HomeMy WebLinkAbout1989-08-07 Insp Notice, Construction FINALDATE- TIME
CITY OF ORONO CALLED IN ' •� 1 ' �' �'
INSPECTION NOTICt, '/� 3 SCHEDULED
PERMIT NO. COMPLETED
ADEMESS 2) _
TELEPHONE NO. �`� r 1 `� rI .j
: FOOTING L PLUMBING RI
FRAMING C; PLUMBING FINAL
INSULATION C7 MECHANICAL RI
WALL BO. C MECHANICAL FINAL
2 FINAL C FIREPLACEANOOD BURNER
t DEMO — SITE C WATER HOOK-UP
_ DEMO — FINAL C: METER SETUTURN ON
-1
G SEWER HOOK-UP
W
C SEPTIC MAINT.
=
C SEPTIC INSTALL
v
C SEPTIC FINAL
p
U. SITE WELL
C', WELL TEST PUMP
/e
Q
W
cc
IK
9
x
z
zz
WORK SATISFACTORY. PROCEED
W L CORRECT WORK a PROCEED
Q C CORRECT WORK, CALL FOR REINSPECT' +
C1 BEFORE COVERING
C' CORRECT UNSAFE CONDITION WITHIN _ HOURS.
INSPECTOR WILL RETURN
C' STOP ORDER POSTED. CALL INSPECTOR
i INSPECTION REQUIRED .ALL TO ARRANGE ACCESS.
FIRE PREY.
Cl, FIRE SUPRESSION SYS.
17 EXCAVIGRADINGPFILLING
C LAKESHOREl ETLANDS
C TREE REMOIML
0 KENNEL LICENSE
SITE INSPECTION
Q PROGRESS
o COMPLAINT
C FOLLONFUP
. PHOTO TAKEN
r ; CITATION ISSUED
/ZSUE CERTIFICATE OF OCCUPANCY
TEMPORARY
PEiMAANENT
24 harp In wvw m 473.7357
FMa Carr CaPAft me"