Loading...
HomeMy WebLinkAboutOrd 320 Fee Schedule 2026City of Orono 2026 FEE SCHEDULE Ordinance 318 Adopted February 9, 2026 Effective January 1, 2026 A. Documents and Services E. Administrative Offenses Zoning Documents Traffic/ Vehicle Offenses General Administrative Documents Snowmobile Violations Election Public Nuisances Data Requests Open Burning Miscellaneous Charges Noise Park Violations B. Building, Planning, and Zoning Sign Violations Zoning Applications Juvenile Zoning Permits Seasonal Overweight Vehicles Building Code Administration Parking Fire Tobacco Use Violation Park Dedication Special Events Violations Stormwater and Drainage Trunk Fees Miscellaneous C. Licenses and Other Permits F. Park Fees Dock License Golf Course Fees Home Occupation License Lurton Park Passes Temporary Trailers and Buildings Permit Summit Beach Rental Home License Field/Facility Reservations Waste Hauler License Kennel License G. Public Safety Alcohol Sales License Dogs at Large Release Fee Tobacco Sales License Care of Impounded Animal Gambling Permit Large Assembly License Massage Sales License Firearms Discharge Permit Sales License Limited Trapping Permit Amusement Device License Special Events Permit False Police Alarm User Fees D. Utility Rates and Fees False Fire Alarm User Fees Municipal Connection Permit Fingerprinting Service Point of Sale Fees Police Special Services Sewer Projects Copy Service - Police Records Water Connections Photos Water Meter and Horn Video Sewer and Water Unit Adjustment Charges Audio Municipal Water Rates Signs: "No Parking Order of Police" Sewer Service Fees Statements Stormwater Utility Rates Firearm Storage Fees Recycling Charge Sump Pump Surcharge H. Brush Site Public Works Supplies & Services Brush Site Fees Table of Contents Fee Applicable Code or MN State Statute (MSS) Number Municipal Code Book - Portions On-Line Free Ch 6.12 only (Zoning Code) w/revisions $0.25 per page Ch 6.20 only (Subdiv. Code) w/revisions $0.25 per page Other Individual Chapters $0.25 per page Building & Planning Publications Listing Information $10.00 Assessment Search - Written (Verbal searches not given) Fax Charge Reprint of Oversized Documents that have been microfilmed Surcharge for Staff Expense in Excess of Regular Fees Professional Time Administrative Time Building/Legal/Engineering Consultants Copies/Mileage/Postage/Etc. Discretionary Courtesy Customer Service Copy/Print (not public data request) Paper (8.5" x 11")$0.25 per single sided page plus staff time ($5.00 minimum) Oversized Paper (Plotter Prints)$5.00 per single sided page plus staff time ($10.00 minimum) Candidate Filing Fee $15.00 MS 13.03 Subd 3 Staff time (for search, retrieval, copy, and transmit)$30/hour actual cost Paper (8.5" x 11")$0.25 per single sided page plus staff time ($5.00 minimum) Oversized Paper (Plotter Prints)$5.00 per single sided page plus staff time ($10.00 minimum) Storage Device $10 or actual cost plus staff time MISCELLANEOUS FEES Convenience Fee - Credit Card Transactions 3%+ $0.50 for $100.00 or less Returned Check $30.00 No charge up to 6 pages; $.25 Each Additional page Exhibit A. Documents and Services ZONING DEPARTMENT DOCUMENTS As Posted - Prices subject to Change GENERAL ADMINISTRATIVE DOCUMENTS $20.00 Per Parcel ELECTION Actual Cost DATA REQUESTS $ 40.00 Per Hour Actual Billed Cost Actual Cost $ 60.00 Per Hour Fee Escrow Notes Variance $550.00 $700.00 + Consultant fees 1st Extension $75.00 Staff approved 2nd and subsequent $200.00 City Council meeting Conditional Use Permit $550.00 $700.00 + Consultant fees CUP