Loading...
HomeMy WebLinkAbout1988-04-18 Site Evaluation ReportP c , l L- L/. 2 .'! . ra 4. SITE EVALUATION REPORT FOR TOM TERRY IN THE NW/4 OF SECTION 2-117-23 ORONO, 14INNESOTA On April 11-12, 1988 percolation testing and soil borings were done on the above property with the results and system design following in this report. In addition to the following requirements, two se tic tanks of 1000 gallons are needed along with a third pumping tank of X0 gallons in order to house the pump for pressure distribution to the proposed mound system. All construction and materia!s must adhere to the provisions of the City of Orono. All construction traffic and grading must be kept off both the primary and the a!t2rnate drainfield sites. If any other information is needed, please contact me. Sincerely, PERCOR, INC. Mark S. Gronberg oeo'