HomeMy WebLinkAbout1994-04-16 On Site Sewage Treatment Inspection ReportCITY OF ORONO
Municipal Offices
Post Office Box 66
Crystal Bay, MN 55323-0066
ON —SITE SEWAGE TREATMM
INSPECTION REPORT
T L�����
Owner: il�rP/i?✓ / Pt'1'% � --,, Address: ,,, /
Permit #'s: ' Dates: �<A4-9 Z Contractors:
City ordinance number 100 requires that each on -site sewage treatment system in Orono be inspected on a regular basis.
The on -site sewage treatment system at the above address has been inspected and appears to fall into the category
checked below.
(This is I� an existing system I I new construction)
"CODE SYSTEM" -A system which meets all the location, design, and co-struction standards of the current City
Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input
without discharging any pollutants into ground or surface waters.
"CONFORMING SYSTEM" -A system which does not meet all the location, design, and construction standards of the
current City Codes, but was installed according to the code in effect at the time of installation, and which
is operating satisfactorily by treating and disposing of the entire current sewage input without discharging
any pollutants into ground or surface waters.
"NON- CONFORMING SYSTEM" -A prohibited system; a system located within a designated 100-year floodplain; any
system which may or may not meet all the location, design, and construction standards of the current City
Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand
between the distr'>xition device and the limiting soil characteristics.
(The limiting s;)il characteristic I ) has or A has not been identified at this time. If the limiting soil
characteristic has not been identified, this classification may be subject to revision.)
TANK CONDITION (5-10)-
Tank inspection indicates:
5 Puirpout not needed at this time.
6 Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems.
7 Solids accumulation in tanks is at a critica, level. Tanks should be pumped out as soon as possible.
Qp System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge.
9V Inspection risers missing -tanks could not be inspected. Inspection risers (4" dia. ipe) must be installed in each
tank at next purpout. If tanks hay. not been - Z-2Ti�y sneuie
b—ormw.
10 InspeclSTpe is located direct over tank baffle (does not give accurate measurement of solids accumulation).
I f tanks bay�ot beebee YiihilL three veers thev shoulef nur�� out now.
a�.—
D ifield inspection indicates:
Di
Drainfield is dry, no surfacing evident.
Some evidence of surfacing, not critical yet.
13 Drainfield is saturated and visibly discharging untreated effluent :o the surface. Contact the Citv Inspector
immediately. Repairs must be completed within 90 days.
14 Drainfield extent and condition unknown.
LIMITING SITE FACTORS (slope.setbacks.etc.):
POTENTIAL FOR SYSTEM FAILURE (depends on soils water
COMMENTS: �k Tl o ink � # S'- fin
Date o
inspection
is System Inspector
Note: In the event that this inspection report is used to satisfy the reouirements for a mortgage ur other transfer of
property, be advised that this report does not guarantee or certify that an existing system will continue to function
properly but is merely an opinion of the adequacy of the system under current conditions based on the available
i nforalet i on.
This report must be kept on the premises with the system location and pumping records.
WHITE COPY Inspectors Rio YELLOW COPY Homeowner