Loading...
HomeMy WebLinkAbout16628 - SWMP - Tanager Creek 2-10-2022Storm Water Management Plan Calculations & Summaries TANAGER CREEK Orono, MN Project No. 16628 December 5, 2021 I hereby certify that this plan, specifation or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. _____________________________________________ Adam M. Thiele, P.E. Reg. No. 51317 Prepared By: Prepared For: Anderson Engineering of MN, LLC Ethan DeNary 13605 1st Avenue North, Suite 100 PO Box 192 Plymouth, MN 55441 Babbitt, MN 55706 Ph: 763.412.4000 Ph: 612-802-4052 Fax: 763.412.4090 Anderson Engineering of Minnesota, LLC ● 13605 1st Avenue North, Suite 100 ● Plymouth, Minnesota 55441 ● (763) 412-4000 Main ● (763) 412-4090 Fax ● www.ae-mn.com 1 | P a g e Table of Contents Cover / Certification Page Table of Contents Project Overview Existing Site Conditions Soils Proposed Site Conditions Methodology Rate Control Volume Control Summary Appendix – Exhibits and Calculations A – Existing Drainage Map & HydroCAD Report B – Proposed Drainage Map & HydroCAD Report C – Engineered Plans dated December 5, 2021 D – County Soils Data for Project Area February 10, 2022 Stormwater Narrative/Summary February 10, 2022 Tanager Creek Orono, MN 2 | P a g e Project Overview Tanager Creek is a proposed 3-lot residential development in Orono, MN. The site encompasses 14.06 acres. The property is located in Hennepin County and within the Minnehaha Creek Watershed District. The project will require an Erosion Control Permit and Stormwater Management Permit from Minnehaha Creek Watershed District. The project includes site clearing and demolition of existing structures and pavement found on site. The proposed development will consist of 3 residential lots, each with over a half acre of upland. A private street and cul-de-sac is proposed to provide access off Brown Road. Existing Site Conditions The 14.06-acre property is located on Brown Road (Co Rd 146) in Orono, MN. Runoff is generally directed to the north and east, entering a wetland area that is contiguous with Lake Minnetonka. The existing site features a single-family residence with detached garage and bituminous paved driveway. The area surrounding the residence is vegetated with turf grass with scattered trees beyond. The existing drainage pattern can be seen in Exhibit A: Existing Drainage Map within the appendices of this report. The property is does not have city water or sewer services and is instead served by private well and septic. Soils County Soils data indicates the in-situ soils are Angus Loam which consists of loam and clay loam. These soils area classified as Hydrologic Soil Group C. For our hydrologic modeling we used curve numbers for “B” soils for the existing conditions and “C” soils for the proposed conditions. Proposed Site Conditions The proposed development will consist of 3 single-family residential lots served by a short private street with cul-de-sac. Each lot is proposed to be served by a paved driveway. The post-developed impervious surface area will increase by 14,487sf. Due to the restrictive onsite soils and limited space to implement a conventional stormwater BMP, the project proposed to construct a filtration basin to provide stormwater treatment. The proposed filtration basin includes retention of 4,450 cubic feet of runoff for filtration prior to outletting into the wetland area. The proposed grading plan allows for overland drainage of approximately half of the private street and front of the proposed lots, as well as all runoff from Lot 1 and an additional area of Lot 2 to be routed to the filtration basin. The grading also takes advantage of an area proposed to remain undisturbed as a filter strip to provide pretreatment of runoff. The proposed drainage pattern can be seen in Exhibit B: Proposed Drainage Map can be found in the appendices of this report. Stormwater Narrative/Summary February 10, 2022 Tanager Creek Orono, MN 3 | P a g e Methodology HydroCAD The hydrologic characteristics of the site were modeled using HydroCAD software. TR55/TR20 methods were utilized. Existing and proposed drainage