amendment $550.00 $700.00 + Consultant fees 1st Extension $75.00 Staff approved Interim Use Permit $550.00 $700.00 + Consultant fees Site Plan Review $550.00 $700.00 + Consultant fees Zoning Amendments including map amendments $550.00 $700.00 + Consultant fees Concept Review $550.00 Comprehensive Plan Amendment $550.00 $700.00 + Consultant fees Subdivision Subdivision: Sketch Plan $550.00 Subdivision: Class III Prel Plat $800.00 $5,000.00 + Consultant fees Subdivision: Final Plat $800.00 $2,500.00 + Consultant fees Subdivision: Preliminary plat extension $550.00 Subdivision Exception $150.00 n/a + Consultant fees if Applicable Vacations Vacations: Road and Easement $550.00 $700.00 + Consultant fees Easement Creation $165.00 $700.00 + Consultant fees Appeal of Administrative Decision $165.00 $700.00 + Consultant fees Stairway to Lake $55.00 Structures not requiring a building permit $55.00 Plus Engineering Costs Encroachment Permit/ Agreement $200.00 Tree removal in shore setback No Charge Signs (Alteration of cabinent or raceway)$55.00 Sign Structure and Entrance Monuments Based on Value Table Vehicle Storage $55.00 Sec. 6.12.7820 Land Alteration $100.00 Tent/ Canopy Permits $55.00 *City Administrator may require an erosion control escrow for projects disturbing soils or tree replacement. $1,000.00 Variable depending on project scope, but not to exceed Zoning confirmation letter $55.00 Request for zoning confirmation letter Address Change Request by Owner $55.00 Exhibit B. Buillding, Planning, and Zoning PLANNING, BUILDING, ZONING All fees, unless otherwise noted, are application fees and are non-refundable after staff work has begun on the application. ZONING PERMITS: All after the fact applications are double fees. All applicants are responsible for actual costs incurred by the City by its' consultants in the review of the application. ZONING APPLICATIONS: BUILDING CODE ADMINISTRATION: Building Permits Based on Value Table Building permit fees (Building, Plumbing, Mechanical, unless otherwise noted) Based on 2024 Building Valuation Table Plan Review Fee 65% of Building Permit Fee Rereview Plan Fee Up to the cost of the Plan Review Fee Based on Building Offical Recommendation Minimum Fee $29.50 Moved-In Structure (not including foundation, interior remodel, etc.)$275.00 Pre-Move Inspection $165.00 Special investigation fee (work started without obtaining a permit – applies even if no permit is pulled) 100% of Building permit fee Manufactured Home Installation $275.00 plus State Surcharge and requires a regular building permit if also doing basement, foundation, garage or entryway, fees are based on sq. ft. State Table $275.00 $1,000.00 Valuation based on ICC 2024 Building Valuation tables Total Valuation Fee $1.00 to $500.00 $501.00 to $2,000.00 $2,001.00 to $25,000.00 $25,001.00 to $50,000.00 $50,001.00 to $100,000.00 $100,001.00 to $500,000.00 $500,001.00 to $1,000,000.00 $1,000,001.00 and up State Surcharge as required by State. Demolition Demolition: Principal structure $100.00 Demolition: Accessory structure/Septic system (Per unit fee)$50.00 City Engineer may require an erosion control escrow for projects disturbing soils. Not to Exceed $1,000.00 $6,636.65 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction thereof $28 for the first $500.00 plus $3.70 for each additional $100.00, or fraction thereof, to and including $2,000.00 $83.50 for the first $2,000.00 plus $16.55 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $464.15 for the first $25,000.00 plus $12 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $764.15 