Loading...
HomeMy WebLinkAbout20-09 ExD Comment letter 8-17-2020 August 17, 2020 Don Gamble III VIA EMAIL 10704 Water Lily Lane Bgamble48@gmail.com Woodbury, MN 55129 Re: Carman Street lot splits File #20-000009 Mr. Gamble, The City has received revised drawings showing proposed splits of 2474 and 2480 Carman Street. The City understands that each lot is owned separately. Procedurally, we will process both together (one application, public hearing, agenda item, comment letter, etc.) At the conclusion, however, each will be recorded separately. I have plans sufficient to support a concept review by the City Council, as a follow up to their earlier review. Please let me know if you would like this placed on the Council agenda for August 24th or September 14th. If you intended on going to the Council on August 24, I need confirmation by Wednesday, August 19th. Staff has identified the following comments applicable to these lot splits: 2474 Carman Street 1. The new lot north of the lagoon is not a lake lot, and it not eligible for a dock. 2. This lot is predicated on the MCWD approval of the reclaimed wetland, otherwise the lot does not appear to be 21,780 sq ft of contiguous dry buildable area. 2480 Carman Street 1. The new lot north of the lagoon is considered a lake lot and will have access to a dock. 2. A portion of the wetland on 2474 Carman appears to encroach onto this lot. Any required buffer will likely encroach on the new lot. 3. Please confirm the dry buildable land south of the lagoon, this needs to be at least 21,780 sq ft. Both 1. The Council will have to support a waiver from the lot width requirement for the lots south of the lagoon. 2. The Watershed district will need to comment on any buffer, stormwater, or erosion control issues. Please provide MCWD comment. 3. The county will need to approve access onto Shoreline. Please provide Hennepin County comment 4. Under current requirements, this project will require a conservation design plan. Included in this document is the cataloging of substantial trees and identifying those that would be removed. 5. All lots will be served by municipal sewer and all costs associated are the responsibility of the subdivider. 6. Easements may be necessary over drainage and utility areas, access, etc. 7. Connection and other fees will be due at the time of final plat, and include the following: Please feel free to contact me at 952.249.4626 or by email at jbarnhart@ci.orono.mn.us if you have any questions on the above requirements. Sincerely, CITY OF ORONO Jeremy Barnhart, AICP Community Development Director Per Lot fee x Number of New lots =Total fee Stormwater Truck Fee 3,025.00$ 2 6,050.00$ Sanitary sewer Connection 5,380.00$ 2 10,760.00$ SAC fees also due at time of Permit Park dedication 5,550.00$ 2 11,100.00$ Total Fees 27,910.00$