areas were determined based on existing survey and proposed grading. The 2, 10, & 100-year frequency events where analyzed for peak runoff rate control in the existing and proposed conditions. The MSE Type III- 24 hr distribution was used in analysis. Runoff from pervious and impervious surfaces were calculated separately to more accurately model the runoff volume from the site surfaces. For our purposes, only the portion of the property that will be modified as a result of this project has been modeled. Results of this analysis are summarized below, and a report can be seen in Exhibit D: HydroCAD Report. Filtration Basin The project proposes to use a shallow filtration basin to control and treat stormwater runoff. The proposed basin is situated to most efficiently gather a majority of runoff from impervious surfaces prior to discharging to wetland area. The proposed filtration basin will provide 12” of water retention prior to outletting via earthen weir. The bottom of the basin is proposed to be lined with MPCA Filtration Mix C and includes a 6” perforated underdrain. Phosphorus Control Minnehaha Creek Watershed District requires control phosphorus within stormwater runoff. For redevelopment projects, the requirement is considered met if the proposed conditions meet the requirements of the Volume Control regulations. See below for more information. Rate Control Minnehaha Creek Watershed District requires post-development conditions to maintain pre-development peak runoff rates. The table below summarizes the pre- and post-development peak rates for the property: Storm Event Pre Development Rate (CFS) Post Development Rate (CFS) 2yr – 2.86 1.95 1.43 10yr – 4.25 4.72 2.60 100yr – 7.28 12.02 12.03 Volume Control Minnehaha Creek Watershed District requires the retention and infiltration of 1.0” of stormwater runoff from new impervious surfaces, where feasible. Due to restrictive on-site soils, the project has proposed a Stormwater Narrative/Summary February 10, 2022 Tanager Creek Orono, MN 4 | P a g e filtration basin. Per watershed rules, a filtration basin is required to retain twice the volume required for infiltration. The project has an increased impervious surface area of 24,742 square feet, which requires 2,062 cubic feet of volume retention. The proposed filtration basin provides 4,450 cubic feet of retention, more than twice the volume required for infiltration. Summary The implementation of a filtration basin will provide the necessary stormwater control to meet MCWD regulations. 9 3 0 93 5 940940940 94594592 9 9 3 1 93293 3 93 4 9 3 6 93 7 93 8 93 9 941941942942943943944944946946947 947948948945 950 944 94 6 947 948 949 935940945 945 9319329339349369379389399419429439449469469479479 3 0 935 931 932 933 934 936 937 938 939941942 800 BROWN ROAD 920 BROWN ROAD 930 BROWN ROADBROWN ROAD (CO RD 146)N 0 20'40' 2 PLOTTED:COMM. NO. DRAWING NO. ----16628 TANAGER CREEK 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 12/05/2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 860 BROWN ROAD ORONO, MN ETHAN DENARY PRELIMINARY PLAT 1 12/05/21 PRELIMINARY PLAT SUBMITTAL PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.12/05/2021 1X EXISTING CONDITIONS 16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 1HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Area Listing (selected nodes) Area (acres) CN Description (subcatchment-numbers) 1.923 69 50-75% Grass cover, Fair, HSG B (1X) 0.077 98 DRIVEWAY (1X) 0.044 98 HOUSE/GARAGE (1X) 2.043 71 TOTAL AREA EXISTING CONDITIONS MSE 24-hr 3 2yr Rainfall=2.86"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 2HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1X: EXISTING SITE Runoff = 1.95 cfs @ 12.19 hrs, Volume= 0.122 af, Depth= 0.