1. Percolation Rate, Type of System.
2.8 minutes per inch. Shallow trench system on the new primary site. The
original site will be retained as an alternate site.
2. Proposed Flow Rate.
4 bedrooms @ 153 G.P.D. = 600 G.P.D.
3. Soil Treatment Area Needed.
600 G.P.D. x 1.;i7 factor = 1000 Sq. Ft.
4. Size and Nu►aher of Trenches.
5 trenches 3 fee: wide and 66.7 feet long = 1000 Sq. Ft. These trenches
would be spaced *7.5 feet apart center to center and be about 0.5 feet
to 1 foot deep in the natural soil.
5. Drainfield Rock Needed.
37.0 cubic yards of rock is needed to have 6 inches under and 2 inches over
a 4 inch distribution pipe.
6. Septic Tanks.
Two septic tanks of at least 1000 gallons are needed. In addition, depending
on the tank elevations, IL may be necessary for a pump and 500 gallon pump-
ing tank to be used.
7. Additional Information.
All construction and materials must adhere to the provisions of the City of
Orono. All grading and construction traffic must be kept off both the prim-
ary and the alternate drainfield sites.
If any other information is needed, please cuntact me.
Sincerely,
PERCOR I C.
Mark S. Gronberg, -r
PCA certified
S- 3S
tt1tCOLATIOH TLST DATA SHEET
Test hole location Bole number
Date test hole vas Depth of hcli bottom, 15 inches.
Diameter of hole, inches.
Soil data from test bole:
Depth, inches Soil texture
`.5..
Method of scratching sidevall ''• F' o -
Depth of pea -sired gravel in botto= of hole, "' inches.
Date and hcur of initial water f:11ing 9:0. Afi //- /r-i 7
Depth of initial eater filling, / Z inches above hole bottom.
Method used to maintain at least 12 inches of waxer depth in hole for at least
4 hours
Percolation test rtadings made by XGe' 6-,)vz on
a:sue
//- IC 47 starting at 4: /y : Maximum voter depth above hole bottom
(date)
dur=ng test, inches.
' y rime ;
Tame i ;ntery al, ': Measurement, Drop in water
! Minutes inches level, inches
Percolation
rate,
minutes per
inch
Remarks
00
n
II
2 1
2. 3
Percolation -veto 0 minutes psr lath.
i• 3S
FERCOLATION TEST DATA SEUT
Test hole location_ f&ellc /3'oYr'r' Hole number
Date test hole was prepared //-/y -''7 Depth of hole bottom, 15 inches.
Diameter of hole, _C_ inches.
Soil data.from test bole:
Depth, inches
O-9
Methoc of sr.V6tt"ir,inR sidewall /,rlLr t'rilir,-�/tc
Soil texture
Depth of gravel in bottom of hole, 2 inches.
Date and hcur . !nitlal Later f,.11i g 9.01. ��� //•��- 7
Depth of initjr. 'llir.g, /2 _ inches above hole bottom.
Mcthod used -.-N . :east 12 i:.ches of Later depth in hole for at least
6 hours
Percolation test reAdings made by A"O'f GOC7-7 on
// /1 j&7 starting at `�': �'C e'm Maximum water depth above hole bottom
(date)
during test, inches.
:ime
Time 1 ;nterval,
! Minutes
'
heasurement,
inches
i Drop in ._r
level, inches
Percolation
rate,
minutes per
inch
Remarks
3
r4
:
23
I I
2
jl � � _'/r
r�' '/�
2.6
/.
i I ' I'1
L
Iq V2, . i
1"U
/o Y;
.�
i
Percolation -rats • Y. U sinutes per Such.
A
i.or;s of Soil Borings
B-27
Location or Ptoject AA-r-4� - 99GYff
Borings made by /,P,f ,� ��F,�v FROPd'e-oF Date //-/4--17
Classifieat:.cn System: AASIV) _-_; USDA-SCS -; Unified other ^_ _
Auger used (check two) : or Power ,; i li �liC
%�. (. or Bucket other
Depth, B)rinR number Depth, Boring number 2
in Surface elevation. in
feet --- -- feet Surface elevation —
0 - -- 0
/K. dRcc�.,v Iwo r tow►M
1 —
dwdc� co�,►+r sAti�
2 —
•
4—
CAA l a4M
End of boring �t .S feet.
Standing Water table:.
Present at __— feet of dqp:h,
he•.rs after bo-?.n .
