Loading...
HomeMy WebLinkAbout3700 Casco Avenue - Point Of Sale Inspection - Non CompliantTask #105361 Date Called in Date Scheduled7.7 City Of Orono Point of Sale Sanitary Sewer Service I&I Cjdnpliance Inspection Form Property Address: 3700 Casco Avenue PID: 2011723310040 Owner Information Name: atncia Dongos e Mailing Address: (if different from Pro Phone: 612-328-3826 Email: I cabinut@msn.com Inspector Information Name: Company/ Organization City of Orono License number: Phone: 952-249-4686 Email: Inspection System Standard Pass ail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary sewer but should discharge to the ground outside of a building. If the roof 61 drains are connected to the sanitary sewer, disconnect them, plug any open connections to the sanitary sewer using a non-shrinkpermanent material, and redirect the roof drains onto the grgund outside the building. ell Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. SuMp pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (III) Compliance inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and ecifications.(Details on back of this sheet Notes: Toilet Removed o Yes o No For Inspection: Inspectors Signature: Date: X-37 Owners Signature: Date: Cit y Review, ❑ Compliant I V Corrective Action Required - Certificate of Compliance Expires: Corrective Action Due by: — 3— a0 Date: t9�3�a0a �o Signature. Name: ,C a] Service Line Inspection DeIR'1s Weather Conditions: Approximate Depth of Service Type and Size of Service Overall Condition of Service Pipe Please note all connections, fittings, points of concern on service line including infiltration, tree root, cracks, misaligned joints, etc. This report must include a digital copy of the televising. Feet Comment Example: 0 Start for 4" cleanout in NE corner of Basement 1-10 Misaligned joint Infiltration 0 u 'vL .57-r9[ l-' C. 0,. ,U "7-d-l- f is ,f n6AS 416- eu7`S 'is- crAGC— tl l 7 r �OS S-riBGGr X J Tr e � Notes: