HomeMy WebLinkAboutSeptic System Sketch PlanFORM A
VILLAGE OF ORONO PERMIT NO.
RECEIPT NO. --
CRYSTAL BAY, MINNESOTA
Contractor's Name—��2L'L---
Contractor's Address_ LL_ _1
Owner's Name— O f Alp) 4 An
AlOwner's Address 4' g S ' L rCP
DRAWING NO.1
SEPTIC TANKS
DISTRIBUTION BOA
\ DISTANCE BETWEEN WELL AND SEPTIC
\
\ TANK ON ADJOINING PROPERTY
i�
WELL \�
♦ DISTANCE BETWEEN SEPTIC TANK
♦ \ i AND WELL ON ADJOINING PROPERTY
SUILDINS
\ `DISTANCE BETWEEN WELL
\ AND SEPTIC TANK
♦Q DISTRII
BOX
SEPTIC TANKS
DRAWING NO.2
\� R
_'X
BUILDING SEPTTA-AK9
DIRECTION OF FLOW OF SYSTEM
FROM HOUSE
/ NORTH O
SOUTH C3
EAST O
WEST x �Q
goo IF �1 ("I>; -,-
The following information shall be f hed in a above drawings as referred to in Section 20, paragraph 45 of
the Village of Orono Building Ordinance.
1. All distances, in feet, shall be plainly marked on Drawing No. 1.
2. Measurements shall be taken from the two farthest corners of the building where a straight line can be
obtained to the cleanouts of the first and second septic tanks and to the distribution box. Mark these
distances, in feet, on Drawing No. 2.
3. Indicate approximate well location with the letter "W" or. Drawing No. 2.
4. Check direction of sewage or waste disposal system as shown on Drawing No. 2.