for the first $50,000.00 plus $8.45 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $1,186.64 for the first $100,000.00 plus $6.75 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $3,886.65 for the first $500,000.00 plus $5.50 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 Refunds: 80% of building permit fees on projects not yet started (within 90 days of permit issuance by municipality). No refund on plan review fees, state surcharge or maintenance permits $29.50 City Administrator may require an erosion control escrow for projects disturbing soils. Plumbing 1.25% of project value, based on valuation table n/a Backflow registration $10.00 Plumbing minimum $26.25 Mechanical (All Types) 1.25% of project value, based on valuation table n/a Mechanical Minimum $26.25 Tent/ Canopy $50.00 Septic Tank or Repair Permit $350.00 New or replacement Type I or Type III, Residential $750.00 New or replacement Advanced Septic System Residential $750.00 Plus additional actual costs up to 600.00 All Commercial $750.00 Plus additional actual costs up to 600.00 Subdivision site evaluation review $60.00 Per lot Inspection surcharge for RS zones (Big Island and Deering island) $30.00 plus cost of boat rental if transportation not provided. Reinspection fee $30.00 plus $60/ hour after 1st hour Site inspection without permit Actual costs Quarterly Septic Fee $11.25 Septic Late Fee 3% / Qtr Miscellaneous Projects Fences Based on Value Table Only required for fences above 7 feet. Temporary Certificate of Occupancy Escrow 3% of project value, not to exceed $10,000 Contractural Inspection Service Plan Review Charge Based on 2024 Building Valuation Table FIRE Fire Protection inspection Actual Cost Based on 2024 Building Valuation Table Fire Plan review fee 65% of permit fee Burning permits No Charge Reinspection $50.00 All fire suppression and alarm permits are based on value, and include a plan review fee and are subject to the state surcharge. PARK DEDICATION 0.1 acres of land per residential dwelling unit 0.1 acres for every acre of commercial or industrial zoned land, or 0.1 per every 14 expected employees, whichever is greater Cash contribution maximum Residential density of 3 units per acre or less: maximum 4 percent of the predeveloped value Residential density of 3.1- 8 units per acre: maximum 8 percent of the predeveloped value Residential density of 8.1 - 15 units per acre: maximum 12 percent of the predeveloped value Residential density of 15.1 units per acre or more: maximum 20 percent of the predeveloped value STORMWATER AND DRAINAGE TRUNK FEES Stormwater and Drainage Trunk fees as established by Subdivision III, Section 2.04.1230 of the City Code. NEW DEVELOPMENT LAND USE Per new lot, or new structure on previously vacant lot Per buildable acre $16,150.00 $8,060.00 $5,250.00 $3,025.00 $7,275.00 $8,490.00 $9,690.00 - acreage of stormwater ponding or similar improvements that provide additional treatment benefits beyond what is required to treat the stormwater runoff from the development site. - acreage of conservation easements resulting from Conservation Design process Commercial or Industrial Multi-family and High-Density Single Family Developments. Trunk fee shall be charged on a per-acre basis, except that the following acreages will not be subject to the trunk fee: - all wetland acreage up to the delineation line Single Family Residential 1/2 Acre Zone Multi Family Residential 4 Units/Acre or Less Multi Family Residential Greater than 4 Units/Acre Single Family Residential 5 Acre Zone Single Family Residential 