. If the limiting soil
classification may be subject to revision.)
TANK CONDITION (5-10);
Tank
5
%
6
inspection indicates:
Pimpout not needed at this time.
7
Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems.
in tanks is at a critical level. Tanks should be pumped out as soon as possible.
10
Solids accunulation
System is discharging to the surface. Ta
Inspection risers missing-tanks could not
tank at next pumpout ‘
out now.
t. If
should be pumped out as soon as poss
Tanks must be pcinped out within 48 hours
be inspected. Inspection risers
tanks have not been pumped out within the last thr^ years, they should
ours to eliminate surface discharge.
(4" dia. pipe) must be installed in each
. . . . . . be Dunped
Inspection pipe is located directly over tank baffle (does not give accurate measurement of
If tanks have not been pumpea out within the last three years, they should be punped ou
solids accunulation).
out now.
DRAINFIELD CONDITION (11-14); J
Dprftpfield inspection indici
My Orainfield is dry, no
^ Some evidence of surfa
indicates:
surfacing evident,
surfacing, not critical yet.
Orainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector
inmediately. Repairs must be completed within 90 days.
14 Orainfield extent and condition unknown.
13
LIMITING SITE FACTORS (slope.setbacks.etc.);
POTENTIAL FOR SYSTEM FAILURE (depends on soils.water table.etc.); j
!ENTS:ICOp u
vyTijJnt
m 0
ate
15
Inspection Se]^^ SystemTn^Jector
Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of
property, be advised that this report does not guarantee or certify that an existing system will continue to function
properly, but is merely an opinion of the ade^acy of the system under current conditions based on the available
information.
This report must be kept on the premises with the system location and pumping records.
WHITE COPY/Inspectors File YELLOW COPY/Homsownsr