HomeMy WebLinkAbout1986-10-24 Insp Notice, Plumbing Rough In�1 T TIME
CITY OF ORONO CALLED IN
INSPECTION N TICE SCHEDULED
PERMIT NO. t' COMPLETED
ADDRESS
OWNER ► CONTR.
TELEPHONE NO.
"
" FOOTING
PLUMBING RI
G
SITE INSPECTION
FRAMING
PLUMBING FINAL
3
EXCAV:GRADING/FILLING
INSULATION
O
MECHANICAL
G
LAKE"HOREJWETLANDS
_J WALL BD
O
WATER HOOKUP
❑
LICENSING
lV ;J FINAL
0
METER SET/TURN ON
0
COMPLAINT
G PROGRESS
0
SEWER HOOKUP
G
FOLLOW-UP
._, DEMOL
O
SEPTIC INSTALL
O
SEPTIC FINAL
Q G FIRE PREY
G
SEPTIC MAINT
O
FIREPLACEIWOOD BURNER
Z
a
WELL TEST PUMP
O
i COMMENTS:
ti
Q
�t4 L CU
Q
Z
O
h
J
0
c
O
ILL
Z
IA,
z
W
QC
a
w
cc
W 401ORK SATIS:ACTORY PROCEED C PHOTO TAKEN
CORRECT WORK 6 PROCEED
V C CORRECT WORK CALL FOR REINSPECTION BEFORE COVERING
'J CORRECT UNSAFE CONDITION WITHIN HOURS INSPECTOR WILL RETURN
'_' STOP ORDER POSTED CALL INSPECTOR
INSPECTION REQUIRED CALL TO ARRANGE ACCESS
call for the next inspection 24 hours in advance.
Ownw/Contr. on site
Inspector
Mhth /inspector's File Canary /bite Ncaice