HomeMy WebLinkAbout1990-08-16 On Site Sewage Treatment Inspection ReportOn the North Sbore of
Lake Minnetonka
ON -SITE SEWAGE TREATMENT
INSPECTION REPORT POST OFFICE BOX 66
1335 S. Brown Rd.
Crystal Bay, MN M23
473-7357
OWNER tan .4, /Uylte I ADDRESS 1� Lille
- �1
PERMIT NO.-S. DATES T�� y CONTRACTORS n
City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sews¢
beetrnemt system at the above addoss has been inspected and appears to fall into the category checked below.
(This is 10 an existing system ❑ new construction)
Meets or exceeds current City standards in NI respects relating to design, construction, and location. Appears to be operating
properly.
2 Does not most all current City standards tot new construction 11978 Code) but in most respects appears to be designed,
located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no rasinr
upgrading of the system is required at this time.
3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating
adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at
this time.
4 System may or may not meet current ndards for design, construction or location, but is failing to properly treat and
dispose of the current input, and is r "a+ t,s•sg a water supply, or is a source of pollution to surface or groundwaters, or is
creating a safety hazard, or is otherN g a public nuisance. Plesee contact the City Inspector to discuss system repair/
replacement procedures. 1f drainf geld . ,nt is necessary, soil testing will usually be required, and a design and site plan
must be submittee `or review. Your coin, . -.•ust obtain a permit before work is started.
SYSTEM CONDITION (0 Chocked items may require your acti.tn)
T k inspection indicate:
A Pumpout not neoded at this time.
❑ Solids accumuletion in tanks indicate they should be pump -
ad out this Wow to help prevent future problems.
❑ Sofia accumulation in tanks is at a critical level. Tanks
dwuld be pun out es goon a possible.
❑ System is discharging to surface. Tanks must be pumped
within 48 hours to eliminate surface discharge.
❑ Inspection riven missing --tanks could not be inspected.
Inspection rives 14" dia, pipe) must be installed in each tank
et next pumpout. If tanks hove not been pumped out within
the last three yews, they should be pumped out now.
SITE CHARACTERISTICS:
Limiting Site! Factors
❑ Slope
❑ Soil
❑ High water table
❑ Lot size
❑ Lake, wetland, or stream
❑ Drainage
COMMENTS
Date of Inspection
❑ Inspection pipe is located directly over tank baffle. (Does not
give accurate measuremaM of solids accumulation.) If tanks
have not been pumped out within the last three yews, they
should be pumped out now.
Drainfierld inspection indicate:
Droinfield n dig, no surfacing ov+dant.
❑ Some evidence of surfacing, not critical yet.
❑ :' •-nfi*ld is saturated and visibly discharging untreated
effluent to the surfaca. This condition may require replace-
ment or additions to dainfield. Contact the City Inspector
immediately. Repairs must be completed within 90 dogs.
❑ Drainfield extent and condition unknown.
Potential for System Failure
Site Capabilities for
Idepends on soil types, water
Future Expansion
table, and system condition)
❑ Adequate
❑ Luw
J&Fair
® Medium
❑ Poor
❑ H-gh
❑ Inadequate
❑ System is causing visible
surface discharge.
ptic System Inspector
Note In the event that this inspection report is useu to satisfy the requirements for a mortgage or other transfer of property, be advised that
this report does not guarantee or certify that an existing system will continue to function prAWrly, but is merely an opinion of the adequacy
of the system under current conditions base(: on the available information
This report must be kept on the premises with system location and pumping records
WHITE COPY r Inspector's File GOLD COPY r Homeowner