HomeMy WebLinkAbout1989-09-15 Septic System Approval//VSP C-0 PY",
C SYSTEM APPROVAL
Permit ,
Pa• _ ?s S°
Rntered my
The deneral Contractor will be given a copy of this report and is
responsible for its distribution to all sub -contractors. Septic system
design is mot oonsidered as approved unless this sheet is attached.
LOMMO■: �S /VO4" F&"bAt-t le*AjN
pp
�i► COltRht.'SOR: L N N D GK� W k t� S �1 LMJ Lti tiD G►'�r ► � 7 3- /2 3/
8XMC COS27AC2Ms gnaws
aw zz-7o#N gee-G y-):-12 3 J
13 PROVED
CONDITiOiiALLY APPROVED s Note Changes Below
,•. i - rY
- 'M d m N D i /D X �3 , t'Z,ock �E T, A
2 eene G g ory WC, �t4/6 Au
D i U f r2T NEA /Aj A r f 4 5 N orpo O +i S i rr r-)t =a tj
=E1tj b -Vtk 1Fy ?HMP A.DUM Ac y
LcTf At-(- 7T-4fFIc OFF LCAINF/Fi i\..� SI-rE . .
NOTICE TO INSTALLERSs Any chanryes to the approved plan and specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
RMCM TO GOAL CONTRACTORS: Drainfield sites must be protected prior to
and after system installation to avoid compaction of the natural soil.
Drainfield areas must be fenced off to eliminate all traffic over them.
Date Approve By