2 Acre Zone Single Family Residential 1 Acre Zone Storm water trunk fees apply to new development and redevelopment of existing properties and provide funding for the storm water infrastructure necessary to serve the City. The trunk fee is based on the land use and acreage of the property being developed. An equivalency factor multiplier is assigned to each land use type, with a 2-acre residential lot considered as the standard in the City with an equivalency factor of 1.0. The table below lists the storm water trunk fees per acre for the various zoning districts and land uses in the City. Land Dedication Minimum Area - Developers shall be required to dedicate to the City for parks, playgrounds, trails, open spaces and other public purposes an amount of land proportional to the amount of land being developed and to the number of residential units or commercial industrial employment, as set forth in Section 6.20.950: Cash contribution is equal to the amount of land required In those instances where a cash contribution is to be made by the developer, in lieu of a conveyance or dedication of land, the cash contribution to be contributed shall be equivalent to the fair market value of the land to be dedicated. Where the anticipated park needs are greater than the number of acres to be developed, the city establishes a maximum park dedication maximum: Fee Applicable Code or MN State Statute (MSS) Number Sec. 4.04.130 $325.00 Per Year Big Island Dock License $6,000.00 Canoe Rack Rental $45.00 Per Slip $100.00 Initial Review Fee Sec. 4.04.310 & Sec. 6.12.6810 $30.00 Annual Review Fee $30.00 License Fee $120.00 2-year term Flat Rate $500.00 Ch. 5.2, Article III *Hauler to provide rate schedule for Orono customers (to be posted publicly). Sec. 5.28.610-750 Commercial $150.00 Residential $50.00 Minn Stat 340A Background Investigation (new establishment/owner)$500.00 Per License Ch. 4.16, Article II Liquor Off-Sale $150.00 On-Sale $5,000.00 <2000 sq ft Minn Stat 340A.404 $6,000.00 >2000 sq ft On-Sale Club $300.00 <200 members Minn Stat 340A.408 $500.00 201-500 members $650.00 501-1000 members On-Sale Temporary $300.00 Minn Stat 340A.404.10 Sunday $200.00 Wine On-Sale $2,000.00 Minn Stat 340A.404 Malt Off-Sale 3.2%$100.00 On-Sale 3.2%$300.00 1st Violation $500.00 Sec. 4.16.240 & Minn. Stat. 340A.503 & 340A.702 & 340A.905 2nd Violation $1,000.00 and 3-day license suspension 3rd Violation $2,000.00 and 2-week license suspension 4th Violation License revocation 5.12 Article II Background Investigation (new establishment/owner)$150.00 Tobacco Sales $250.00 Violations (license holder/owner/manager) within 36-month period Minn. Stat. 461.12 Subd. 2 1st Offense $300.00 2nd Offense $600.00 3rd Offense $1,000.00 and 7-day license suspension Employee of license holder (or individual age 21 and older)up to $50.00 or instructional program discretionary; Ord 316 / Sec. 5.12.155 $100.00 Minn. Stat 349.213 Ch. 4.20, Article II Ch. 4.12, Article II Initial Background Investigation (new establishment/owner/individual)$150.00 Establishment $200.00 Individual $100.00 Background Review (Solicitor/Transient Merchant/Peddler)$150.00 Ch. 4.08 Transient Merchant/Peddler License $100.00 Ch. 4.20, Article III Per Establishment (Annual)$100.00 + Machine fee Per Machine Fee $25.00 Each TOBACCO SALES LICENSE SALES MERCHANTS AMUSEMENT DEVICE LICENSE ALCOHOL SALES LICENSE KENNEL LICENSE MASSAGE SALES LICENSE GAMBLING PERMIT Exhibit C. Licenses and other Permits TRAILERS & BUILDING (TEMPORARY) PERMIT Violations (3 years immediately prior to date of most current