Loading...
HomeMy WebLinkAbout8-14-19 Email Southways DevelopmentFrom:Mark Perry To:Christine Mattson; Bob Bean Cc:Art Taylor Subject:Southways Development Date:Thursday, August 15, 2019 8:26:04 AM Attachments:Southway-Construction_stormwater_inspection_checklist_081419.docx Southways_InspectionNotes_081419.pdf Christine, Art Taylor is in touch with the contractor on this one and has my report. I met with the caretaker on site. The entire site is seeded according to the caretaker. The pond slopes are now blanketed and the road edges are blanketed or gravel so these areas are stable. The majority of the site is still no stable. The caretaker believes that the contractor would have blanketed the entire site if he knew that it all needed to be covered. The perimeter control has been restored where it was down and inlet protection has been installed by the lift station. They simply need to cover the remaining exposed soil – either straw mulch, hydro mulch (bonded fiber matrix or fiber reinforced matrix), or erosion control blanket. The homeowner across the road, just north of the Pillsbury estate, is tracking quite a bit of sediment on the road. I don’t know if they are doing permitted work or if it is a “private project” but I wanted to let you know in case a follow up contact was appropriate. Let me know if you have questions. Mark L Perry Wetland Specialist Bolton & Menk, Inc. 2638 Shadow Lane Suite 200 Chaska, MN 55318-1172 Phone: 952-448-8838 ext. 2741 Mobile: 612-756-3795 Bolton-Menk.com ______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________