Loading...
HomeMy WebLinkAbout1990-07-02 On Site Sewage Treatment Inspection ReportON -SITE SEWAGE TREATMENT INSPECTION REPORT On thr :Forth ,Shore oj. lake 9linnetonka POST OFFICE BOX 66 1335 S. Brown Rd. Crystal Bay, MN 55323 473-7357 OWNER S 017 v nfdlln� -- ADDRESS 1��r PERMITNO.'S. DATES -9�F,;� CONTRACTORS E d�Al�bl'1S City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspected or. a regular basis. The on -site sewage treatment system at the above address has been inspected and appears to fall into the category checked below. (This is Qd an existing system ❑ new construction) 01 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating properly. 2 Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, located, and constructed generally in accordance with previous codes. System appears to be functioning properly: no major upgrading of the system is required at this time. ❑ 3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at this time. 04 'Vs le may or may not meet current City standards for design, construction or location, but is failing to properly treat and disr ,e o! the current input, and is endangery supply, or is a source of pollution to surface or groundwaters, or is c, ling a safety hazard, or is otherwise creatie nuisance. Please cumact the City Inspector to discuss system repair/ dplacement procedures. If dramfield replacemt >sary, soil testing will usually be required, and a design and site plan must be Lubmrtted for review. Your contractor m .:in a permit before work is started. SYSTEM CONDITION 10 Checked items may require your action) Tank inspection indicates: ❑ Pumpout not needed at this time. Solids accumulation in tanks indicates they should be pump- ed out this year to help prevent future problems. ❑ Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible. ❑ System is discharging to surface. Tanks must be pumped within 48 houts to eliminate surface discharge. ❑ Inspection risers ussing—tanks could not be inspected. Inspection risers 14" dia, pipe) must be installed in each tank at next pumpout. If tanks have not been pumped out within the last three years, they should be pumped out now. SITE CHARACTERISTICS Limiting Site Factors ❑ Slope U Soil ❑ !irgh water table ❑ Lot size ❑ Lake, wetland, or stream 17 Drainage COMMENTS Date of Inspection ❑ Inspection pipe is located directly over tank baffle. (Does not give accurate measurement of solids accumulation.) If tanks have not been pumped out within the last three Veers, they should be pumped out now. Drainfield inspection indicates CW Drainfield is dry, no surfacing evident. ❑ Some evidence of surfacing, not critical yet. ❑ Drainfield is saturated and visibly discharging untreated effluent to the surface. This condition may require replace- ment or additions to dramfield. Contact the City Inspector immediately. Repairs must be completed within 90 days. ❑ Drainfield extent and condition unknown. Potential for System Failure Site Capabilities for (depends on soil types, water Future Expansion table, and system condition( ❑ Adequate 56 Low Fair ❑ Medium Poor ❑ High ❑ Inadequate ❑ System is causing visible surface discharge. �eptiLm Inspector Note. In the event that this inspection report is used to satisfy the •equirements lot a mortgage or other transfer of property, be advised that this report does not guarantee or certify that an existing system will continue :o function properly, but is merely an opinion of the adequacy of the system under current conditions based on the ava:lable information This report must tX' kept tin the premises with syslern location and pumping records. W JITE COPY i Inspector s F de GOLD COPY , Homeowner