violation) WASTE HAULER LICENSE RENTAL HOME LICENSE HOME OCCUPATION LICENSE (Level 2) DOCK LICENSE License fees shall be prorated on the basis of 1/12 for each calendar month or part of a month remaining in the then current license year. For licenses where the fee is less than $100.00, a minimum license fee equal to half the annual license fee shall be charged. Fee Applicable Code or MN State Statute (MSS) Number Sewer (Includes one inspection)$150.00 SAC (Sewer Availability Charge) (MCES)$2,485.00 Water (Includes one inspection)$150.00 Horn Quote Basis Additional Connection inspection (Water or Sewer) $100.00 Additional Disconnection inspection (Water or Sewer)$100.00 Residential - City Inspection $250.00 Residential - Private Inspection Review $100.00 Commercial $750.00 Non-Compliance Surcharge (90 days after inspection)$75.00 per month Connection to existing City Sewer System: $6,000 per unit Fee 2014 Green Trees 26,670.00$ 2015 Green Trees Extension 25,480.00$ 2025 Fox Street 11,020.00$ Connection to Sewer System in adjacent city Fee Connection to Long Lake Sewer System $1,900.00 or per current Long Lake Fee Schedule Connection to Wayzata Sewer System $1,050 or per current Wayzata Fee Schedule Connection to existing City Water Main $4,370 per unit *or 20% over adjacent city's fee schedule, whichever is greater of Connection to Wayzata Water System $2,470 or per current Wayzata Fee Schedule 5/8" (3/4"x7-1/2") meter with horn including sales tax Actual Cost 3/4" (3/4"x9") meter with horn including sales tax Actual Cost 1" meter with horn including sales tax Actual Cost Larger meter Actual Cost CHARGES CREDIT Exhibit D. Utility Rates and Fees Current Fee per Adjacent City $1,900.00 or per current Long Lake Fee Schedule MUNICIPAL CONNECTION PERMIT SEWER PROJECTS WATER CONNECTIONS Fee Connection to Long Lake Water System ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with providing water and wastewater utility services to new customers to avoid placing these costs on existing customers. The connection fee includes those portions of existing assets that will benefit new customers together with any anticipated future capital improvements constructed for the purpose of providing utility services to new customers. The connection charge applies to those properties not previously assessed for the associated utility project. POINT OF SALE SEWER SERVICE INFLOW & INFILTRATION INSPECTION FEES Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed) shall pay an amount equivalent to the assessment amount plus interest that residences were charged at the time of the project: WATER METER AND HORN WATER AND SEWER UNIT ADJUSTMENT CHARGES Charges shall result from either an intensification of an existing non-residential use or a new non-residential use that replaces a former use on a property located within an area already assessed and served by municipal sewer and water. Credit for previously assessed sewer or water units shall be applied against the total number of sewer and water units established for the new use. Residential Billing & Ready to Serve Charge $18.70/month Unconnected Property Charge $18.70/month Water Usage Rate Tier 1 (0-3,300 gal) $9.09 /1,000 gal Tier 2 (3,300 - 8,300 gal)$12.72/1,000 gal Tier 3 (>8,300)$19.07/1,000 gal Multi-Family Billing & Ready to Serve Charge per SAC Unit $18.70/month Unconnected Property Charge $18.70/month Water Usage Rate Tier 1 (0-8,300 gal)$9.09 /1,000 gal Tier 2 (8,300-33,300 gal)$12.72/1,000 gal Tier 3 (>33,300 gal)$19.07/1,000 gal Garage Condos Billing & Ready to Serve Charge per Unit $18.70/month Unconnected Property Charge $18.70/month Water Usage Rate Tier 1 (0-3,300 gal) $9.09/1,000 gal Tier 2 (3,300 - 8,300 gal)$12.72/1,000 gal Tier 3 (>8,300)$19.07/ 1,000 gal Commercial Billing & Ready to Serve Charge per SAC Unit $18.70/month Unconnected Property Charge $18.70/month Water Usage Rate Tier 1 (0-8,300 gal)$9.09 /1,000 gal Tier 2 (8,300-33,300 gal)$12.72/1,000 gal Tier 3 (>33,300 gal)$19.07/1,000 gal School Billing & Ready to Serve Charge per Meter $56.10/month Unconnected Property Charge $56.10/month Water Usage Rate Tier 1 (0-8,300 gal)$9.09 /1,000 gal Tier 2 (8,300-33,300 gal)$12.72/1,000 gal Tier 3 (>33,300 gal)$19.07/1,000 gal Federally Mandated Safe Drinking Water $3.81/quarter or $1.27/month Minn Stat 144.3831 Testing Program (Charged per service connection) $100.00 Bulk sale to Minnetonka Beach for Lafayette Ridge Area Processing Fee (Per Monthly Billing Cycle)$30.00 Plus Water Usage Rate $9.09/1,000 gal Bulk sale - All Others Processing Fee (Per Monthly Billing Cycle)$30.00 Plus Water Usage Rate $19.07/1,000 gal i.e. Fill swimming pool or watering sod. Water Turn-On $50.00 Water Turn-off $50.00 Water System Repair/Replacement if damage caused by property owner: Labor Current Labor Rate Parts - At Cost Actual Cost Contracted Services Actual Cost MUNICIPAL WATER SERVICE RATES Monthly Service Charge for Non-Functioning or Inaccessible Water Meter Sewer Rate Single Family Home: Per Connection $75.41 per month Garage Condos ($75.41/month minimum):$7.54/month per unit Plus By flow: $7.54/1,000 gallon plus All Other Metered ($75.41/month minimum): $7.54/month per SAC unit Plus By flow $7.54/1,000 gallon plusUnmetered$75.41/month per SAC unit Long Lake Service (Metered and/or Unmetered)(Consolidated with Wayzata Service below) Minimum Charge (10,000 Gallons or Less Water Usage)$75.41 per Month Plus Over 10,000 Gallons Water Usage, per 1,000 Gallons $7.54/1,000 gallon plus Long Lake and Wayzata Service Single Family Home (per connection) Minimum Charge (10,000 Gallons or Less Water Usage)$75.41 per Month Plus Over 10,000 Gallons Water Usage, per 1,000 Gallons $7.54/1,000 gallon plus All Other Metered Service ($75.41/month minimum): Minimum Charge (10,000 Gallons or Less Water Usage)$7.54/month per SAC unit Plus Over 10,000 Gallons Water Usage, per 1,000 Gallons $7.54/1,000 gallon plus Unmetered Service Per Property $75.41 per Month Single Family Home: $16.81/month or $50.43/quarter Garage Condo:$16.81/Month/Unit or $50.43/Quarter/Unit All Other:$16.81/month/SAC Unit or $50.43/quarter/SAC Unit $6.96/month or $20.89/quarter Minn. Stat. § 115A.93, subd. 3c Recycling Cart from Waste Management No Charge $100.00 per month Right of Way Permit $150.00/permit Right of Way Escrow (for other than Public Utility) $1,500 New Street Intersections (See zoning section - Special improvement fees) On-Call Service to Other Cities Base On-Call Fee $70.00/day Call-Out Fee Actual wage and equipment rates Penalty for late payment of utility bills - 1% monthly if not paid by due date (applied to the total unpaid balance). Interest at 8% on unpaid utility and accounts receivable bills upon certification to the County. Assessment Charge for Unpaid Accounts Certified $30.00 Special Assessment Certification Fee subject to County rates. OTHER CHARGES SUMP PUMP SURCHARGE RECYCLING CHARGE STORM WATER UTILITY RATES PUBLIC WORKS SUPPLIES & SERVICES The basic intent of storm water regulations is to minimize the impact of development on natural drainage systems. Any development in an area will change the natural conditions by