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 2yr Rainfall=2.86" Area (sf) CN Description 83,748 69 50-75% Grass cover, Fair, HSG B * 3,345 98 DRIVEWAY * 1,900 98 HOUSE/GARAGE 88,993 Weighted Average 83,748 94.11% Pervious Area 5,245 5.89% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1X: EXISTING SITE Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 MSE 24-hr 3 2yr Rainfall=2.86" Runoff Area=88,993 sf Runoff Volume=0.122 af Runoff Depth=0.72" Tc=10.0 min CN=WQ 1.95 cfs EXISTING CONDITIONS MSE 24-hr 3 10yr Rainfall=4.25"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 3HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1X: EXISTING SITE Runoff = 4.72 cfs @ 12.19 hrs, Volume= 0.270 af, Depth= 1.58" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 10yr Rainfall=4.25" Area (sf) CN Description 83,748 69 50-75% Grass cover, Fair, HSG B * 3,345 98 DRIVEWAY * 1,900 98 HOUSE/GARAGE 88,993 Weighted Average 83,748 94.11% Pervious Area 5,245 5.89% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1X: EXISTING SITE Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 MSE 24-hr 3 10yr Rainfall=4.25" Runoff Area=88,993 sf Runoff Volume=0.270 af Runoff Depth=1.58" Tc=10.0 min CN=WQ 4.72 cfs EXISTING CONDITIONS MSE 24-hr 3 100yr Rainfall=7.28"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 4HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1X: EXISTING SITE Runoff = 12.02 cfs @ 12.18 hrs, Volume= 0.671 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 100yr Rainfall=7.28" Area (sf) CN Description 83,748 69 50-75% Grass cover, Fair, HSG B * 3,345 98 DRIVEWAY * 1,900 98 HOUSE/GARAGE 88,993 Weighted Average 83,748 94.11% Pervious Area 5,245 5.89% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1X: EXISTING SITE Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 MSE 24-hr 3 100yr Rainfall=7.28" Runoff Area=88,993 sf Runoff Volume=0.671 af Runoff Depth=3.94" Tc=10.0 min CN=WQ 12.02 cfs 9 3 0 93 5 940940940 94594592 9 9 3 1 93293 3 93 4 9 3 6 93 7 93 8 93 9 941941942942943943944944946946947 947948948945 950 944 94 6 947 948 949 935940945945931932933934936937938939941942943944946946947947 9 3 0 935 931 932 933 934 936 937 938 939941942 945941942943944946 935 935 940932 933 933 933 934 934 934 9369379389399 41 9419429429439439409459459 3 7 9 3 8 9 3 9 941942943 9439449449409459399419429439449469469 4 7 947948948800 BROWN ROAD 920 BROWN ROAD 930 BROWN ROADBROWN ROAD (CO RD 146)N 0 20'40' 2 1 PLOTTED:COMM. NO. DRAWING NO. ----16628 TANAGER CREEK 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 01/14/2022 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 860 BROWN ROAD ORONO, MN ETHAN DE NARAY PRELIMINARY PLAT 1 01/14/22 PRELIMINARY PLAT SUBMITTAL PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.01/14/2022 ADAM THIELE, PE 2 02/10/22 REVISED PER CITY COMMENTS 1S 2S 1P 1S WEST & STREET 2S EAST (LOTS 2&3) 3R TOTAL RUNOFF 1P FILTRATION BASIN Routing Diagram for 16628 SWMP Prepared by {enter your company name here}, Printed 2/10/2022 HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Subcat Reach Pond Link PROPOSED CONDITIONS 16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 2HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Area Listing (selected nodes) Area (acres) CN Description (subcatchment-numbers) 1.465 74 >75% Grass cover, Good, HSG C (1S, 2S) 0.370 98 HOUSE/DRIVE/STREET (1S) 0.202 98 HOUSE/DRIVEWAY (2S) 2.038 81 TOTAL AREA PROPOSED CONDITIONS 16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 3HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Soil Listing (selected nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 0.000 HSG B 1.465 HSG C 1S, 2S 0.000 HSG D 0.573 Other 1S, 2S 2.038 TOTAL AREA PROPOSED CONDITIONS 16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 4HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Ground Covers (selected nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 0.000 1.465 0.000 0.000 1.465 >75% Grass cover, Good 1S, 2S 0.000 0.000 0.000 0.000 0.370 0.370 HOUSE/DRIVE/STREET 1S 0.000 0.000 0.000 0.000 0.202 0.202 HOUSE/DRIVEWAY 2S 0.000 0.000 1.465 0.000 0.573 2.038 TOTAL AREA PROPOSED CONDITIONS MSE 24-hr 3 2yr Rainfall=2.86"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 5HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=56,471 sf 28.55% Impervious Runoff Depth=1.34"Subcatchment 1S: WEST & STREET Tc=10.0 min CN=WQ Runoff=2.39 cfs 0.144 af Runoff Area=32,300 sf 27.31% Impervious Runoff