Loading...
HomeMy WebLinkAboutCity of Orono Existing Hardcover Calculation WorksheetDate: Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. 1.5X12R 62X3Q 62X3P Proposed Hardcover Percentage [(3)+(4)]18.15% (Proposed Hardcover next page) This is an information packet regarding Hardcover. Every effort has been made to insure the accuracy of the information contrained herein; however, if any information is not consistent with City Code, the Code provisions will prevail. (3) Net Existing Hardcover [Subtract line (2) from line (1)]9932 (4) Total Lot Area 54723 (2) Total Excludable Hardcover 100 (1) Total Existing Hardcover 10023 Excludable Hardcover (See City Code Sec 78-1684): F Y Z 100First 100 Sq Ft of Deck W X U V S Lake Shed within OHW Setback 9.6X9.6 91 T M Stairs 4x6 24 N Stairs 3X8 24 1455.5X26.3O Detached Garage Deck Stairs Column Decorative Wall 18 L Steps Varies 60 I Pavers Varies 62 J South Deck Varies 140 H Stairs within OHW Setback 8x8 64 F East Deck Varies 354 K Patio Vaires 68 Varies 3500 B Detached Garage 38.5X26.3 1013 G Concrete Pad 2x4 8 (720 S.F.) E Pavers 3x3 9 % City of Orono Hardcover Calculation Worksheet 2732 Caroline Avenue 7/26/2016 In the following table, identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, Identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Total (Square Feet) (Example) (Garage) (24' x 30') C Driveway A House Varies 4262 D Pavers Varies 169 Property Address: Prepared By: Sathre-Bergquist Key to Survey Hardcover Item (Describe) Length x Width Step 1: EXISTING HARDCOVER SB Job Number: 54048-001 Prepared by: EJ Wirtz Stormwater Quality Overlay District Tier: (Circle One)