increasing the total volume of runoff and the level of pollutant loading. The storm water utility provides dedicated funds to operate, maintain, manage, construct or reconstruct the municipal storm water drainage system. Residential properties will be charged one residential unit fee for each residential unit on the property. Non-residential properties will be charged the appropriate number of residential unit fees based on the “Residential Equivalent Factor” for the property. Some Properties on Mytlewood and Old Long Lake Road are not connected to water. Wayzata bills Orono based on a quarterly usage of 25,000 gallons. Charge is based on the metered rates and 25,000 gallons. SEWER SERVICE FEES Fee Applicable Code or MN State Statute (MSS) Number Unsafe Operation $60.00 Sec. 5.32.930 Unreasonable Acceleration $60.00 Sec. 5.32.920 Exhibition Driving $60.00 Sec. 5.32.070 Failure to Obey Traffic Control $60.00 Minn. Stat. § 169.06 Expired Registration $60.00 Minn. Stat. § 169.79 Unsafe Equipment $60.00 Minn. Stat. § 169.47 Loud Exhaust $60.00 Minn. Stat. § 169.69 No Driver License in Possession $60.00 Minn. Stat. § 171.08 Failure to Change Address on DL $60.00 Minn. Stat. § 171.11 Driving to Avoid Traffic Signal $60.00 Sec. 5.32.050 Operation $60.00 Sec. 5.32.540 Equipment $60.00 Sec. 5.32.550 Hours of Operation $60.00 Sec. 5.32.540 Dog at Large $60.00 Sec. 5.28.440 Feces Clean Up $60.00 Sec. 5.28.450, 3.08.300, 3.08.370 & 3.08.440 Barking Dog $60.00 Sec. 5.28.100 Public Nuisance/General Prohibition $60.00 Sec. 5.36.040 Peace and Safety Violation $60.00 Sec. 5.36.710 Discharge of Firearm $60.00 Sec. 5.36.320 No Permit $60.00 Sec. 5.24.1210 Negligent Burning $60.00 Sec. 5.24.1280 No Open Burning $60.00 Sec. 5.24.1280 Loud Noise Prohibited $60.00 Sec. 5.24.1050 Exhibit E. Administrative Offenses TRAFFIC/VEHICLE OFFENSES SNOWMOBILE VIOLATIONS ANIMALS ADMINISTRATIVE OFFENSES (POLICE ADMINISTERED) PUBLIC NUISANCES OPEN BURNING NOISE Hours of Operation $60.00 Sec. 3.08.240 Operating a Motor Vehicle within Park $60.00 Sec. 3.08.270 No Permit $60.00 Sec. 3.08.370 Feces Clean Up $60.00 Sec. 3.08.300, 3.08.370 & 3.08.440 Violation of General Provisions $60.00 Sec. 3.04.040 Sign Impoundment Fee $25.00 Sec. 6.12.7190 Curfew $60.00 Sec. 5.36.1140 Possession of Tobacco $60.00 609.685 Sub 3 MSS 1,000-9,999 lbs overweight .15 cents per lb over 169.824 Sub 1 MSS General $25.00 Sec. 5.32.230 Seasonal 0200-0600 on Prohibited Streets $25.00 Sec. 5.32.250 Disabled Persons Spaces $60.00 Sec. 5.32.300 & Minn. Stats. § 169.346 Fire Lane $25.00 Sec. 5.08.350 TOBACCO USE VIOLATION Penalty for Use Where Prohibited $100.00 Sec. 5.16.050 SPECIAL EVENT VIOLATIONS 1st Violation $250.00 2nd Violation $500.00 3rd Violation $1,000.00 Watering Restrictions $60.00 610.50 Sub 15 MSS Placing Snow on Street $25.00 Sec. 3.04.060 JUVENILE SEASONAL OVERWEIGHT VEHICLES PARKING MISCELLANEOUS PARK VIOLATIONS SIGN VIOLATIONS Fee MONDAY THRU SUNDAY RATES Individual (Regular)$20.00 Juniors (10-18 years old)$12.00 Seniors (62 years or older)$16.00 Second Round $10.00 Children under 10 golf free with an adult Base Resident Individual Season Pass $600.00 $500.00 Junior Season Pass (10 - 18 years old)$300.00 $250.00 Senior Season Pass (62 years or older)$500.00 $400.00 Family* Season Pass $750.00 $600.00 GOLF CART RENTAL RATES Motorized Cart Rental/Per Person for 9 holes $11.00 Motorized Cart Rental/Per Person for 18 holes $15.00 Pull Carts/Per Round $5.00 Golf Clubs/Per Round $5.00 CONCESSION RATES As Posted Resident $40.00 Non-Resident $55.00 Admin Fine - No Permit See Admin Fines