Not present in b�- -1ng hole
Mottled soil:
observed at _ !Y• G fact of dc: th.
Not present in boring. hole
Observations atd -:ocrments:
D4'. daGc�. J�t�.d � ioai►.�
1
F�cu"v t oe�c r 1'A�-•o
1 2 ---
3 — I I
G1 7A'ICI-N ZaA.rt
I, —
End of boring at .s feet.
Standing water table:
Present ar feet of depth,
hours aftc. boring.
Not present in borin;t hole
Ffottled coil:
Observed at y- S feet of depth.
I!oL' present in boring hula
obser-vutions and comments:
nr�ri:
m
\y
//,is p - py
CITY OF 0R0N0,0,w-_�—
SEPTIC SYSTEM AFPROVAL
LOCATION % 3 N _�CL CYR .
GENERAL. CONTRACTOR f4 ,0 S C H t't L -Z. `17 Z ' O
SEPTIC CONTRACTOR
OWNER
!ApPW!Mrj=::C=VMGE7SBEL7 �� • f ou + �
�—
COMMENTS TAB ►�� eoo — Sa w,1 N . Py+ ;� t' Tin c� k
lS ix � Jt"�.: DG' E' .7 „� �. ._.� r (��� DDT• � i'irMP i�t�C.
a —CA /0-i F:I V L
OFF
B -74 .....r,r�
DATE APPROVED BYt
Y, J I S �ES/C� N�� ` -C-1 Jl''Zr�jn/J
-�-� 1 _, Cam- � �� � . F �� <-,/�.o►�� E�z�, �.�E,s/c.-� ,
System Design
for Paul Boyke
of Lot 1, Block 1, Lauranne Woods
Orono, Minnesota
1. Percolation Rate, Type of System.
13.0 minutes per inch for the primary site (holes 1-4). Shallow Trench System.
2. Proposed Flow Rate. \ /
bedrooms (� 150 G.P.D. = 6E?0 G.P.D. ?A
3. Soil Treatment Area Needed.
Use 2.0 factor x 600 G.P.D. = 1200 Sq. Ft. •
4. Size and Number of Trenches.
J a no
)Ktrenches 3 feet wide and 100 feet long = 1200 Sq. Ft. These trenches would
be ,2-18 inches deep in the natural soil and be spaced a minimum of 7.5 feet
apart center to center.
5. Drainfield Rock Needed.
(e "-cubic yards of rock is needed to have 6 inches under and 2 inches over a
4 inch distribution pipe.
6. Septic Tanks.
Two septic tanks of at least 1000 and 750 gallons are needed. In addition, it
may be necessary to have a third pumpinq tank of�gallons depending on the
final elevation of the septic tanks in relation 6� h� arainfield area.
7. Additional In=orr^aLiun. 1600 Yk-,Ara1r"'M"
All construction and materials must adhere to the provisions of the City of
Orono. All grading and construction traffic must be kept from the primary and
the alternate drainfield sites.
If any additional information is needed, please contact me.
Sincerely,
PERCOR, INC.
(1� be
PCA certified
y -10
h
a
2
v
JOHN L. WWOKO" T'HOI'Lt{'r'i
795 N. F'i'.HNi. ALE HOAR
CRON0,
Percolation
Results
Hole; No.
Material
Y-1
Brn. Se,ndy
Clay Lown
Brn. Sandy
Clay Loum
i-3
Brn. Sandy
Clay Loam
F'-4
Brn. Sandy
Clay Loam
F-5
Brown Clay
Loam
P-6
Brown Clay
Loam
Percolation Hate
17.1 Nin./inch
9.2
11.4
14.1
40.0
40.0
The average percolation rate for holes 1-4(primary site) is 13.0 Min./inch.
Soil Horings
S.B.# 1
Depth(ft.)
Material
0.0-0-4
Black
Loam
O.h-1.0
Yarn.
Sandy
Loamy small rocks
1.0-3.0
Hrn.
Sandy
Clay Loam
3.0-0.0
Gray
Brown
Loam
Mottled toil at
6.9
feet
and eater table at
7.3 feet i.fter
24 hours.
S.B.# 3
UC:Dth(ft.) ;Material
0.0-0.6 Black Loam
0. b-1. 7 Gray L.,own Loam
1.7-h.0 Brown Clay Learn
4.0-6.0 Gray Brown Clay Loam
Mottled soil at 3.8 feet and water table
at 3.8 feet after 24 hours.