Depth=1.31"Subcatchment 2S: EAST (LOTS 2&3) Tc=10.0 min CN=WQ Runoff=1.35 cfs 0.081 af Inflow=1.43 cfs 0.226 afReach 3R: TOTAL RUNOFF Outflow=1.43 cfs 0.226 af Peak Elev=933.85' Storage=3,671 cf Inflow=2.39 cfs 0.144 afPond 1P: FILTRATION BASIN Outflow=0.09 cfs 0.144 af Total Runoff Area = 2.038 ac Runoff Volume = 0.226 af Average Runoff Depth = 1.33" 71.90% Pervious = 1.465 ac 28.10% Impervious = 0.573 ac PROPOSED CONDITIONS MSE 24-hr 3 2yr Rainfall=2.86"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 6HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: WEST & STREET Runoff = 2.39 cfs @ 12.18 hrs, Volume= 0.144 af, Depth= 1.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 2yr Rainfall=2.86" Area (sf) CN Description * 16,125 98 HOUSE/DRIVE/STREET 40,346 74 >75% Grass cover, Good, HSG C 56,471 Weighted Average 40,346 71.45% Pervious Area 16,125 28.55% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: WEST & STREET Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 MSE 24-hr 3 2yr Rainfall=2.86" Runoff Area=56,471 sf Runoff Volume=0.144 af Runoff Depth=1.34" Tc=10.0 min CN=WQ 2.39 cfs PROPOSED CONDITIONS MSE 24-hr 3 2yr Rainfall=2.86"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 7HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: EAST (LOTS 2&3) Runoff = 1.35 cfs @ 12.18 hrs, Volume= 0.081 af, Depth= 1.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 2yr Rainfall=2.86" Area (sf) CN Description * 8,820 98 HOUSE/DRIVEWAY 23,480 74 >75% Grass cover, Good, HSG C 32,300 Weighted Average 23,480 72.69% Pervious Area 8,820 27.31% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: EAST (LOTS 2&3) Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 MSE 24-hr 3 2yr Rainfall=2.86" Runoff Area=32,300 sf Runoff Volume=0.081 af Runoff Depth=1.31" Tc=10.0 min CN=WQ 1.35 cfs PROPOSED CONDITIONS MSE 24-hr 3 2yr Rainfall=2.86"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 8HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Reach 3R: TOTAL RUNOFF [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 2.038 ac, 28.10% Impervious, Inflow Depth = 1.33" for 2yr event Inflow = 1.43 cfs @ 12.18 hrs, Volume= 0.226 af Outflow = 1.43 cfs @ 12.18 hrs, Volume= 0.226 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 3R: TOTAL RUNOFF Inflow Outflow Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 Inflow Area=2.038 ac 1.43 cfs 1.43 cfs PROPOSED CONDITIONS MSE 24-hr 3 2yr Rainfall=2.86"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 9HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN Inflow Area = 1.296 ac, 28.55% Impervious, Inflow Depth = 1.34" for 2yr event Inflow = 2.39 cfs @ 12.18 hrs, Volume= 0.144 af Outflow = 0.09 cfs @ 14.30 hrs, Volume= 0.144 af, Atten= 96%, Lag= 127.2 min Primary = 0.09 cfs @ 14.30 hrs, Volume= 0.144 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 933.85' @ 14.30 hrs Surf.Area= 4,970 sf Storage= 3,671 cf Plug-Flow detention time= 401.7 min calculated for 0.144 af (100% of inflow) Center-of-Mass det. time= 401.7 min ( 1,194.3 - 792.6 ) Volume Invert Avail.Storage Storage Description #1 933.00' 10,400 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 933.00 3,700 0 0 935.00 6,700 10,400 10,400 Device Routing Invert Outlet Devices #1 Primary 933.00'0.800 in/hr Exfiltration over Surface area #2 Primary 934.00'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 5.00 11.00 Primary OutFlow Max=0.09 cfs @ 14.30 hrs HW=933.85' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.09 cfs) 2=Custom Weir/Orifice ( Controls 0.00 cfs) PROPOSED CONDITIONS MSE 24-hr 3 2yr Rainfall=2.86"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 10HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Pond 1P: FILTRATION BASIN Inflow Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Inflow Area=1.296 ac Peak Elev=933.85' Storage=3,671 cf 2.39 cfs 0.09 cfs PROPOSED CONDITIONS MSE 24-hr 3 10yr Rainfall=4.25"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 11HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=56,471 sf 28.55% Impervious Runoff Depth=2.42"Subcatchment 1S: WEST & STREET Tc=10.0 min