Loading...
HomeMy WebLinkAboutSeptic System Sketch PlanFORM A VILLAGE OF ORONO PERMIT NO. RECEIPT NO. -- CRYSTAL BAY, MINNESOTA Contractor's Name—��2L'L--- Contractor's Address_ LL_ _1 Owner's Name— O f Alp) 4 An AlOwner's Address 4' g S ' L rCP DRAWING NO.1 SEPTIC TANKS DISTRIBUTION BOA \ DISTANCE BETWEEN WELL AND SEPTIC \ \ TANK ON ADJOINING PROPERTY i� WELL \� ♦ DISTANCE BETWEEN SEPTIC TANK ♦ \ i AND WELL ON ADJOINING PROPERTY SUILDINS \ `DISTANCE BETWEEN WELL \ AND SEPTIC TANK ♦Q DISTRII BOX SEPTIC TANKS DRAWING NO.2 \� R _'X BUILDING SEPTTA-AK9 DIRECTION OF FLOW OF SYSTEM FROM HOUSE / NORTH O SOUTH C3 EAST O WEST x �Q goo IF �1 ("I>; -,- The following information shall be f hed in a above drawings as referred to in Section 20, paragraph 45 of the Village of Orono Building Ordinance. 1. All distances, in feet, shall be plainly marked on Drawing No. 1. 2. Measurements shall be taken from the two farthest corners of the building where a straight line can be obtained to the cleanouts of the first and second septic tanks and to the distribution box. Mark these distances, in feet, on Drawing No. 2. 3. Indicate approximate well location with the letter "W" or. Drawing No. 2. 4. Check direction of sewage or waste disposal system as shown on Drawing No. 2.