S.B.# 2
Uepth(ft.)
Material
0.0-1. 0
Uk .
Brn. San - Lan.
1.0-4.0
Brn.
San. Cl. Ln
4.0-6.6
Brn.
Sandy Loam
4.6-6.0
Brown
Loam
6.0-7.5
Pine
Loamy Sand
7.5-6.0
Gray
Fine Lmy.Sa
No mottled soil and no water
tuble after 24 hours.
SITE hl*%LUATION WORT
JOHN L. BROOKS PROPERTY
795 N. PhRNDeLE ROaD. ORONO
6-10-80
On June 89 1980 one proposed lot was tested for the suitability
of cupparting a draIntield systew* six rersolation holes were bested
cnd 3 soil boringe token on the proposed lot. Percolation Loxes were y
i
dua 6 inchoo in diameter to a 42 inch depth while the soil borings 3�
tjovo dua 6 inohoa in d1amter to a 4 toot depth and 3 inches in dia- f
t~:)tcr to trio rcmainina depth. the porsolation doles were dtg by both
::1 cad pa -.:or auaors while the soil borinae were dug by bucket type
p:�cYscc3 ]at le locatod in tho M7don Loan soil series whic:s
chJ r_c�c: ato2y porsotble. ?ho prinary alto yielded a fairly
rato or 13.0 miautoo por inch and the wator table Is
to c:.ot the veS::irc=nte for a otc7Aaz%d draintield syotca.
%:c7o alocor to tho drain;e c:?ale ca the proparty luadirZ
c- -,I cc:: cinod vzwo city coilo. C_aa roasitod in a clover
.'.�. Z1,e 3 t:.2 the vo;;cr table was hlr2:::. A ohalla:� tronch cya-
y...
L' .:a -i uocd it ovo. hooded ca taio nitoz.iate alto and the trcao-
1:�n c,_ frcm holoo 5-6 as r--ioh co pccaible.
:al do:!-n irfc_=tica alil bo c,00 tL3 site wMf
c:•o Lac::a. it -=Id to pcoolble to locato
rAto= up tho hill Coro in botL•c7 soil dopcadlna on whore
r : ?,a LcVc,,vd. Ploaco ccataot r:a nt that t" 3v cL, it cny oti,cr
Gc :.] Up*
i
a:nooroly/
vzacoag a.
t;:rlt a. Ororborep P.E.
i
1
JOHN L. BROOKS PROPERTY
795 N. FMDALE ROAD
ORONO. MIURESOTA
Percolation Results
Pe�g„ti_enRate
P•1
Bras Sandy Clay Loami
17.1 Min./ineb
:c?
Bra. Bandy Clay Loan
9.2
P-3
Bras Sandy Clay Loan
lu$
:•''
Goa. Sandy Clay Loon
Ls.l
l'•
Brmin Clay Loan
40.0
C.^c:.-a Clay Loca
40.0
r_� �a3atiaa rat* for Lolea 1-4jprjz r site) is 13.0 ISin./inch.
0.0-200 Me Crag arm.Ln.
1.Q1460 L:n. Ccn. C1. Y._.
4.0a't.6 Ca. Scsi3y La
Crc::a Loci
r"f; e.:.1 we"r t":ta nL
6.0-7•5 Fiao Loot La :1
i •`'��•0 Gray Me 4:�.�u
is j ::)"".cd ac'!1 and no rntc:•
tat)% a1:t;or 24 hours.
r•
�
I
G2.r J T ,...,
a a 3.3 c_.9 uaCc,.• L: Flu
1
i
t
TOt Jeanne Mabusth, toning Administrator
FFOMs Michael Gaffron, On -Site Systems Manager
DATEt June li, 1980
SUBJECTS #551 SUBDIVISION - John L. Brooks, 795 North Ferndale load
The site evaluation report for the Brooks application has been submitted
aril rcvictred. Soils were found to be suitable for a standard drainfield
cy:,tcm. ' I.Sy boring on the site verified the soil types indicated in the
rcv or4. Tho lot with the existing home has ample area for future
drainfield should it ever become necessary. I would recommend approval
of ttie subdivision. If all of Orono had soils such as found on this
:Tito, we would have few sept3c system problems throughout the City.
• C' RT.400627
Y£RCOLATION TEST DATA SHEET
a.m.
