Laserfiche WebLink
ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />OWNER <br />L av it A NO <br />On the NorN.i Shores of <br />Lake.Minnetonka <br />netonka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />ADDRESS <br />PERMIT NO.'S. �' `� `t DATES �'t i 1 CONTRACTORS f3� 7 1 VY« <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewage <br />treatment system at the above address has been inspected and appears to fall into the category checked below. <br />(This is ET an existing system ❑ riew construction) <br />1 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating <br />Properly. <br />2 Does not meet all current City standards for new constriction 11978 Code) but in most respects appears to be designed, <br />located, and constructed generally in a• cordance with previous codes. System appears to be functioning Properly; no major <br />upgrading of the system is required at this -,me. <br />❑ 3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />❑ 4 System may or may not mee; :urrent City standards for design, construction or location, but failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />replacement procedures. If drainfiefd replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submittect for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION! 0 Checked items may require your action) <br />Tank inspection indicates. <br />— ---3 Pumpout not needed at this time. <br />❑ Solids accumulation in tanks indicates they should be pump• <br />ed out this year to help prevent future problems. <br />❑ Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />❑ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />❑ Inspection risers missing —tanks could not be inspected. <br />Inspection risers (4" dia. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />SITE CHARACTERISTICS. <br />Limiting Site Factors <br />❑ Slope <br />❑ Soil <br />--�1 High water table <br />—1 Lot size <br />❑ Lake, wetland, or stream <br />_—_E1 Drainage <br />COMMENTS: <br />Date of Inspection <br />❑ Inspection pipe is located directly over tank baffle. (Doss not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the Past three yaws, they <br />should be pumped out now. <br />Drainfield inspection indicates: <br />❑ Drainfield is dry, no surfacing evident <br />❑ Some evidence of surfacing, not critical yet. <br />❑ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />ment or additions to drainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Drainfield extent and condition unknov►n. <br />Potential for System Failure <br />(depends on soil types, water <br />table, and system condition) <br />l_0 Low <br />❑ Medium <br />❑ High <br />❑ System is causing visible <br />surface discharge. <br />Septic System Inspector <br />Site Capabilities for <br />Future Expansion <br />-C1 Adequate <br />❑ Fair <br />❑ Poor <br />❑ Inadequate <br />Note: In the event that this inspection report is used to satisfy the requirementsi for a mortgage or other transfer of property. be advised that <br />this report does not guarantee or certify that an existing system will continue to function properly, bia is merely an opinion of the adequacy <br />Of the system under current conditions based on the available intoi,nation. <br />This report must be kept on the premises with system location dnd pumping records. <br />WHITE COPY / Inspector's File GOLD COPY / rlomeowner <br />