CN=WQ Runoff=4.44 cfs 0.261 af Runoff Area=32,300 sf 27.31% Impervious Runoff Depth=2.39"Subcatchment 2S: EAST (LOTS 2&3) Tc=10.0 min CN=WQ Runoff=2.51 cfs 0.148 af Inflow=2.60 cfs 0.409 afReach 3R: TOTAL RUNOFF Outflow=2.60 cfs 0.409 af Peak Elev=934.15' Storage=5,269 cf Inflow=4.44 cfs 0.261 afPond 1P: FILTRATION BASIN Outflow=1.17 cfs 0.261 af Total Runoff Area = 2.038 ac Runoff Volume = 0.409 af Average Runoff Depth = 2.41" 71.90% Pervious = 1.465 ac 28.10% Impervious = 0.573 ac PROPOSED CONDITIONS MSE 24-hr 3 10yr Rainfall=4.25"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 12HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: WEST & STREET Runoff = 4.44 cfs @ 12.18 hrs, Volume= 0.261 af, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 10yr Rainfall=4.25" Area (sf) CN Description * 16,125 98 HOUSE/DRIVE/STREET 40,346 74 >75% Grass cover, Good, HSG C 56,471 Weighted Average 40,346 71.45% Pervious Area 16,125 28.55% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: WEST & STREET Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 MSE 24-hr 3 10yr Rainfall=4.25" Runoff Area=56,471 sf Runoff Volume=0.261 af Runoff Depth=2.42" Tc=10.0 min CN=WQ 4.44 cfs PROPOSED CONDITIONS MSE 24-hr 3 10yr Rainfall=4.25"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 13HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: EAST (LOTS 2&3) Runoff = 2.51 cfs @ 12.18 hrs, Volume= 0.148 af, Depth= 2.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 10yr Rainfall=4.25" Area (sf) CN Description * 8,820 98 HOUSE/DRIVEWAY 23,480 74 >75% Grass cover, Good, HSG C 32,300 Weighted Average 23,480 72.69% Pervious Area 8,820 27.31% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: EAST (LOTS 2&3) Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 MSE 24-hr 3 10yr Rainfall=4.25" Runoff Area=32,300 sf Runoff Volume=0.148 af Runoff Depth=2.39" Tc=10.0 min CN=WQ 2.51 cfs PROPOSED CONDITIONS MSE 24-hr 3 10yr Rainfall=4.25"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 14HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Reach 3R: TOTAL RUNOFF [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 2.038 ac, 28.10% Impervious, Inflow Depth = 2.41" for 10yr event Inflow = 2.60 cfs @ 12.18 hrs, Volume= 0.409 af Outflow = 2.60 cfs @ 12.18 hrs, Volume= 0.409 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 3R: TOTAL RUNOFF Inflow Outflow Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Inflow Area=2.038 ac 2.60 cfs 2.60 cfs PROPOSED CONDITIONS MSE 24-hr 3 10yr Rainfall=4.25"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 15HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN Inflow Area = 1.296 ac, 28.55% Impervious, Inflow Depth = 2.42" for 10yr event Inflow = 4.44 cfs @ 12.18 hrs, Volume= 0.261 af Outflow = 1.17 cfs @ 12.49 hrs, Volume= 0.261 af, Atten= 74%, Lag= 18.7 min Primary = 1.17 cfs @ 12.49 hrs, Volume= 0.261 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 934.15' @ 12.49 hrs Surf.Area= 5,431 sf Storage= 5,269 cf Plug-Flow detention time= 355.6 min calculated for 0.261 af (100% of inflow) Center-of-Mass det. time= 356.0 min ( 1,143.4 - 787.5 ) Volume Invert Avail.Storage Storage Description #1 933.00' 10,400 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 933.00 3,700 0 0 935.00 6,700 10,400 10,400 Device Routing Invert Outlet Devices #1 Primary 933.00'0.800 in/hr Exfiltration over Surface area #2 Primary 934.00'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 5.00 11.00 Primary OutFlow Max=1.16 cfs @ 12.49 hrs HW=934.15' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.10 cfs) 2=Custom Weir/Orifice (Weir Controls 1.06 cfs @ 1.26 fps) PROPOSED CONDITIONS MSE 24-hr 3 10yr Rainfall=4.25"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 16HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Pond 1P: FILTRATION BASIN Inflow Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 Inflow Area=1.296 ac Peak Elev=934.15' Storage=5,269 cf 4.44 cfs 1.17 cfs PROPOSED CONDITIONS MSE 24-hr 3 100yr Rainfall=7.28"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 17HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=56,471 