Vercolation test readings male 4 S—P Testing, Inc. on 9 — 2 9 — 8 9 starting at 9: 04 p,m,
Lot1,B1k.1,Lauranne wooOrono 3 9-28-89
Test hole loca'iort . ore numRr Date hole was prepare
Depth of ho!e honom � ` _inches. Diumelf— of hole inches
Soil 0'111! froun'est hole:
Depth, inches Soil texture
0 - 12" Topsoil dark brown sandy loam
Mefliod of scratching sidcwal! Knife
2
Depth of gravel in hottom of hole inches
9-28-•89 9h0Rap 12
D:nc and hour of initial water fill*'pt o initial water filling� inches above hole bottom
%leillod used to nia.nlain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6 •
Maximum water depth above hole bottom during test inches
I Time i
ime interval. Measurement, ( Drop in water
minutes inches level, inches
Percolation
rate,
minutes per
inch
Remarks
1:52 prefi11 6
1:04 9:34 i 4-3/4
6.3
30 min
1:38 10:08 j 4-7/16
6.8
w «
'0:09 10:39
4-1/4
7.1
I
i
-
I
I
Perco:ation rate = 6.7 minutes net inch.
-z
�r
1
f?
y�
sin
..
x0
I
I ,
O
TT
N
r�r
r_
O
OC
Z
<
1
1 Xis
C
Qq
�q
V
a
V
N
JL
5
w<__�
�N
Air
cA
i�
�,
`�
�m
ag
x
x�
was
aim
o
s
r
2P%
r
1 �
Iow <
a
I�Iril
1 r
�'',A
»: �
IT
r
FCA
-
o
Z
M
4.
L i ....� : .L ter' - /%T - • — MOUND WILL e' • S' ,
•. �: �: iL' "` TO ALLOW FOR
SETTLikG
17--GRASS COVER
,. • �``� •\/ •i—`----r- ---i� C TO YI' Oi SOIL
�� •i 1 I� �r i��•1Y' .�
24 COVER ABOVE ROCK
2M' TO 2 1/2, 01A.
CLEAN ROCK
- LATER OF NNWIMPXTED
,�. ►EAT OR STRAW COVE WITH
REO ROSIN PA►[R OR TEXTILE FABRK
— ' 1N T BOTTOM
LEVEL
- ' •1--•-2' MINIMUM ROCK COVER ABOVE PIPE
-•' YINI►R1Y *OCR DEPTH SElO1M P
2A' MAXIMUM ROCK DEPTH BELOW PIPE
- AIL M440 PERFORATED PLA+TIC PIPE WITH ONE ROW OF
NOL ALONIS SOT TOM
--WATER TABLE OR IMPERVIOUS LAVER SUCH AS CLATPMN, ROCS LTC.
TRE�N�C�H� ROCK Ito WITH((R R11�1AAR�i�M
T ~OPI T NEXT. FA/[R TI�JISUMTR[AT[O @UaLDIN6 r oil
4,OULMETWITH COITION
CARTN BACKFILL AT L T
t' ABOV[ TOP Of ROCK
L A� LEAST B' DEPTH Of CUZAM
• /IOCK �l�' TO i l/= OIA. S[[ NOT[ !).
OROP BON -
I+ MA7DMAUM L[NaTN • IOO f[[T
OVERFILL
NOTES' I.
BOTTOM OF TR[NCH MUST B[ LEVEL. TOP Of TOM14
r- ot TO s INCN[S'
ROCK MLAT B[ LEVEL.
L
�
INSPECTION
`W LL 2.
SLQ/t �OI�TRI lope
s N�II� IS B[Tyl[(N
f[R.
MIs• �
R[COIAM[ 11111 1s LEV[LL
1
�{/ IpN y�
INS�TKL& C
'A�110C�'vOVIE
7F*AC,K.1F'I,LL
.-'SACNfILL
�
KLMI'
,�.IAMIIC�L 0O
N
�T- I AST 1000 r
.f
AT LIEAST ir OF 4.
MAINTAR1 MATUIYIL SOIL STRUCT%M N1 TN1t
i w KIAW
TR[NCH N CONTACT VAT1R1 MOCK.
�• ]0'
PRaIP
—L NOT[ M LWANMM�War
TSUUMAM
LI fYfT1TY•BM
IB' TIO
---..�
1! KIM" ap ROd1 LftKft
T1K OISTAISIYTIORI MIL
TRENCH CONSTRUCTION DETAILS
VERTICAL SIDEWALL SEPTIC TANK
FINISHED GRADE
nT LEAST Is AT LEAST Not
4" DIA 6" T 12" SOI 4" DIA.
