Loading...
HomeMy WebLinkAbout1983-02-21 Septic System Design Report•-- SYSTEM DESIGN FOR MCNULTY CONST. LOT 1, BLCCK 1 HI ACRES 7.10 2-21-83 1. Percolation Rate. Type_of System. 21.5 Minutes per Inch. Standard System. 2. Proposed Flow Rate. 4 bedrooms Cr- 150 G.P.D. is 60C. G.F.D. 3. Soil Treatment Area Required. 1.67 percolation factor x 600 G.Y.D. is 1000 so. ft. min. 4..Size .-.d Number of Trenches. Three trenches with a total length of 333 f t. x 3 feet wide is 1000 sq. f t. These trenches should be spaced a minimum of 7.5 f t. center to center, and should be 2-3 feet deep in the natural soil. 5. Drainfield Rock Required. 55.6 cu. yds. of rock is needed to have 12 inches under and 2 inches over a 4 inch distribution pipe. 6. Septic Tanks. 2 septic tanks each c at least 1000 gallon capacity are required. In addition, if the house is kept at the proposrd elevation, it will be necessary to have a third pumping tank and pump in order to reach the higher drainfield Brea. Distribution to the trenches should he by the use of drop boxes Sincerely, PERCCR, INC. Mark S. Gronberg. P.E. r � r SITE EVALUATION REPORT i FOR THE EDGAR HERTZ PROPERTY _.- 1820 FOX STREET, ORONO 5-31-80 On May 17, 1980 Rix percolation holes were tested and s three soil borings taken. The percolation holes were dug 6 inches in diameter to a 42 inch depth. The soil borings were dug 6 inches in diameter to the 4 foot depth and 3 inches in diameter to the remaining depth by hand augers. The average percolation rate for the tour holes in the primary drainfield site was 21.5 minutes per inch. This rate, along with the lack of a high water table woula enable this site to meet the requirements for a standard drainfield. There ie a topographical problem which will require the trenches to be constructed In a v-shape in order to remain relatively level for the entire length of the trench. The alternate site also meets the requirements for a stan- dard drainfield system. However, this area is higher than the probable building site 3o a T;uT^ .would rro3t likely nrcc to b used in this situation. More information concerning the design of the system will • be needed once the size and location of the house are known.If there are any questions or additional informatioA!.needed, plea:-e contact me. Sincerely, PERCOR, INC. Mark S. Gronberg, P.E.-I r t i 407' i, BGoC „r. ���,.�.-�•_. .� ter.• ,• � "• •'' ".� .. ._ �IJ , _-V • � may' �� � • vJ .� ' - -- � =•� � 9 1, 9�1i ` �;;Ai{► oop .220 �\ I +� M� � � D" I� 1.. I � \ 1 Ili �r�•rr , � Y b f �. • , 1 y .' � �►+ � /ATE .� ' f INLET TRENCH CONSTRUCTION DETAILS PIPE TO NEXT DROP BOX c4 DIAMETER INSPECTION L .1 �„ WELL WITH CAP DROP BOX EARTH BACKFILL AT LEAST 4 TO 6 INCH LAYER OF 'C 6" ABOVE TOP OF ROCK MARSH HAY OR STRAW AND LAYER OF Rci) ROSIN���� n� Mn,TITInni Moc PAPER AT LEAST 12" DEPTH OF CLEAN ROCK 3/4" TO 2 '/2" DIA. V.• MAXIMUM LENGTH r 100 FEET OVERFILL TO 6 NOTES: I. BOTTOM OF TRENCH MUST BE FLAT ALONG �4 INCHES LENGTH. INSPECTION . __ _ _ i ~ WELL 2• SLOPE ON DISTRIBUTION PIPE IS BETWEEN LEVEL AND 4 INCHES PER 100 FEET. y� BACKFILL RECOMMENDED SLOPE IS I TO 2 INCHES PER 6�� TO 12" OF 100 FEET. o SOIL BACKFILL 3. DISTRIBUTION PIPE CAN BE PERFORATED ° --��. PLASTIC WITH I/p INCH OR LARGER HOLES. ° �2" DEPTH OF ONE OF THE ROWS OF HOLES MUST BE LOCATED ALONG THE BOTTOM OF THE PIPE. ROCK ABOVE PIPE ONE -FOOT AGRICULTURAL DRAIN TILE CAN ROCK ° BE USED WITH A 1/4 INCH SPACING. ° AT LEAST 12" OF o ROCK BELOW 4. SCARIFY TRENCH BOTTOM AND SIDEWALLS PIPE AS HIGH AS ROCK WILL BE PLACED IN THE TRENCH IN ORDER TO EXPOSE NATURAL SOIL. TO 35" REMOVE LOOSE SOIL BEFORE PLACING ROCK. v u • PERCOLATION TEST SHEET - Test hole location I I r?' s CBole # f Date test hole was prepared: Depth of hole bottom: t t' Inches Diameter of hole: -�- Inches Soil Data from test holes depth, inches soil texture: soil color Method of scratching sidewalk b��' �.� Depth of pea size Ravel in bottom of hole: Z inches Date and hour of initial water filling: %'b ' " Depth of initial water filling; above hole bottom Method used to maintain 1=' of water depth in !tole for d hours:, : •; Percolation test conducted byt ^e �, :- '�•`' Percolation test started at : Mauimuat water depti► above hole bottom during'`--s& ._-- inches 1NTlRVAfr WAT�1! WATI<R DROP WATKR DROP � PNRC RATK CALCULATION Timm (M mUTXz) Ott q l inat) START -Y PRUE SISFILL r /.► (� AID qlljgW RiItLL RsstLL—.WIc --- - -. J. 7 .-_ RRftLL REFILLVIEW -�rH Rt�tLL• -��- Tm Pacast Cakulatim 0 O,E.F . OAO — OR-r #gin Vwsj$ IMzA! ilis.t! 1l�s.IB gtis.11 =8J6 imam • 1Rsf MA MwA tMeA 1401 "3 JI XsA Wasm F.v,N ttteen ow ass Rignror mon alto N unMt„ aww"o thn ~tau. 26 Certificate of Survey for Ugar T. YArtz of Lot ;,, Block 1, Ualdron Kcditlor. Har,repin Cowity, Minneant:l - i P - iE�cot A rioN HOG f f. = SO/t BoI A Or, , •,, k 1 I ;. � �r . it .fir•: •. /off 1 ° ;w �— Alt ti ! ',•-� 4 y w.iv �• O � 1 f s e c v �tr6R 1Q b.lr .r.l, o/ f: • tit.to f mt.i --_. INOt A/t•rI o! f FaT I.. . r. I