Passes will go on sale for the following year on Nov 1st. Passes to be prorated at 50% on August 1st. Exhibit F. Park Fees * Family meaning: Immediate family living in the same household. Children must be 18 years old or younger. LURTON PARK PASSES The cost to cover replacement passes will be $5.00 SEASON PASS RATES (Unlimited Non-League Play) The administrative fine will be enforced on vehicles that do not display a current parking pass. The fee will be waived with proof of a current parking pass. Payment of the fine will qualify as payment to obtain a permit. Parks and Facilities Director shall have the authority to deviate from these prices for the purpose of promoting specials and for special events. GOLF COURSE FEES SUMMIT BEACH CANOE RACK RENTAL See Licenses and Miscellaneous Charges FIELD/FACILITY RESERVATIONS PARK FACILITY USE PERMIT Resident (Individual, business or group)$15.00 Non-Resident (Individual, business or group)$25.00 Golf Course Club House $40.00 / Hour Fee Applicable Code or MN State Statute (MSS) Number Sec. 5.28.440 1st Offense $60.00 2nd Offense $80.00 3rd Offense $100.00 After Hours, Weekend & Holiday Release Charge $75.00 1st Offense $55.00 2nd Offense $65.00 3rd Offense $75.00 Actual Cost $200.00 + $60.00 each additional day; actual costs up to $1,500 Ch. 4.20, Article IV $20.00 Sec. 5.36.210 Ch. 5.36, Article III Nuisance Animal $25.00 Ch. 5.36.520 $25 Fee Refunded If Participate in Annual (Club Only)$25.00 the Deer Management Program $100.00 Ch. 5.32, Article VI Fireworks Display $250.00 Minn. Stat. 624.20 Ch. 5.04, Article III 1st false alarm/per calendar year No Charge 2nd false alarm/per calendar year $100.00 3rd false alarm/per calendar year $200.00 4th false alarm/per calendar year $300.00 5th and over false alarm/per calendar year $400.00 Ch. 5.04, Article III 1st false alarm/calendar year No Charge 2nd false alarm/calendar year $100.00 3rd false alarm/calendar year $250.00 4th false alarm/calendar year $350.00 5th & over false alarm/calendar year $500.00 Each Call $50.00 Per Application Officer 119 Rate $160.00 Per Hour Lord Fletchers $130.00 Per Hour Police Reserve Officers $30.00 Per Hour Alcohol/Tobacco Compliance $25.00 Per Hour FIREARMS DISCHARGE PERMIT ANIMAL TRAPPING PERMIT SPECIAL EVENTS PERMIT POLICE SPECIAL SERVICES (3 Hours Minimum) FINGERPRINTING SERVICE FALSE FIRE ALARM USER FEES FALSE POLICE ALARM USER FEES Exhibit G. Public Safety DOGS AT LARGE - RELEASE FEE CARE OF IMPOUNDED ANIMAL LARGE ASSEMBLY LICENSE (over 300 people) ANIMALS AT LARGE (Other than dogs) - RELEASE FEE $0.25 Per Page Up to 100 copies More than 100 pages (actual costs) PHOTOS $10.00 On CD VIDEO Booking Room Video $20.00 Squad Videos $20.00 Body Worn Cameras $50.00 AUDIO BTA Audio $10.00 Paper signs (no lath included)$2.00 each Laminated $5.00 each STATEMENTS $10.00 $50.00 For CD & (transcribed copy or CD when available; subject to Data Privacy Act - will be charged an actual hourly fee) Per Gun (Police Policy 3056)FIREARM STORAGE FEES SIGNS: "NO PARKING ORDER OF POLICE" COPY SERVICE - Police Records $.25/ single sided page plus actual cost for search, retrieve, copy, transmit/device. Brush Site Fees Brush and Branches (< 6"Diameter)$8.00/Cubic Yard Logs (6-10"Diameter)$16.00/Cubic Yard Logs (10-18"Diameter)$40.00/Cubic Yard No Stumps / Dirt accepted Brush Volume Estimates Cost Pick up truck box appx 2.7 Cu 21.60$ Single axle trailer appx 2 Cu 16.00$ Tandem axle trailer appx 7 Cu 56.00$ Ex H. Brush Site First truck load or small trailer is free for Orono residents. One free load per day. (3 cubic yards)