COVER
MIN — AT T LEnST_I" _ � AT LEAST I"
_1 I A
I A DIMENSIONS FOR TANKS WISH VERTKAL_SIpES
WIDTiW 4 MINIMUM_ -
LENGTH,_L 2 TO J 11MES THE W_19TH
blA11AETER GO MM_IIMUM
�j dE1'TH`6 30 MINIMUM;_TO- MAXIMUM_. C !
2.0 —� -
AT LEAST "g' 6" MINIMUM; 0.2 MAXIMUM _ 6'
3" --c 0-4 0 _1
AT LEAST 4 FEET
rIu l I s
I tN•1NIr Ills 111 UIIt1 800.1411 WONlI Irn • ►W.I(lt wvt(rrwts►ou(lo(*Ilnluua4s
r UIt I� %IWI IK lar onf,11IM lanpus prof AtI I att Wl lint■ WAIT M 1W NO Ell tor l.( St" AM
IIII:IK(*11WtlIIr.11Rlt nn- II/ I I It I U A11/11I/I
wN111
IW11ll. Ml(sl(II 1ll1 f� IVpI WtW rIr swum
"IC IocwrfrdhMIbM(Is74!
pnArwlOtESwII*LowtotMnRfu(►ENft on mu Mw(lss ll Wllucr!
M(nrlun[IUlvs'ts11tICVUWI�•C(Yulrr9l'lC1W I rinI"stUmIAtCYLIOVW-11tAwe o1M[NRayl.11svia
r m, I, v"t 1t 11 f sme As l r 4 (is i, to I lrr n 111! AMn OM NIKIt t 11 / MI1
IIN I It pl[ MIIoli Orl •Nw INv III S A 11 O■) wv♦ c IC"
., NGIM IOGIKUM I"I rw nOr II!I Ni,(amI I
. MI I IS
IV
(
INLET SCUM
f r;'•;OIITLET LEVEL i
t — SCUM CLEAR SPACE" fi
;• —ter -
SLUDGE 1i
to Ir
OUTLET
>r
CLEAN OUT TANK W►KEN:
X IS 3' OR LESS OR
'W IS 12* OR LESS
w
ACK COLOR
. I FROM LISLUME
1p
MEASURE SCUM AND SLUDGE ACCUMULATIONS
IN THE SEPTIC TANK
WATEq TIGIIT 5 LOCKABLE ELECTRIC BOX— �RATEp'
TRPp3TT 4 X 4 MM)
PLUGS OR ELECTRIC CONNECTIONS F.V ELECTRIC CONVECTIONS MADE
2" PVC CONDUIT SCHEDULE BO _ DE Bo
MANHOLE COVER CHAINED 9 LOCKED T 6 S<'ACE / LOOP MEPOWER CORD FOR
NT
SEALED MANHOLE RINGS /
SEALED TANK COVER
PLASTIC ROPE OR CHAIN
WITH ANCHOR ---��
ALARM FLOAT ON SEPARATE
ELECTRICAL CIRCUIT--
START_LE_VEL_ V - _ Lr
3"
SHUT - OFF- LFVE(,_Q — _
PUMP CONT140L FLOAT
F " AT I-Ff6T 12' "")N
BELOW GRADE
WIRE FROM POWER SUPPLY
PIPE IS LAID ON A UNIFORM SLOPE FROM
P&IPJTATION UP TO SOIL TREATMENT AREA
FFu+ P�►++OPER DRAINBACK
IF PIPE AT TANK MUST BE LOWER THAN
UNION TO GET ELEVATION FOR DRAINBACK.
A I/4 INCH WEEP HOLE MUST BE USED
— WEEP HOLE
NOTES: ELECTRICAL WIRE FROM POWER SUPPLY
MUST NOT RUN OVER ANY TANKS BU1
MUST BE LAID BESIDE OTIIER TANKS
AND MUST BE PLACED IN CONDUIT
ALONG POST
ELECTRICAL CORDS FROM PUMP AND
FLOATS MUST BE RUN THROUGH
CONDUIT WIRES CANNOT HAVE GROUND
CON 1 AC T
Figure F-N
MET
COVER
METAL ---,
CONCRETE
MANHOLE
RING
METHODS OF SECURING MANHOLE COVER TO PREVENT
UNAUTHORIZED ENTRY
Figure C-14