sf 28.55% Impervious Runoff Depth=5.07"Subcatchment 1S: WEST & STREET Tc=10.0 min CN=WQ Runoff=9.37 cfs 0.548 af Runoff Area=32,300 sf 27.31% Impervious Runoff Depth=5.04"Subcatchment 2S: EAST (LOTS 2&3) Tc=10.0 min CN=WQ Runoff=5.33 cfs 0.311 af Inflow=12.03 cfs 0.859 afReach 3R: TOTAL RUNOFF Outflow=12.03 cfs 0.859 af Peak Elev=934.51' Storage=7,272 cf Inflow=9.37 cfs 0.548 afPond 1P: FILTRATION BASIN Outflow=7.43 cfs 0.548 af Total Runoff Area = 2.038 ac Runoff Volume = 0.859 af Average Runoff Depth = 5.06" 71.90% Pervious = 1.465 ac 28.10% Impervious = 0.573 ac PROPOSED CONDITIONS MSE 24-hr 3 100yr Rainfall=7.28"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 18HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: WEST & STREET Runoff = 9.37 cfs @ 12.17 hrs, Volume= 0.548 af, Depth= 5.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 100yr Rainfall=7.28" Area (sf) CN Description * 16,125 98 HOUSE/DRIVE/STREET 40,346 74 >75% Grass cover, Good, HSG C 56,471 Weighted Average 40,346 71.45% Pervious Area 16,125 28.55% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: WEST & STREET Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 MSE 24-hr 3 100yr Rainfall=7.28" Runoff Area=56,471 sf Runoff Volume=0.548 af Runoff Depth=5.07" Tc=10.0 min CN=WQ 9.37 cfs PROPOSED CONDITIONS MSE 24-hr 3 100yr Rainfall=7.28"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 19HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: EAST (LOTS 2&3) Runoff = 5.33 cfs @ 12.17 hrs, Volume= 0.311 af, Depth= 5.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs MSE 24-hr 3 100yr Rainfall=7.28" Area (sf) CN Description * 8,820 98 HOUSE/DRIVEWAY 23,480 74 >75% Grass cover, Good, HSG C 32,300 Weighted Average 23,480 72.69% Pervious Area 8,820 27.31% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: EAST (LOTS 2&3) Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 MSE 24-hr 3 100yr Rainfall=7.28" Runoff Area=32,300 sf Runoff Volume=0.311 af Runoff Depth=5.04" Tc=10.0 min CN=WQ 5.33 cfs PROPOSED CONDITIONS MSE 24-hr 3 100yr Rainfall=7.28"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 20HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Reach 3R: TOTAL RUNOFF [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 2.038 ac, 28.10% Impervious, Inflow Depth = 5.06" for 100yr event Inflow = 12.03 cfs @ 12.22 hrs, Volume= 0.859 af Outflow = 12.03 cfs @ 12.22 hrs, Volume= 0.859 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 3R: TOTAL RUNOFF Inflow Outflow Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=2.038 ac 12.03 cfs 12.03 cfs PROPOSED CONDITIONS MSE 24-hr 3 100yr Rainfall=7.28"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 21HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN Inflow Area = 1.296 ac, 28.55% Impervious, Inflow Depth = 5.07" for 100yr event Inflow = 9.37 cfs @ 12.17 hrs, Volume= 0.548 af Outflow = 7.43 cfs @ 12.25 hrs, Volume= 0.548 af, Atten= 21%, Lag= 4.6 min Primary = 7.43 cfs @ 12.25 hrs, Volume= 0.548 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 934.51' @ 12.25 hrs Surf.Area= 5,959 sf Storage= 7,272 cf Plug-Flow detention time= 209.1 min calculated for 0.548 af (100% of inflow) Center-of-Mass det. time= 208.9 min ( 988.1 - 779.2 ) Volume Invert Avail.Storage Storage Description #1 933.00' 10,400 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 933.00 3,700 0 0 935.00 6,700 10,400 10,400 Device Routing Invert Outlet Devices #1 Primary 933.00'0.800 in/hr Exfiltration over Surface area #2 Primary 934.00'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 5.00 11.00 Primary OutFlow Max=7.42 cfs @ 12.25 hrs HW=934.51' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.11 cfs) 2=Custom Weir/Orifice (Weir Controls 7.31 cfs @ 2.22 fps) PROPOSED CONDITIONS MSE 24-hr 3 100yr Rainfall=7.28"16628 SWMP Printed 2/10/2022Prepared by {enter your company name here} Page 22HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC Pond 1P: FILTRATION BASIN Inflow Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Inflow Area=1.296 ac Peak Elev=934.51' Storage=7,272 cf 9.37 cfs 7.43 cfs